Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.8 CrAdmitted-Finance VPO KAHRI DISTT HOSHIARPUR | KAHRI | HOSHIARPUR | PUNJAB | -1.00% | ₹1.8 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.9 Cr+₹10.7 L (6.06%)Admitted-Finance | +5.00% | ₹1.9 Cr+₹10.7 L (6.06%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | - | Rejected-Technical Affidavit for correctness of information and experience of works of similar nature not uploaded. |
| 4 | Rejected-Technical | - | - | - | Rejected-Technical GSTR 3B not uploaded. |
| 5 | Rejected-Technical | - | - | - | Rejected-Technical Affidavit for correctness of information not uploaded. |
Tender Value
₹1.8 Cr
EMD Value
₹3.6 L
Closing Date
14 Sept 2026, 4:00 pmClosed
Executive Engineer
PWD RnB Division Rajouri
Restoration and Preservation of Chingus Sarai.
2026_PWDJK_323933_1
e NIT NO 81 OF 2026-27 Datrd 05-09-2026
Open Tender
Civil Works
Percentage
Rajouri
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
Executive Engineer
₹3.6 L
18 Sept 2026
8 Sept 2026
15 Sept 2026
8 Sept 2026
14 Sept 2026
8 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 90 | 100 SQM | 1,249.1 | ₹1,12,419 |
| 2 | De vegetation from the monuments by chemical injection of Round Up (arsenic base) compound and subsequently uprooting of all girth and any height by physical means without damaging the historic fabric and structure of the building under strict supervision of conservation architect/site incharge, removal of rubbish up to a distance of 50 m outside the periphery of the area cleared, complete. | 196 | SQM | 801.78 | ₹1,57,148.88 |
| 3 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm indepth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth
lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge.
2.6.1 All kinds of soil : | 61.2 | CUM | 592.9 | ₹36,285.48 |
| 4 | Filling available excavated earth (excluding rocks) in trenches, plinths, sides of foundations etc. not exceeding 20cm in depth; consolidating each deposited layer by ramming and watering, lead upto 50m and lift upto 1.5m | 18.4 | CUM | 218.4 | ₹4,018.56 |
| 5 | Demolishing cement concrete manually/by mechanical means includingdisposal of material within 50 meters lead as per direction of Engineer-incharge:
15.2.2 1:4:8 or leaner mix (i/c equivalent design mix) | 185 | CUM | 1,064.55 | ₹1,96,941.75 |
| 6 | Demolishing brick work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge: 15.7.2 In lime mortar with old mughal bricks | 62 | CUM | 1,261.25 | ₹78,197.5 |
| 7 | Dismantling dressed stone work ashlar face stone work, marble work or precast concrete work manually/by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 meters lead as per direction of Engineer-in-charge:
15.10.1 In lime mortar | 15 | CUM | 1,037.55 | ₹15,563.25 |
| 8 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within 50 meters lead :
15.12.2 Of area beyond 3 sqm. | 2 | EACH | 390.5 | ₹781 |
| 9 | Disposal of building rubbish / malba / similar unserviceable, dismantled or waste materials by mechanical means, including loading, transporting, unloading to approved municipal dumping ground or as approved by Engineer-in-charge, beyond 50 m initial lead, for all leads including all lifts involved. | 435 | CUM | 142.22 | ₹61,865.7 |
| 10 | Demolishing lime concrete manually/by mechanical means and disposal of material within 50 meters lead as per direction of Engineer-in-charge. | 30 | CUM | 602.8 | ₹18,084 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.70 MB
BOQ_1091780.xls
BOQ • 0.46 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .