| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrQualified 232 NARSIPURAM MATHURA UTTAR PRADESH 281006 | MATHURA | UTTAR PRADESH | 281006 | ₹1.7 Cr | L1 | Qualified MSE, Category: General |
| 2 | L2₹2.0 Cr+₹31.6 L (19.0%)Qualified | ₹2.0 Cr+₹31.6 L (19.0%) | L2 | Qualified MSE, Category: General |
| 3 | L3₹2.2 Cr+₹52.6 L (31.5%)Qualified D 4 276 KH NO 424 FIRST FLOOR BHAGEL SADAN BANK COLONY ROAD MANDOLI EXTN NEAR JAIL BOUNDARY DELHI 110093 | DELHI | DELHI | DELHI | 110093 | ₹2.2 Cr+₹52.6 L (31.5%) | L3 | Qualified MSE, Category: OBC |
| 4 | Disqualified | - | - | Disqualified MSE, Category: General |
Tender Value
₹3.1 Cr
EMD Value
₹6.1 L
Closing Date
30 Jun 2025, 12:00 pmClosed
Systems/Equipments (Version 2) - RR Site 3 and 4; NON RADIOACTIVE AREA Welding of Alloy to CS or Alloy to Alloy pipe and pipe fittings and completion of weld by GTAW or SMAW process End condition BW NW..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; NON RADIOACTIVE AREA Dye Penetrant examination of weld joints End condition All for details refer BOQ item No 9 in SOW and 01 bid quantity is equal to 7..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; NON RADIOACTIVE AREA Cleaning of pipes and pipe fittings with rotary wire brush and Erection of pipes and pipe fittings in field as per layout of drawin..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; NON-RADIOACTIVE AREA De-erection of pipes of pipes and pipe fittings in field as per layout of drawing for details refer BOQ item No 11 in SOW and 01 bi..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; NON-RADIOACTIVE AREA Pre heat treatment of welding joint with induction coil heating method or other alternate method End condition All for details refe..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; NON- RADIOACTIVE AREA Post weld heat treatment of welding joint with induction coil heating method End condition All for details refer BOQ item No 13 ..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; NON-RADIOACTIVE AREA Transportation
Handling cleaning cutting fabrication welding and installation of pipe supports for main plant for details refer BO..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; NON- RADIOACTIVE AREA Transportation handling rectification modification fabrication and erection Including welding of MS steel structures for details ..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; NON-RADIOACTIVE AREA Transportation handling rectification modification fabrication Including welding of stainless steel structures requirements for mai..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; NON- RADIOACTIVE AREA De-erection dismantling of structural items like plate form
ladder railing etc including handling Cutting grinding and shifting to..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; NON-RADIOACTIVE AREA Carrying out Preventive Maintenance checks on fire door Job involves checking of fire door for smooth operation and rectification w..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Welding of CS to CS pipe and pipe fittings with SMAW process End Condition SW FW SORF for details refer BOQ item No 19 in SOW and..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Welding of CS to CS pipe and pipe fittings with SMAW process Process End Condition BW NW for details refer BOQ item No 20 in SOW ..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Welding of CS to CS pipe and pipe fittings by GTAW or SMAW process End Condition SW FW SORF for details refer BOQ item No 21 in SOW an..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Welding of Bid Details 2/50 CS to CS pipe and pipe fittings and completion of weld by GTAW or SMAW process End Condition BW NW for details refer BOQ it..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Welding of SS to SS and CS to SS pipe and pipe fittings by GTAW or SMAW process End condition SW FW SORF for details refer BOQ item N..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Welding of SS to SS and CS to SS pipe and pipe fittings by GTAW process End condition BW NW for details refer BOQ item No 24 in SOW and..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Welding of Alloy to CS or Alloy to Alloy pipe and pipe fittings by GTAW or SMAW process End Condition SW FW SORF for details refer..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; Welding of Alloy to CS or Alloy to Alloy pipe and pipe fittings by GTAW or SMAW process End condition BW NW for details refer BOQ item No 26 in SOW and ..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; Welding of CS to CS pipe or SS to SS and pipe fittings by GTAW or SMAW process End condition All for details refer BOQ item No 27 in SOW and 01 bid qua..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Plugging of SG tube including welder Qualification on QC block for welding in conel plug with incolloy-800 tube for details refer BOQ i..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Dye Penetrant examination of weld joints End condition All for details refer BOQ item No 29 in SOW and 01 bid quantity is equal to 6500..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Cleaning of pipes and pipe fittings with rotary wire brush and Erection of pipes and pipe fittings in field for details refer BOQ item ..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA De-erection of pipes of pipes and pipe fittings in field as per layout of drawing for details refer BOQ item No 31 in SOW and 01 bid ..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Pre heat treatment of welding joint with induction coil heating method or other alternate method End condition All for details refer BO..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Post weld heat treatment of welding joint with induction coil heating method End condition All for details refer BOQ item No 33 in SO..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Transportation Handling cleaning cutting fabrication welding and installation of pipe supports with u-clamps for details refer BOQ item..
Repair
Maintenance
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Transportation handling
rectification modification fabrication and erection for main plant for details refer BOQ item No 35 in SOW and..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Transportation handling
rectification modification Bid Details 3/50 fabrication Including welding of stainless steel structures requirements for main p..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Transportation handling
rectification modification fabrication and erection of lead sheet for main plant use for details refer BOQ ite..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA De- erection dismantling of structural items like plate form ladder railing etc for details refer BOQ item No 38 in SOW and 01 bid quant..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; FOR BOTH RADIOACTIVE AREA and NON-RADIOACTIVE AREA Installation of anchors bolts on support and structure railings ramps etc of size M10X75mm lg for det..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; FOR BOTH RADIOACTIVE AREA and NON-RADIOACTIVE AREA: Installation of anchors bolts on support and structure
railings ramps etc of size M12X100mm lg for ..
Repair
Maintenance
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; FOR BOTH RADIOACTIVE AREA and NON-RADIOACTIVE AREA Installation of anchors bolts on support and structure railings ramps etc of size M16X100mm lg for de..
7908843
GEM/2025/B/6292731
Two Packet Bid
Systems/Equipments (Version 2) - RR Site 3 and 4; NON RADIOACTIVE AREA Welding of Alloy to CS or Alloy to Alloy pipe and pipe fittings and completion of weld by GTAW or SMAW process End condition BW NW..
323303, Contracts & Material Management, NPCIL, Rawatbhata Rajasthan Site, Anushakti Via-Kota (Rajasthan) Phone No. 01475-242002, 242048 Which is about 60 Kms. away from Kota.
Total value wise evaluation
SERVICE
3 documents required · 3 mandatory
₹93 L
₹6.1 L
9 Jun 2025
9 Jun 2025
30 Jun 2025
Systems/Equipments (Version 2) - RR Site 3 and 4; NON RADIOACTIVE AREA Welding of Alloy to CS or Alloy to Alloy pipe and pipe fittings and completion of weld by GTAW or SMAW process End condition BW NW..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; NON RADIOACTIVE AREA Dye Penetrant examination of weld joints End condition All for details refer BOQ item No 9 in SOW and 01 bid quantity is equal to 7..
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; NON RADIOACTIVE AREA Cleaning of pipes and pipe fittings with rotary wire brush and Erection of pipes and pipe fittings in field as per layout of drawin..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; NON-RADIOACTIVE AREA De-erection of pipes of pipes and pipe fittings in field as per layout of drawing for details refer BOQ item No 11 in SOW and 01 bi..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; NON-RADIOACTIVE AREA Pre heat treatment of welding joint with induction coil heating method or other alternate method End condition All for details refe..
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; NON- RADIOACTIVE AREA Post weld heat treatment of welding joint with induction coil heating method End condition All for details refer BOQ item No 13 ..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; NON-RADIOACTIVE AREA Transportation
Handling cleaning cutting fabrication welding and installation of pipe supports for main plant for details refer BO..
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; NON- RADIOACTIVE AREA Transportation handling rectification modification fabrication and erection Including welding of MS steel structures for details ..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; NON-RADIOACTIVE AREA Transportation handling rectification modification fabrication Including welding of stainless steel structures requirements for mai..
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; NON- RADIOACTIVE AREA De-erection dismantling of structural items like plate form
ladder railing etc including handling Cutting grinding and shifting to..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; NON-RADIOACTIVE AREA Carrying out Preventive Maintenance checks on fire door Job involves checking of fire door for smooth operation and rectification w..
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Welding of CS to CS pipe and pipe fittings with SMAW process End Condition SW FW SORF for details refer BOQ item No 19 in SOW and..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Welding of CS to CS pipe and pipe fittings with SMAW process Process End Condition BW NW for details refer BOQ item No 20 in SOW ..
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Welding of CS to CS pipe and pipe fittings by GTAW or SMAW process End Condition SW FW SORF for details refer BOQ item No 21 in SOW an..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Welding of Bid Details 2/50 CS to CS pipe and pipe fittings and completion of weld by GTAW or SMAW process End Condition BW NW for details refer BOQ it..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Welding of SS to SS and CS to SS pipe and pipe fittings by GTAW or SMAW process End condition SW FW SORF for details refer BOQ item N..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Welding of SS to SS and CS to SS pipe and pipe fittings by GTAW process End condition BW NW for details refer BOQ item No 24 in SOW and..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Welding of Alloy to CS or Alloy to Alloy pipe and pipe fittings by GTAW or SMAW process End Condition SW FW SORF for details refer..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; Welding of Alloy to CS or Alloy to Alloy pipe and pipe fittings by GTAW or SMAW process End condition BW NW for details refer BOQ item No 26 in SOW and ..
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; Welding of CS to CS pipe or SS to SS and pipe fittings by GTAW or SMAW process End condition All for details refer BOQ item No 27 in SOW and 01 bid qua..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Plugging of SG tube including welder Qualification on QC block for welding in conel plug with incolloy-800 tube for details refer BOQ i..
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Dye Penetrant examination of weld joints End condition All for details refer BOQ item No 29 in SOW and 01 bid quantity is equal to 6500..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Cleaning of pipes and pipe fittings with rotary wire brush and Erection of pipes and pipe fittings in field for details refer BOQ item ..
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA De-erection of pipes of pipes and pipe fittings in field as per layout of drawing for details refer BOQ item No 31 in SOW and 01 bid ..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Pre heat treatment of welding joint with induction coil heating method or other alternate method End condition All for details refer BO..
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Post weld heat treatment of welding joint with induction coil heating method End condition All for details refer BOQ item No 33 in SO..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Transportation Handling cleaning cutting fabrication welding and installation of pipe supports with u-clamps for details refer BOQ item..
and Installation of Plant Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Transportation handling
rectification modification fabrication and erection for main plant for details refer BOQ item No 35 in SOW and..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Transportation handling
rectification modification Bid Details 3/50 fabrication Including welding of stainless steel structures requirements for main p..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA Transportation handling
rectification modification fabrication and erection of lead sheet for main plant use for details refer BOQ ite..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; RADIOACTIVE AREA De- erection dismantling of structural items like plate form ladder railing etc for details refer BOQ item No 38 in SOW and 01 bid quant..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; FOR BOTH RADIOACTIVE AREA and NON-RADIOACTIVE AREA Installation of anchors bolts on support and structure railings ramps etc of size M10X75mm lg for det..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; FOR BOTH RADIOACTIVE AREA and NON-RADIOACTIVE AREA: Installation of anchors bolts on support and structure
railings ramps etc of size M12X100mm lg for ..
and Installation of Plant/Systems/Equipments (Version 2) - RR Site 3 and 4; FOR BOTH RADIOACTIVE AREA and NON-RADIOACTIVE AREA Installation of anchors bolts on support and structure railings ramps etc of size M16X100mm lg for de..
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_7908843.pdf
GEM_BID
1748598983.pdf
OTHER
1748599010.pdf
OTHER
ATC_b39b5fef-97ca-4803-93f71748599596593_rrsuser514.pdf
OTHER
list-of-categories-where-trials-are-allowed_1712126171.pdf
OTHER
gtc.pdf
OTHER
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .