| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.0 LAccepted-AOC | L1 | Accepted-AOC Agreement executed dt 07/10/2026 | |
| 2 | L2₹54.6 L+₹61,594.74 (1.14%)Rejected-Finance KERALA KL | ALAPPUZHA | KERALA | 688548 | L2 | Rejected-Finance High quoted rate | |
| 3 | Rejected-Technical | - | Rejected-Technical Higher rate and hence not admitted | |
| 4 | Rejected-Technical | - | Rejected-Technical Higher rate and hence not admitted | |
| 5 | Rejected-Technical | - | Rejected-Technical Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | AJIKUMAR.S L4 | KIRAN R L3 | SELVARAJ L2 | SHIBIN S S L1 | UTHAMAN.K L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00SCHOOL BUILDING | ||||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 592.9 | cum | 360.4 ₹2,13,681.16 | 330.54 ₹1,95,977.17 | 316.24 ₹1,87,498.7 | 312 ₹1,84,984.8 Lowest | 367.72 ₹2,18,021.19 |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 32.31 | cum | 7,947.81 ₹2,56,833.48 | 7,289.34 ₹2,35,555.02 | 6,973.89 ₹2,25,361.26 | 6,885 ₹2,22,488.78 Lowest | 8,109.18 ₹2,62,048.15 |
| 1.00 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 130.59 | cum | 9,982.66 ₹13,03,675.5 | 9,155.61 ₹11,95,667.73 | 8,759.4 ₹11,43,925.08 | 8,647 ₹11,29,246.32 Lowest | 10,185.35 ₹13,30,145.6 |
| 1.00 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 30.82 | cum | 12,796.2 ₹3,94,442.87 | 11,736.04 ₹3,61,763.43 | 11,228.17 ₹3,46,108.34 | 11,085 ₹3,41,695.13 Lowest | 13,056.01 ₹4,02,451.51 |
| 1.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 24.9 | cum | 13,467.42 ₹3,35,392.63 | 12,351.65 ₹3,07,605.49 | 11,817.14 ₹2,94,294.05 | 11,666 ₹2,90,530.06 Lowest | 13,740.86 ₹3,42,202.38 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 531.75 | sqm | 386.88 ₹2,05,723.44 | 354.83 ₹1,88,680.85 | 339.48 ₹1,80,518.49 | 335 ₹1,78,136.25 Lowest | 394.74 ₹2,09,903 |
| 1.01 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 331.2 | sqm | 1,010.44 ₹3,34,657.73 | 926.72 ₹3,06,929.66 | 886.63 ₹2,93,651.86 | 875 ₹2,89,800 Lowest | 1,030.96 ₹3,41,453.95 |
| 1.01 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 146.38 | sqm | 764.32 ₹1,11,881.16 | 700.99 ₹1,02,610.92 | 670.66 ₹98,171.21 | 662 ₹96,903.56 Lowest | 779.84 ₹1,14,152.98 |
| 1.01 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | 21.6 | sqm | 826.36 ₹17,849.38 | 757.89 ₹16,370.42 | 725.1 ₹15,662.16 | 624 ₹13,478.4 Lowest | 843.14 ₹18,211.82 |
Tender Value
₹63.5 L
EMD Value
₹50,000
Closing Date
23 Mar 2026, 4:00 pmClosed
SUPERINTENDING ENGINEER
Superintending Engineer Thiruvananthapuram Corporation 695033
TMC/OF/CELSGD/93658/2025- MLA-SDF-Construction of a building for GLPS ( Phase 1 ) Vattiyoorkkavu-MLA SDF (New Tender)
2026_LSGD_846821_1
DB/62983/2025-26 (157)
Open Tender
Civil Works - Buildings
Item Rate
365 days
Vattiyoorkkavu ward
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
Yes
₹50,000
Yes
9 Oct 2026
12 Mar 2026
24 Mar 2026
12 Mar 2026
23 Mar 2026
12 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1SCHOOL BUILDING | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 592.9 | cum | - | - |
| 1.002 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 32.32 | cum | - | - |
| 1.003 | 5.1.3:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 130.59 | cum | - | - |
| 1.004 | 5.2.2:Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. up tot floor five level excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size derived from natural sources) | 30.83 | cum | - | - |
| 1.005 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 24.9 | cum | - | - |
| 1.006 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 531.75 | sqm | - | - |
| 1.007 | 5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts | 331.2 | sqm | - | - |
| 1.008 | 5.9.5:Centering and shuttering including strutting, etc. and removal of form for:Lintels, beams, plinth beams, girders bressumers and cantilevers | 146.38 | sqm | - | - |
| 1.009 | 5.9.7:Centering and shuttering including strutting, etc. and removal of form for:Stairs, (excluding landings ) except spiral - staircases) | 21.6 | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.28 MB
PA93658.pdf
Tender Documents • 0.26 MB
FT93658.pdf
Tender Documents • 0.26 MB
Aff93658.pdf
Tender Documents • 0.24 MB
IP.pdf
Tender Documents • 0.24 MB
Epay.pdf
Tender Documents • 0.24 MB
viewsbd93658.pdf
Tender Documents • 3.06 MB
BOQ_1430825.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .