Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical C108 BAJAJ STEEL INDUSTRIES LIMITED MIDC INDUSTRIAL AREA HINGNA NAGPUR NAGPUR MAHARASHTRA 440028 | 440028 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical PLOT NO 44 54 5 59 3 SURVEY NO 169 DHOOLAPALLY VILL IDA JEEDIMETLA MEDCHAL MALKAJGIRI HYDEARBAD TELANGANA 500055 | MEDCHAL MALKAJGIRI | TELANGANA | 500055 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹18.4 Cr
EMD Value
₹28.4 L
Closing Date
22 May 2026, 2:00 pmClosed
Chief Engineer and DCE (CED, PD and EP)
Civil Engineering Division, Nuclear Fuel Complex, Hyderabad-500062
Civil, Structural steel and other allied works for construction of overhead trestles at NFC, Hyderabad.
2026_NFC_906037_1
C/1427/2026
Open Tender
Civil Works
Item Rate
NFC, Hyderabad
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹28.4 L
15 May 2026
22 Apr 2026
23 May 2026
22 Apr 2026
22 May 2026
29 Apr 2026
22 Apr 2026 - 28 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1EARTH WORK : | |||||
| 1.01 | Felling down carefully trees of all girth above 300mm (measured at a height of 1.0m above ground level) including necessary excavation, removal / destruction of roots, filling the excavated pockets thus formed with good earth, compacting the same, cutting the trunks and branches of trees into suitable pieces, transporting, stacking and disposing the same at the location with NFC for all leads as directed by Engineer – in – Charge. | 40 | Each | - | - |
| 1.02 | Earthwork excavation by manual means/mechanical means (Hydraulic excavator) over Areas, foundations, trenches, drains etc. upto required depths in all kinds of Soils except Soft and Hard Rock in both dry and wet conditions, dewatering if necessary, dressing the bottom and sides to required levels, profiles, slopes, etc., disposing the surplus earth/spoils within a lead of 50m , levelling the areas including clearing of all areas of all grass, rank vegetation, shrubs, bushes, trees upto 300mm girth measured 1.00 metre above ground level etc., complete all as directed and specified. | - | - | - | - |
| 1.021 | a) Upto 1.50 m depth from average ground level. | 3,000 | Cum | - | - |
| 1.022 | b) Above 1.50 m to 3.00 m depth from average ground level. | 1,000 | Cum | - | - |
| 1.03 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas, foundations, trenches, drains etc. in ordinary rock/GSB/WMM/WBM upto the depths specified below including dewatering if necessary, dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a distance of 50 m etc.,including clearing of all areas of all grass, rank vegetation, shrubs, bushes, trees upto 300mm girth measured 1.00 metre above ground level etc complete as directed by Engineer-incharge. | - | - | - | - |
| 1.031 | a) Upto 1.50 m depth from average ground level. | 600 | Cum | - | - |
| 1.032 | b) Above 1.50 m to 3.00 m depth from average ground level. | 200 | Cum | - | - |
| 1.04 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means in over areas, foundations, trenches, drains etc. in hard rock (blasting prohibited) by chiseling, wedging or any other approved method viz. using plasma cutting with diesel plasma gun under 3.5Kg/Sqcm pressure, including air compressor, followed by pneumatic chieselling or using non explosive expansive chemical agents , including drilling of holes as specified by manufacture, filling of expansive chemical, followed by pneumatic chiseling, diamond wire rope cutting etc. upto the depths specified below, including dewatering if necessary, dressing of sides and ramming of bottoms, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a distance of 50 m etc.,including clearing of all areas of all grass, rank vegetation, shrubs, bushes, trees upto 300mm girth measured 1.00 metre above ground level etc complete as directed by Engineer-incharge. | - | - | - | - |
| 1.041 | a) Upto 1.50 m depth from average ground level. | 600 | Cum | - | - |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.76 MB
GCCSCC.pdf
Tender Documents • 1.19 MB
Biddocument6Specs.rar
Tender Documents • 26.66 MB
BOQ_952350.xls
BOQ • 0.44 MB
BidderDeclaration.pdf
Tender Documents • 0.31 MB
TenderDrawing.pdf
Tender Documents • 1.28 MB
FinancialBidDocument.pdf
Tender Documents • 0.74 MB
PowerSupplyRequisitionForm.pdf
Tender Documents • 0.94 MB
Biddocument5TECHFORMSATOH.xls
Tender Documents • 0.08 MB
Biddocument7_AERBControlofWorks.pdf
Tender Documents • 0.27 MB
Tenderdatesextension.pdf
PDF • 0.79 MB
DBandCableSpecifications.pdf
PDF • 0.11 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .