| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹81.8 LAdmitted-Fee/PreQual/Technical/Finance | -15.57% | ₹81.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹83.7 L+₹1.9 L (2.35%)Admitted-Fee/PreQual/Technical/Finance | -13.59% | ₹83.7 L+₹1.9 L (2.35%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹84.0 L+₹2.3 L (2.81%)Admitted-Fee/PreQual/Technical/Finance BARUAKANDI DHARMANAGAR NORTH TRIPURA | -13.20% | ₹84.0 L+₹2.3 L (2.81%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L4₹84.1 L+₹2.3 L (2.84%)Admitted-Fee/PreQual/Technical/Finance | -13.17% | ₹84.1 L+₹2.3 L (2.84%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L5₹85.2 L+₹3.4 L (4.20%)Admitted-Fee/PreQual/Technical/Finance | -12.02% | ₹85.2 L+₹3.4 L (4.20%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹96.8 L
EMD Value
₹1.9 L
Closing Date
14 Sept 2026, 3:00 pmClosed
The Executive Engineer, DWS Division Dharmanagar
Office of the Executive Engineer, DWS Division Dharmanagar, North Tripura PIN _799250
Construction of PWD (DWS) Sub-Division office at Dharmanagar North Tripura during the year 2026-27/SH- Construction of ground floor including internal water supply and Sanitation Installation. (Balance Work).
2026_CEDWS_76615_1
09/SE/DWS/C/KGT/2026-27
Open Tender
Civil Works - Water Works
Percentage
180 days
Dharmanagar
Please Refer Bid Document
6 documents required · 6 mandatory
₹4,000
₹1.9 L
16 Sept 2026
2 Sept 2026
14 Sept 2026
2 Sept 2026
14 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.000 | A)Sub Head : Site development in/c all allied works
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 1,500 | sqm | 9.4 | ₹14,100 |
| 0.000 | Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery of the area cleared. | 1,125 | sqm | 4.8 | ₹5,400 |
| 0.999 | B)Sub Head : Earth work & Demolishing work.
Demolishing reinforced cement concrete manually / by mechanical means including stacking of steel bars properly and disposal of unserviceable material with all lifts and upto 50 m lead etc. complete as per direction of the Engineer- in-charge. | 13.32 | cum | 2,087.3 | ₹27,802.84 |
| 0.000 | Demolishing brick work including stacking of serviceable materials and disposal of unserviceable materials with all lifts and upto a lead of 50m etc. complete as per direction of the Engineer- in-charge:-
In cement mortar. | 28.35 | cum | 1,145.4 | ₹32,472.09 |
| 0.999 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
-All kinds of soil | 144 | cum | 231.6 | ₹33,350.4 |
| 0.000 | Supplying and filling in plinth, under floor, foundations etc. with sand (fine) from local quarry with all lifts including spreading in horizontal layers, watering, grading to required slope, ramming, consolidating and compacting each layer by using plate compactor or by any suitable method complete. | 144 | cum | 1,177.3 | ₹1,69,531.2 |
| 0.000 | C) Sub Head : Concrete Work.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering -
'-All work upto plinth level:
1:4:8 ( 1 Cement: 4 fine sand : 8 graded stone
aggregate 40 mm nominal size) | 36 | cum | 9,960.7 | ₹3,58,585.2 |
| 0.000 | D) Sub Head : RCC Work.
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and skirting courses, fillets, columns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centring, shuttering, finishing and reinforcement-
1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 14.12 | cum | 13,305.8 | ₹1,87,877.9 |
| 0.999 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto floor five level excluding the cost of centring, shuttering, finishing and reinforcement-
1:1½:3 ( 1 Cement: 1½ fine sand : 3 graded stone aggregate 20 mm nominal size) | 112.39 | cum | 13,584.5 | ₹15,26,761.96 |
| 0.999 | Centering shuttering including struttings, propping etc. and removal of form work for:
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. using shuttering ply | 6.6 | Sqm | 496.1 | ₹3,274.26 |
stage.html
html • 0.02 MB
finance_77990.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.75 MB
BOQ_77990.xls
BOQ • 0.39 MB
DNIeT09SE.pdf
Tender Documents • 2.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .