Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.2 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹11.8 L+₹52,037.60 (4.63%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | LOVELY CONSTRUCTION L1 | JEROME JIBY L2 |
|---|---|---|---|---|---|
| 1.00Appendix A - Side protection , ramp and motor thara | |||||
| 1.00 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 4.29 | cum | 667 ₹2,858.1 Lowest | 697.67 ₹2,989.52 |
| 1.00 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 108.34 | cum | 227 ₹24,594.32 Lowest | 237.27 ₹25,707.02 |
| 1.00 | 60.64.2:Coconut Pile - Supplying and stacking well matured 1/2 split and straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete. | 165 | metre | 120 ₹19,800 Lowest | 125.21 ₹20,659.65 |
| 1.00 | OD16590/2026-2027:Coconut Pile - Driving down coconut pile half split to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end. | 129.6 | metre | 166 ₹21,513.6 Lowest | 174 ₹22,550.4 |
| 1.00 | 60.64.3:Coconut pile -Supplying 1/4 split well matured and straight coconut wailing pieces and tied to the post with iron wires etc complete as per standard specification. | 39.2 | metre | 88 ₹3,449.6 Lowest | 92.29 ₹3,617.77 |
| 1.01 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 207.35 | cum | 3,514 ₹7,28,634.93 Lowest | 3,678 ₹7,62,640.66 |
| 1.01 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 8.38 | cum | 2,611 ₹21,885.4 Lowest | 2,732.27 ₹22,901.89 |
| 1.01 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 3 | cum | 1,510 ₹4,530 Lowest | 1,580 ₹4,740 |
| 1.01 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3
graded stone aggregate 20 mm nominal size derived from natural sources) | 13.46 | cum | 8,590 ₹1,15,604.22 Lowest | 8,988 ₹1,20,960.5 |
Tender Value
₹12.8 L
EMD Value
₹31,904
Closing Date
2 Nov 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer Irrigation Department(IRR) O/o Office of the Executive Engineer, Minor Irrigation Division Kottayam
Improving Irrigation facilities to Nalunnackal padasekharam at Vakathanam Panchayath in Puthupally LAC
2026_Irrig_882454_1
IRR/IA/TR/4098/2023_5_1_1/RC 1/2
Open Tender
Civil Works - Others
Item Rate
240 days
Vakathanam
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹31,904
Yes
3 Nov 2026
26 Oct 2026
3 Nov 2026
26 Oct 2026
2 Nov 2026
26 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix A - Side protection , ramp and motor thara | |||||
| 1.001 | 60.7.3:DISMANTLING DR - Dismanling , clearing away and carefully stacking materials useful for reuse for any thickness of walls in DR masonry including disposal of debris within a distance of 150m. | 4.29 | cum | - | - |
| 1.002 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 108.35 | cum | - | - |
| 1.003 | 60.64.2:Coconut Pile - Supplying and stacking well matured 1/2 split and straight coconut post for driving down throug various strata bellow bed level including cost coveyance labour charges etc complete. | 165 | metre | - | - |
| 1.004 | OD16590/2026-2027:Coconut Pile - Driving down coconut pile half split to lines and levels through soft to medium clay soil strata including all hire charges and labour and all other appliances necessary for pile for fixing , staging platform and all other appliances necessary for pile driving down after pointing the bottom end. | 129.6 | metre | - | - |
| 1.005 | 60.64.3:Coconut pile -Supplying 1/4 split well matured and straight coconut wailing pieces and tied to the post with iron wires etc complete as per standard specification. | 39.2 | metre | - | - |
| 1.006 | 60.7.1:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site | 207.35 | cum | - | - |
| 1.007 | 60.7.2:DR PACKING Under foundation - Dry stone packing under foundation with good quality blasted rubble including conveyance of material and labour charges etc. complete as per direction of departmental officers at site. | 8.38 | cum | - | - |
| 1.008 | 60.7.8:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course using departmental rubble including packing to compactness to lines and levels, labour charges etc. complete as per direction of Departmental officers at site | 3 | cum | - | - |
| 1.009 | 4.1.2:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3
graded stone aggregate 20 mm nominal size derived from natural sources) | 13.46 | cum | - | - |
stage.html
html • 0.02 MB
finance_1502301.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
Tendernotice_2.pdf
PDF • 8.26 MB
BOQ_1502301.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .