| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 LAccepted-Finance | ₹3.3 L | L1 | Accepted-Finance L1 |
| 2 | L2₹3.5 L+₹18,499.80 (5.66%)Rejected-Finance | ₹3.5 L+₹18,499.80 (5.66%) | L2 | Rejected-Finance L2 |
| 3 | L3₹3.6 L+₹37,465.52 (11.5%)Rejected-Finance | ₹3.6 L+₹37,465.52 (11.5%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical Self declerartion accept |
| Sl No | Description | Qty | Unit | VED RAJ NEGI L1 | Vikas Govt Contractor L3 | VINOD KUMAR GOVT CONTRACTOR L2 |
|---|---|---|---|---|---|---|
| 1.00 | Cutting in all kinds of soil such as kankar, moorum, shingle boulders decomposed of soft rock or any such mixed in other variety of soil or rocks including filling in embankments where necessary including ramming and watering etc. stacking of serviceable materials at the place specified by the Engineer-in-Charge including all leads and lifts wherever or for what purpose required. | 8.96 | Cum | 400 ₹3,584 Lowest | 425 ₹3,808 | 420 ₹3,763.2 |
| 2.00 | Excavation in foundation trenches etc. in all kinds of earth work such as spade work, pick work, jumper work saturated /un saturated soil blasting work and chiseling/wedging out of rocks where blasting work prohibited up to all depth and lifts including pumping and bailing out water where ever required stacking the excavated earth not more than 3mtrs.clear from the edge of excavation and then returning the stacked soil in 15cm.layers when required into the plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated material within all leads and lifts, useful material available from excavation to be properly stacked and handed over free of cost to the department as per direction of the Engineer-in Charge. | 5.98 | Cum | 400 ₹2,392 Lowest | 420 ₹2,511.6 | 415 ₹2,481.7 |
| 3.00 | Providing and laying cement concrete 1:4:8(1cement: 4sand: 8 graded stone agg.40mm nominal size) and curing complete excluding cost of centering and shuttering including all leads and lifts. a) Foundation and plinth. | 1.2 | Cum | 10,500 ₹12,600 | 11,000 ₹13,200 | 10,000 ₹12,000 Lowest |
| 4.00 | Providing and laying cement concrete 1:5:10(1cement: 5sand: 10 graded stone agg.40mm nominal size) and curing complete excluding cost of centering and shuttering including all leads and lifts. a) Foundation and plinth. | 7.5 | Cum | 10,500 ₹78,750 | 11,000 ₹82,500 | 10,000 ₹75,000 Lowest |
| 5.00Providing and laying cement concrete 1:1.5:3 (1cement:1.5 sand : 3graded stone aggregate 20mm nominal size)and curing complete excluding cost of form work and re-inforcement for reinforced concrete work in: | ||||||
| 5.01 | Foundations, footings, basis of columns & the like and mass concrete. | 1.79 | Cum | 15,000 ₹26,850 | 15,000 ₹26,850 | 14,500 ₹25,955 Lowest |
| 5.20 | Wall (any thickness but not less than 0.1 m thickness) attached pillasters, buttresses, plinth and string courses, etc. from top of foundation level upto floor two level. | 2.67 | Cum | 16,500 ₹44,055 | 16,000 ₹42,720 | 15,500 ₹41,385 Lowest |
| 6.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a rough finish including centering shuttering strutting and propping etc. height of propping and centering below supporting floor to ceiling not exceeding 4mtrs.and removal of the same for in situ reinforced concrete and plain concrete work including all leads and lifts: | ||||||
| 6.01 | Vertical surfaces such as walls (any thickness)portions and the like including attached pilaster buttresses plinth and string course and the like | 35.64 | Sqm. | 600 ₹21,384 Lowest | 800 ₹28,512 | 700 ₹24,948 |
| 7.00 | Providing Placing &Laying mild /tor steel reinforcement for RCC. work including bending, binding and placing in position complete up to floor two level including all leads and lifts.: a) Tor steel | 402 | Kg. | 100 ₹40,200 Lowest | 155 ₹62,310 | 150 ₹60,300 |
Tender Value
₹2.8 L
EMD Value
₹5,648
Closing Date
11 Jul 2025, 5:00 pmClosed
EE JSD Anni
EE JSD Anni
SH Cons. of Storage Tank 10000 ltrs cap. and Barbed wire fencing.
2025_HPIPH_109232_1
3039-84
Open Tender
Civil Works
Item Rate
120 days
Nirmand
Please refer Tender documents.
9 documents required · 9 mandatory
₹500
₹5,648
21 Jul 2026
2 Jul 2025
14 Jul 2025
2 Jul 2025
11 Jul 2025
2 Jul 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .