Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹12.4 LAdmitted-Fee/PreQual/Technical/Finance | -62.10% | ₹12.4 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L3₹13.9 L+₹1.5 L (11.9%)Admitted-Fee/PreQual/Technical/Finance | -57.60% | ₹13.9 L+₹1.5 L (11.9%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L4₹14.2 L+₹1.7 L (14.0%)Admitted-Fee/PreQual/Technical/Finance | -56.80% | ₹14.2 L+₹1.7 L (14.0%) | L4 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L5₹14.9 L+₹2.5 L (19.9%)Admitted-Fee/PreQual/Technical/Finance | -54.54% | ₹14.9 L+₹2.5 L (19.9%) | L5 | Admitted-Fee/PreQual/Technical/Finance |
| 5 | L6₹15.1 L+₹2.7 L (21.6%)Admitted-Fee/PreQual/Technical/Finance | -53.90% | ₹15.1 L+₹2.7 L (21.6%) | L6 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹32.8 L
EMD Value
₹65,620
Closing Date
21 May 2026, 4:00 pmClosed
EE PW(RnB) Div Sankoo
EE PW(RnB) Div Sankoo
Construction of Interior Footh Path in Hostel Block at Kargil Campus UOL Khumbathang.
2026_PWD_18927_2
E-Tender 02 PW(RnB) Div Sankoo 2026-27
Open Tender
Civil Works - Others
Percentage
90 days
Khumbuthang
Please refer Tender documents.
3 documents required · 3 mandatory
₹328
EE PW(RnB) Div Sankoo
₹65,620
29 May 2026
12 May 2026
22 May 2026
12 May 2026
21 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal
of material within 50 metres lead as per direction of Engineer - in - charge.
15.2.1 Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix) | 4.8 | cum | 1,627.69 | ₹7,812.91 |
| 2Earth work in excavation by manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | |||||
| 2.01 | All kinds of Soil @80% | 136.64 | Cum | 433.77 | ₹59,270.33 |
| 2.02 | Soft Rock @20% | 34.16 | Cum | 959.74 | ₹32,784.72 |
| 3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 153.72 | cum | 214.44 | ₹32,963.72 |
| 4 | Dry stone pitching (any thickness) including cost of stones and . On Horizontal | 138.08 | Cum | 1,490.75 | ₹2,05,842.76 |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level 1:3:6 (1 Cement : 3 coarse sand (zone-III) derived from natural sources : 6
gradedstone aggregate 40 mm nominal size derived from natural sources | 238.36 | Cum | 6,243.85 | ₹14,88,284.09 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns, etc. for mass concrete | 1,357.7 | sqm | 297.86 | ₹4,04,404.52 |
| 7 | Providing and laying 80mm thick faciory made cement in required colour and pattern over and including 50mm thick compacted bed of coarse sand, filling the concrete interlocking paver block of M -30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid joints with line sand etc. all complete as per the direction of Engineer-in-charge | 473 | Sqm | 1,525.33 | ₹7,21,481.09 |
| 8 | Providing and laying of M.S.Pipe 150mm dia 5.4mm thick with a weight of 21.27kg/Rm and a length of 6m long for cross drainage work incld. Constt. Of catch pits at the inlet and out let in M-15 grade concrete and providing and laying a bed of sand layer and providing earth cushion to the required grade and cross section.(As direct by Engineer -in-charge as per drawing and relevant /RC specifications code. | 4 | No | 18,139 | ₹72,556 |
stage.html
html • 0.10 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.15 MB
BOQ_45224.xls
BOQ • 0.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .