THE ADMIRAL SUPERINTENDENT
NAVAL SHIP REPAIR YARD,NAVAL BASE,KARWAR-581308
REPAIR/OVERHAULING OF HULL AND DOUBLER VALVES ONBOARD P-75 SUBMARINE
2024_NAVY_645239_1
REG/P-75(II)/HV and DV/2023-24/0552
Single
Marine Services
Item Rate
90 days
NAVAL SHIP REPAIR YARD, NAVAL BASE, KARWAR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹2.3 L
Yes
19 Mar 2024
5 Mar 2024
19 Mar 2024
5 Mar 2024
18 Mar 2024
6 Mar 2024
Amount
Inspection of isolating valve EG00102, EG00104, as per JIC EG-07-D-001. a. Degutting of valves b. External visual inspection. c. Dis-assembly and internal visual inspection. d. Dimentional inspection as per ETM/MRC. e. Replacement of mandatory spares. f. Cleaning and assembly. g. Pressure test as per ETM after repair. h. Inspection and test reports. J. Packing and delivery to NSRY(Kar). K. Regutting of valve. l. Onboard presssure testing.
Carry out general inspection of discharge internal valve to snorkel line-BM00016 as per JIC BM-01-D-021. a. Degutting of valves b. External visual inspection. c. Dis-assembly and internal visual inspection. d. Dimentional inspection as per ETM/MRC. e. Replacement of mandatory spares. f. Cleaning and assembly. g. Pressure test as per ETM after repair. h. Inspection and test reports. J. Packing and delivery to NSRY(Kar). K. Regutting of valve. l. Onboard presssure testing.
General inspection of BQ00125, BQ00166 valves as per JIC BQ-33-D-001 a. Degutting of valves b. External visual inspection. c. Dis-assembly and internal visual inspection. d. Dimentional inspection as per ETM/MRC. e. Replacement of mandatory spares. f. Cleaning and assembly. g. Pressure test as per ETM after repair. h. Inspection and test reports. J. Packing and delivery to NSRY(Kar). K. Regutting of valve. l. Onboard presssure testing.
Carry out general inspection of suction external valves BM00040 as per JIC BM-01-D-017. a. Degutting of valves b. External visual inspection. c. Dis-assembly and internal visual inspection. d. Dimentional inspection as per ETM/MRC. e. Replacement of mandatory spares. f. Cleaning and assembly. g. Pressure test as per ETM after repair. h. Inspection and test reports. J. Packing and delivery to NSRY(Kar). K. Regutting of valve. l. Onboard presssure testing.
Carry out general inspection of discharge external valve to snorkel line-BM00011 as per JIC BM-01-D-020. a. Degutting of valves b. External visual inspection. c. Dis-assembly and internal visual inspection. d. Dimentional inspection as per ETM/MRC. e. Replacement of mandatory spares. f. Cleaning and assembly. g. Pressure test as per ETM after repair. h. Inspection and test reports. J. Packing and delivery to NSRY(Kar). K. Regutting of valve. l. Onboard presssure testing.
Inspection of valve EN00011 as per JIC EN-06-D-002. a. Degutting of valves b. External visual inspection. c. Dis-assembly and internal visual inspection. d. Dimentional inspection as per ETM/MRC. e. Replacement of mandatory spares. f. Cleaning and assembly. g. Pressure test as per ETM after repair. h. Inspection and test reports. J. Packing and delivery to NSRY(Kar). K. Regutting of valve. l. Onboard presssure testing.
Inspection of internal hull valves DN00112, DN00212 and DN00312 as per JIC DN-01-D-003. a. Degutting of valves b. External visual inspection. c. Dis-assembly and internal visual inspection. d. Dimentional inspection as per ETM/MRC. e. Replacement of mandatory spares. f. Cleaning and assembly. g. Pressure test as per ETM after repair. h. Inspection and test reports. J. Packing and delivery to NSRY(Kar). K. Regutting of valve. l. Onboard presssure testing.
Inspection of external hull valves DN00111, DN00211 and DN00311 as per JIC DN-01-D-002. a. Degutting of valves b. External visual inspection. c. Dis-assembly and internal visual inspection. d. Dimentional inspection as per ETM/MRC. e. Replacement of mandatory spares. f. Cleaning and assembly. g. Pressure test as per ETM after repair. h. Inspection and test reports. J. Packing and delivery to NSRY(Kar). K. Regutting of valve. l. Onboard presssure testing.
General inspection of Cupola front leak indicator hull valve BH00103 as per JIC (MRC BH-19-D-001). a. Degutting of valves b. External visual inspection. c. Dis-assembly and internal visual inspection. d. Dimentional inspection as per ETM/MRC. e. Replacement of mandatory spares. f. Cleaning and assembly. g. Pressure test as per ETM after repair. h. Inspection and test reports. J. Packing and delivery to NSRY(Kar). K. Regutting of valve. l. Onboard presssure testing.
General inspection Leak indicator hull valve BH00101, BH00102 as per JIC (MRC BH-13-D-001). a. Degutting of valves b. External visual inspection. c. Dis-assembly and internal visual inspection. d. Dimentional inspection as per ETM/MRC. e. Replacement of mandatory spares. f. Cleaning and assembly. g. Pressure test as per ETM after repair. h. Inspection and test reports. J. Packing and delivery to NSRY(Kar). K. Regutting of valve. l. Onboard presssure testing.
Degutting / Regutting
Onboard Trials
stage.html
html • 0.01 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .