Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.0 LAccepted-AOC | ₹12.0 L | L1 | Accepted-AOC Work allotted |
Tender Value
₹12.7 L
EMD Value
₹25,380
Closing Date
14 May 2025, 11:00 amClosed
Executive Engineer (C-II)
Executive Engineer (C-II), Thapar Hall, PAU, Ludhiana
Renovation of R and A (RPTO-2) Lab in the department of Farm Machinery and Power Engineering, College of Agricultural Engineering and Technology, PAU, Ludhiana
2025_PAU_138733_2
Endst. No.13-A/c/2025/1275-1300 Dated- 16.04.2025
Open Tender
Civil Works
Multi-stage
153 days
PAU
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
₹25,380
2 Jun 2025
16 Apr 2025
15 May 2025
16 Apr 2025
14 May 2025
16 Apr 2025
Amount
Removing Rolling Shutter at site i/c re-rolling and stacking it at site complete in all respects with the satisfaction of Engineer-in-Charge.
Providing & Fixing in position PVC Wall Delby 12" wide Panelling with heavy Quality material including all good quality necessary fittings complete in all respects with the satisfaction of Engineer-in-Charge.
Providing and fixing Window Blinds of good quality with all sizes and colors complete with good quality necessary fittings complete in all respects with the satisfaction of Engineer-in-Charge.
Providing and fixing toughened glass 5mm thickness in aluminium door, window, ventilator shutters and partitions etc. with PVC Gasket and necessary fittings complete in all respects with the satisfaction of Engineer-in-Charge.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .