Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance VPO SARPARA TEHSIL RAMUPR DISTT SHIMLA H P | SARPARA | SHIMLA | HIMACHAL PRADESH | Admitted-Finance |
| 2 | Admitted-Finance V P O LABANA SADANA TEHSIL RAMPUR DISTT SHIMLA H P | LABANA SADANA | SHIMLA | HIMACHAL PRADESH | Admitted-Finance |
Tender Value
₹11.7 L
EMD Value
₹23,500
Closing Date
11 Oct 2023, 9:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EE Rampur
EE B and R Division HPPWD Rampur
SH C.o PCC R.Wall along with toe walls at Km 1.150 to 1.172
2023_PWD_79782_1
PW/RMP/TA/2023-10142 dated 29.09.2023
Open Tender
Civil Works - Roads
Item Rate
EE B and R Division HPPWD Rampur
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
Yes
EE Rampur
₹23,500
Yes
25 Oct 2023
5 Oct 2023
11 Oct 2023
5 Oct 2023
11 Oct 2023
5 Oct 2023
5 Oct 2023 - 11 Oct 2023
Amount
Excavation in Hill area by manual/mechanical means:- Excavation in soil in hill areas all heights and depth in all kind of soil including saturated soil comprising of mixed soil, ordinary rock and hardd rock all work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion, damage to hill side, water pollution etc. and to protect stability of hill side. Rock shall be excavated with chiselling and wedging out rock( where blasting is prohibited) including cutting and trimming of side slopes and disposing of excavated earth with a lift upto all heights and all leads as directed by the Engineer-in-Charge, in conformately with the requirement of technical specification of rural roads clause 1603.1 all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases.
Earth work in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all leads , dressing of sides and bottom and back filling in trenches with excavated suitable material in ordinary soil upto all depth. as directed by the Engineer-in-Charge.all useful material such as stone, shingle, aggregates& slate etc. shall be sorted out and stacked along the road side properly. Any loss to the public and private property to during the course of execution shall be the absoulte responsibility of the contractor which shall have to be duly compensated by him in all cases.
Providing and laying cement concrete 1:6:12 (1 Cement:6 Sand: 12 graded stone 40 mm nominal size) fir plain /reinforced concrete in open foundations complete as per drawing and technical specification clauses 802,803,1202 and 1203 . including hauling of material in all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge.
Providing and Laying cement concrete for plain/reinforced concrete 1:4:8 (one cement: four sand: eight graded stone aggregate crushed 40mm (forty milimetre) nominal size mechanically mixed and vibrated in open foundations complete as per drawing and MORD Technical Specification clauses 802, 803, 1202 and 1203 and as per the direction of the Engineer-in-Charge including carriage of material through all modes of transportation within all leads and lifts and other incidentals.
Providing weep holes in brick/ stone / plain reinforced concrete abutment, wing wall, return walls with 100 mm dia PVC pipe extending through the full width of the structure with slope of 1V : 20H towards drawing face complete as per drawing and technical specifications clauses 614, 709 and 1204.3.7 including carriage of material within all leads and lifts and other incidentals. including hauling of material in all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge.
Backfilling behind abutment, wing wall and return wall complete as per drawings and technical specification clause 1204.3.8 with granular material. including the cost of form work and hauling of material in all leads and lifts as per the entire satisfaction and direction of the Engineer-in-Charge. including hauling of material in all leads and lifts as per the entire satisfaction and direction of Engineer-in-Charge.
JAGDISH KUMAR GOVT. CONTRACTOR
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .