Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.5 L
EMD Value
₹5,080
Closing Date
20 Jul 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Jal Shakti IFC Division Sopore
Executive Engineer Jal Shakti IFC Division Sopore
Construction of fall on Muqam Putkhah khul branch of Delina Wagoora khul at Village Muqam
2022_IFC_178778_5
e NIT No. 08 of 2022-23 IFCD Sopore
Open Tender
Civil Works
Item Rate
20 days
Sopore
Please refer Tender documents.
6 documents required · 6 mandatory
₹300
Executive Engineer Jal Shakti IFC Division Sopore
₹5,080
21 Jul 2022
13 Jul 2022
21 Jul 2022
13 Jul 2022
20 Jul 2022
14 Jul 2022
Amount
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. Incl all leads and lifts disposed easth to be levelled and neatly dressed incl filling of trees opf any girth and height, extraction of roots nd stacking of unservicable material if required (Complete job) (R.T.Q)
Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed:All kinds of soil :
Providing and laying of dry stone soling hand packed (Nallah boulders)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, walls (any thickness) including attached pilasters buttresses, plinth and string course fillets, kerbs and steps etc.
12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 coarse sand)
Carriage of materials from source to Dumping site of work by M. T. including cost of loading, unloading and stacking.
Stone Soling for avg. lead 10 Kms
Stone agg. 40 mm nominal size for avg. lead 20 Kms
Stone agg. 20 mm nominal size for avg. lead 20 Kms
Sand for an avg lead 15 kms
Cement for avg. lead 10 kms
Carriage of materials from road side to actual site of work by H/L. 200 mtrs
Stone Soling
Stone agg. 40 mm nominal size
Sand and 20 mm agg
Cement
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .