| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹42.6 LAccepted-AOC NO 68 ANJANEYA TEMPLE CROSS OPP M S RAMAIAH HOSPITAL NEW BEL ROAD BANGALORE 560 094 | BENGALURU URBAN | KARNATAKA | 560094 | L1 | Accepted-AOC Awarded contract, being lowest | |
| 2 | L2₹45.0 L+₹2.0 L (4.69%)Rejected-AOC PLOT NO 1134 1196 MORIVALI VILLAGE TAL AMBARNATH DIST THANE AMBERNATH 421505 | AMBERNATH | THANE | MAHARASHTRA | 421505 | L2 | Rejected-AOC Rejected, not being lowest | |
| 3 | L3₹47.9 L+₹5.0 L (11.5%)Rejected-AOC 131 SANGAM NAGAR OPP NATIONAL SCHOOL SANGHVI PUNE 411027 | PUNE | MAHARASHTRA | 411027 | L3 | Rejected-AOC Rejected, not being lowest |
| Sl No | Description | Qty | Unit | devan enterprises L1 | Leo Enterprises L3 | shakti engineering and electrical works L2 |
|---|---|---|---|---|---|---|
| 1.00NOTES FOR ALL ITEMS OF BOQ:- 1.Contractor should visit the installations before quoting the tender to know the working condition of the station. 2. Maintenance / Servicing work must be got it done through OEM or its authorized service provider only. 3. Safety certificate for steam pipe line should be provided by the contractor on monthly servicing and he will be responsible for any loss. 4. Contractor has to provide all type of tools required for repair/replacement of the laundry items. It shall be deemed to be included in the quoted rate. 5. All requisite safety measures to be adopted at site during servicing & repair of equipment. 6. The contractor has to attend emergency breakdown/repairs within 2 days, otherwise a penalty of Rs.1000/day/repair will be deducted incase of Engr-in-Charge is not satisfied with delay reasons. 7. Attending breakdown call & nececessary servicings shall be deemed to be included under the unit rate quoted for below Items. 8. In case if the laundry units under comprehensive maintenance under the subject contract is kept unrepaired for more than 48 hours, a penalty @ Rs 500/- per hour (max hours a day) shall be levied per plant / unit incase of Engr-in-Charge is not satisfied with delay reasons. 9. Contractor has to keep minimum essential spares / consumable in reserve during entire period of work. 10. The spare parts included vide Srl Item Nos 14 to 88 (all parts / works) and rewinding of motors vide Srl Item Nos 89 to 93 of BoQ shall be measured and paid separately and the rate quoted for comprehensive maintenance do not include the same. 11. Contractor is required to asses the actual scope of works for all the plants / units as required and requirement of spare / components other than that included in BoQ and quote the rate for comprehensive maintenance accordingly. | ||||||
| 2.00 | COMPREHENSIVE MAINTENANCE TO HOSPITAL LAUNDRY EQUIPMENTS
Material and labour for comprehensive maintenance including routine, preventive maintenance, servicing of following equipments for smooth functioning including cleaning, oiling, greasing checking of complete system for trouble free functionability, replacing worn out nuts, bolts,V-belts,gaskets etc as required all as specified and directed by Engineer -in -charge.
(a) Washer Extractor 30 kg (Model: RVW30) -2Nos
(b) Tumbler dryer25 kg (Model: RTD 25) - 2 Nos
(c) Calendering Machine RFWI 1600x400-1 No.
(d) Compressor STD - 01 Nos.
(e) Calendering Machine RFWI 2000x400- 1 No.
(f) Complete Steam system for laundry.
(g) Vaccum Ironing table RV 130X 80- 4 Nos.
(h) Electrical steam generator(Model: MR 18) - 5 Nos.
(i) Utility Press STD - 2 Nos.
(j) Stain Removing machine (Model:CL 7) - 1No. | 11 | Each Job | 35,000 ₹3,85,000 Lowest | 41,000 ₹4,51,000 | 38,000 ₹4,18,000 |
| 3.00 | COMPREHENSIVE MAINTENANCE TO STATION LAUNDRY EQUIPMENT
Material and labour for comprehensive maintenance including routine, preventive maintenance, servicing of following equipments for smooth functioning including cleaning, oiling, greasing checking of complete system for trouble free functionability, replacing worn out nuts, bolts,V-belts,gaskets etc as required all as specified and directed by Engineer -in -charge.
(a) Washer Extractor 45 kg (model : RVW45)- 4Nos
(b) Tumble dryer 50 kg, (model :RTD 50)- 04 Nos
(c) Calendering Machine RFWI 2000x400- 1 No.
(d) Vaccum Ironing table RV 130X 80- 6 Nos.
(e) Electrical boiler MR 18 - 2 Nos.
(h) Complete Steam pipe line | 11 | Each Job | 45,000 ₹4,95,000 Lowest | 50,500 ₹5,55,500 | 49,000 ₹5,39,000 |
| 4.00 | COMPREHENSIVE MAINTENANCE TO NEW INDUSTRIAL LAUNDRY EQUIPMENT
Material and labour for comprehensive maintenance which include routine, preventive and breakdown maintenance including repairs and servicing of following equipments for smooth functioning including cleaning, oiling, greasing checking of complete system for trouble free fuctionability, replacing worn out nuts,bolts,V-belts etc as required all as specified and directed by Engineer -in -charge.
(a) Tumble drier 120Kg (Model:RTD 120)-2Nos
(b) Washer Extractor 120Kg (Model:RVWE 120) - 2Nos
(c) Legger Laundry Press Steam inlet type with vaccum motor 0.75 HP. (Make: Ramson) -2 Nos.
(d) Vaccum Ironing table, with 0.75 HP vacuum motor, 2128 iron box alongwith connections (Make: Ramson)- 8 Nos.
(e) Air Compressor 5HP (Make : Ramsons )- 1 Nos (f) Water softner plant - 02 Nos (g) Complete steam pipe line | 11 | Each Job | 35,000 ₹3,85,000 Lowest | 41,000 ₹4,51,000 | 39,000 ₹4,29,000 |
| 5.00 | COMPREHENSIVE MAINTENANCE TO OLD INDUSTRIAL LAUNDRY EQUIPMENT
Material and labour for comprehensive maintenance which include routine, preventive and breakdown maintenance including repairs and servicing of following equipments for smooth functioning including cleaning, oiling, greasing checking of complete system for trouble free fuctionability, replacing worn out nuts,bolts,V-belts etc as required all as specified and directed by Engineer -in -charge.
(a) Industrial Tumble drier 50 Kg (model : RTD 50)- 2Nos, 25 Kg - 01 No
(b) Washer Extractor 60Kg (model : RVW 60) - 4 Nos
(c) Legger Laundry Press Steam inlet type with vaccum motor 0.75 HP. (Make: Ramson) -2 Nos.
(d) Vaccum Ironing table, with 0.75 HP vacuum motor, 2128 iron box alongwith connections (Make: Ramson) - 12 Nos.
(e) Air Compressor - 1 Nos.
(f) Water Softner plant - 01 No.
(g)Hot bed Press - 02 Nos.
(h) Flat bed press - 03 Nos.
(j) Calendering Machine RFWI 2000x400- 1 No.
(k) Dry Cleaning Machine (Model : 208 SP) - 01 No.
(l) Complete steam pipe line system. (m) Stain removal machine (make : Ramson) | 11 | Each Job | 62,000 ₹6,82,000 | 50,500 ₹5,55,500 | 49,000 ₹5,39,000 Lowest |
| 6.00 | Comprehensive maintenance and servicing of industrial tumbler drier & associated system of 25 Kg capacity (model :Kllen rite) installed at squadrons A,B,C,D,E (Total Qty -05 Nos) including control panel all connected items and carrying out routine check of the machine oiling, greasing and replacement of nuts, bolts, gaskets, V belts etc as per requirement for smooth functioning of plant complete all as specified and directed by Engr-in-charge. | 11 | Each Job | 10,000 ₹1,10,000 Lowest | 14,500 ₹1,59,500 | 12,000 ₹1,32,000 |
| 7.00 | Comprehensive maintenance and servicing of boiler installed at old laundry for cadets of IBR 2x400 kg/hour capacity ( Make : Thermax, RXA 04) of new industrial laundry including control panel, all connected items and carrying out routine check of the machine oiling, greasing,nuts,bolts, gaskets,etc for smooth functioning complete all as specified and directed by Engr-in-charge. | 11 | Each Job | 23,000 ₹2,53,000 Lowest | 26,000 ₹2,86,000 | 23,500 ₹2,58,500 |
| 8.00 | Comprehensive maintenance and servicing of boiler installed at new laundry of 2x600 kg/hour capacity ( Make : Thermax, RXA 06) of old industrial laundry including control panel, all connected items and carrying out routine check of the machine oiling, greasing,nuts,bolts, gaskets,etc for smooth functioning complete all as specified and directed by Engr-in-charge. | 11 | Each Job | 25,000 ₹2,75,000 Lowest | 28,000 ₹3,08,000 | 25,500 ₹2,80,500 |
| 9.00Notes for Ser item No 2 to 8 :- 1. Consumables (compressor oil, PERC solvent for dry cleaning machine), V belts, gaskets, cleaning, greasing, nuts and bolts shall be deemed to be included under the unit rate quoted. All other spares are measured and paid seperately. 2. The contractor has to submit monthly service report on OEM/authorized dealer letter head/service book. 3. The quoted rate is deemed to be inclusive of labour cost of replacement of spares including taking down of unserviceable. Labour cost for item No. 11.01 to 11.67 are included in quoted rate 4. All technical repairs should be carried out through OEM rep only. 5. The quoted rate is inclusive of attending emergency breakdowns during contract period in addition to preventive maintenace. 6. The contractor has to perform PMS on monthly basis. | ||||||
| 10.00 | Material and labour for internal safety inspection of 400/600 kg/hr boiler (Non-IBR, Thermax RXA) of pre flash up, water pressure test up to suggested by inspection team, checking of all safety components/system, internal visual inspection of membrane coil, refractory, tubes, inner jacket cracks and all other safety trips including opening/removal/lifting/re-erection of membrane coil, internal parts complete all as specified and directed by Engr-In-Charge. | 2 | Each Job | 55,000 ₹1,10,000 Lowest | 58,000 ₹1,16,000 | 56,000 ₹1,12,000 |
Tender Value
₹44.0 L
EMD Value
₹87,932
Closing Date
4 Nov 2025, 6:00 pmClosed
GE(MAINT)EZHIMALA
GARRISON ENGINEER (MAINT) MILITARY ENGINEER SERVICES INDIAN NAVAL ACADEMY POST KANNUR DIST KERALA 670 310
AS PER BOQ AND TENDER DOCUMENTS
2025_MES_734931_1
GE MAINT EZHIMALA 8789
Open Tender
Civil Works
Item Rate
270 days
Ezhimala
AS PER TENDER DOCUMENTS
8 documents required · 8 mandatory
₹500
GE MAINT EZHIMALA
₹87,932
Yes
4 Dec 2025
13 Oct 2025
10 Nov 2025
13 Oct 2025
4 Nov 2025
28 Oct 2025
13 Oct 2025 - 20 Oct 2025
Amount
NOTES FOR ALL ITEMS OF BOQ:- 1.Contractor should visit the installations before quoting the tender to know the working condition of the station. 2. Maintenance / Servicing work must be got it done through OEM or its authorized service provider only. 3. Safety certificate for steam pipe line should be provided by the contractor on monthly servicing and he will be responsible for any loss. 4. Contractor has to provide all type of tools required for repair/replacement of the laundry items. It shall be deemed to be included in the quoted rate. 5. All requisite safety measures to be adopted at site during servicing & repair of equipment. 6. The contractor has to attend emergency breakdown/repairs within 2 days, otherwise a penalty of Rs.1000/day/repair will be deducted incase of Engr-in-Charge is not satisfied with delay reasons. 7. Attending breakdown call & nececessary servicings shall be deemed to be included under the unit rate quoted for below Items. 8. In case if the laundry units under comprehensive maintenance under the subject contract is kept unrepaired for more than 48 hours, a penalty @ Rs 500/- per hour (max hours a day) shall be levied per plant / unit incase of Engr-in-Charge is not satisfied with delay reasons. 9. Contractor has to keep minimum essential spares / consumable in reserve during entire period of work. 10. The spare parts included vide Srl Item Nos 14 to 88 (all parts / works) and rewinding of motors vide Srl Item Nos 89 to 93 of BoQ shall be measured and paid separately and the rate quoted for comprehensive maintenance do not include the same. 11. Contractor is required to asses the actual scope of works for all the plants / units as required and requirement of spare / components other than that included in BoQ and quote the rate for comprehensive maintenance accordingly.
COMPREHENSIVE MAINTENANCE TO HOSPITAL LAUNDRY EQUIPMENTS Material and labour for comprehensive maintenance including routine, preventive maintenance, servicing of following equipments for smooth functioning including cleaning, oiling, greasing checking of complete system for trouble free functionability, replacing worn out nuts, bolts,V-belts,gaskets etc as required all as specified and directed by Engineer -in -charge. (a) Washer Extractor 30 kg (Model: RVW30) -2Nos (b) Tumbler dryer25 kg (Model: RTD 25) - 2 Nos (c) Calendering Machine RFWI 1600x400-1 No. (d) Compressor STD - 01 Nos. (e) Calendering Machine RFWI 2000x400- 1 No. (f) Complete Steam system for laundry. (g) Vaccum Ironing table RV 130X 80- 4 Nos. (h) Electrical steam generator(Model: MR 18) - 5 Nos. (i) Utility Press STD - 2 Nos. (j) Stain Removing machine (Model:CL 7) - 1No.
COMPREHENSIVE MAINTENANCE TO STATION LAUNDRY EQUIPMENT Material and labour for comprehensive maintenance including routine, preventive maintenance, servicing of following equipments for smooth functioning including cleaning, oiling, greasing checking of complete system for trouble free functionability, replacing worn out nuts, bolts,V-belts,gaskets etc as required all as specified and directed by Engineer -in -charge. (a) Washer Extractor 45 kg (model : RVW45)- 4Nos (b) Tumble dryer 50 kg, (model :RTD 50)- 04 Nos (c) Calendering Machine RFWI 2000x400- 1 No. (d) Vaccum Ironing table RV 130X 80- 6 Nos. (e) Electrical boiler MR 18 - 2 Nos. (h) Complete Steam pipe line
COMPREHENSIVE MAINTENANCE TO NEW INDUSTRIAL LAUNDRY EQUIPMENT Material and labour for comprehensive maintenance which include routine, preventive and breakdown maintenance including repairs and servicing of following equipments for smooth functioning including cleaning, oiling, greasing checking of complete system for trouble free fuctionability, replacing worn out nuts,bolts,V-belts etc as required all as specified and directed by Engineer -in -charge. (a) Tumble drier 120Kg (Model:RTD 120)-2Nos (b) Washer Extractor 120Kg (Model:RVWE 120) - 2Nos (c) Legger Laundry Press Steam inlet type with vaccum motor 0.75 HP. (Make: Ramson) -2 Nos. (d) Vaccum Ironing table, with 0.75 HP vacuum motor, 2128 iron box alongwith connections (Make: Ramson)- 8 Nos. (e) Air Compressor 5HP (Make : Ramsons )- 1 Nos (f) Water softner plant - 02 Nos (g) Complete steam pipe line
COMPREHENSIVE MAINTENANCE TO OLD INDUSTRIAL LAUNDRY EQUIPMENT Material and labour for comprehensive maintenance which include routine, preventive and breakdown maintenance including repairs and servicing of following equipments for smooth functioning including cleaning, oiling, greasing checking of complete system for trouble free fuctionability, replacing worn out nuts,bolts,V-belts etc as required all as specified and directed by Engineer -in -charge. (a) Industrial Tumble drier 50 Kg (model : RTD 50)- 2Nos, 25 Kg - 01 No (b) Washer Extractor 60Kg (model : RVW 60) - 4 Nos (c) Legger Laundry Press Steam inlet type with vaccum motor 0.75 HP. (Make: Ramson) -2 Nos. (d) Vaccum Ironing table, with 0.75 HP vacuum motor, 2128 iron box alongwith connections (Make: Ramson) - 12 Nos. (e) Air Compressor - 1 Nos. (f) Water Softner plant - 01 No. (g)Hot bed Press - 02 Nos. (h) Flat bed press - 03 Nos. (j) Calendering Machine RFWI 2000x400- 1 No. (k) Dry Cleaning Machine (Model : 208 SP) - 01 No. (l) Complete steam pipe line system. (m) Stain removal machine (make : Ramson)
Comprehensive maintenance and servicing of industrial tumbler drier & associated system of 25 Kg capacity (model :Kllen rite) installed at squadrons A,B,C,D,E (Total Qty -05 Nos) including control panel all connected items and carrying out routine check of the machine oiling, greasing and replacement of nuts, bolts, gaskets, V belts etc as per requirement for smooth functioning of plant complete all as specified and directed by Engr-in-charge.
Comprehensive maintenance and servicing of boiler installed at old laundry for cadets of IBR 2x400 kg/hour capacity ( Make : Thermax, RXA 04) of new industrial laundry including control panel, all connected items and carrying out routine check of the machine oiling, greasing,nuts,bolts, gaskets,etc for smooth functioning complete all as specified and directed by Engr-in-charge.
Comprehensive maintenance and servicing of boiler installed at new laundry of 2x600 kg/hour capacity ( Make : Thermax, RXA 06) of old industrial laundry including control panel, all connected items and carrying out routine check of the machine oiling, greasing,nuts,bolts, gaskets,etc for smooth functioning complete all as specified and directed by Engr-in-charge.
Notes for Ser item No 2 to 8 :- 1. Consumables (compressor oil, PERC solvent for dry cleaning machine), V belts, gaskets, cleaning, greasing, nuts and bolts shall be deemed to be included under the unit rate quoted. All other spares are measured and paid seperately. 2. The contractor has to submit monthly service report on OEM/authorized dealer letter head/service book. 3. The quoted rate is deemed to be inclusive of labour cost of replacement of spares including taking down of unserviceable. Labour cost for item No. 11.01 to 11.67 are included in quoted rate 4. All technical repairs should be carried out through OEM rep only. 5. The quoted rate is inclusive of attending emergency breakdowns during contract period in addition to preventive maintenace. 6. The contractor has to perform PMS on monthly basis.
Material and labour for internal safety inspection of 400/600 kg/hr boiler (Non-IBR, Thermax RXA) of pre flash up, water pressure test up to suggested by inspection team, checking of all safety components/system, internal visual inspection of membrane coil, refractory, tubes, inner jacket cracks and all other safety trips including opening/removal/lifting/re-erection of membrane coil, internal parts complete all as specified and directed by Engr-In-Charge.
Material and labour for chemical analysis of boiler inlet water for alkalinity, salinity, pH, TDS, phospate parameters including collecting water sample at cadet laundry point specified, transporting to NABL accredided lab and submiiting test report within 10 days after collection of water sample.
Material and labour for painting of heat resistance coating (400 degree) on boiler exhaust system complete all as specified Note : contractor has to arrange all safety equipments for workman during painting.
The following spare parts required for maintenace of equipments
Oil fired boilers (400/600 kg/hr) spares
Moist seperator, cyclonic type, 25 NB suitable to trap moisture content in 400/600 kg themax boiler steam line
Thermodynamic (TD) steam trap with NPT connections, 15 NB
Float trap with NPT connections, 15 NB
membrane coil suitable for existing oil fired boiler of capacity 600 kg/hr (Model : RXA-06). including packing with refractory cement
Burner Nozzle,4.5 GPH. 45deg suitable for existing oil fired boiler of capacity 600 kg/hr (Model : RXA-06).
Oil level indicator suitable for existing oil fored boiler of capacity 600 kg/hr (Model : RXA-06).
Pressure gauge (0-14 kg/cm2)
Pressure switch (0-14 kg/cm2)
laundry equipment spares
High performance VFD inverter (AC drive), 15 HP, 31 A, 3 phase, 380-480V including programming suitable for controlling motor of washer extractor Make : Fuji Electric (Model: FRN0022E2S-4GBX) or equivalent in delta/Schneider
DBR 300 ohm/7.5 kW suitable for VFD drive Make : As per OEM
DBR 80 ohm/3 kW suitable for VFD drive Make : As per OEM
Control transformer 220/-12-0-12V, 5A
inverter cooling fan 4 inch, 220V,18W,2500 RPM
Shock absorbers suitable for washer extractor 45/60/120 kg drum
Washer extractor spring (Big)
Washer extractor spring (small)
Fin heater 9 kW, 220V
I/O card suitable for washer extractor 45/60/120 kg
Drain pump 0.25 HP, 220V
Bearing UCFL 205 with sleeves Make : SKF/TATA/NBC
Bearing UCFL 212 with sleeves Make : SKF/TATA/NBC
Tapered roller bearing 32213 Make : SKF/TATA/NBC
Tapered roller bearing 32218 Make : SKF/TATA/NBC
UKP317 Bearing with sleeves Make : SKF/TATA/NBC
Data cable 40 pin, 5 mtr
PLC probe
PLC controller ST 2002 for 45/60/120 kg washer extractor (RVWE type) including programming as recommended by OEM
PLC STK 200 suitable for 25/50/120 kg tumbler drier (RTD type) including programming as recommended by OEM
Steam radiator suitable for 60/120 kg tumble drier
60 kg washer extractor mchine drum Make : As per OEM
HMI 7" TFT LCD, 800x480 pixels, 154.08x85.92mm display range, 800 MHZ CPU, 256 MB RAM, resistive touch, 24V DC, 8.5W with programming as recommended by OEM suitable for 12 Kg dry cleaning machine of RAMA india make (Model :208 SP) Make : As per OEM
Oil filter to filter PERC oil in drycleaning machine
Heating element 900W suitable for iron box 2128
Iron box 2128 regulator
Iron box 2128
Thermostat suitable for 2128 iron box
steam hose 1/4 inch, 3 mtr length
Silicon pad
Gear box drive to opeate existing ramson make calendring machine suitable to compatible with 0.75 HP motor
PID temperature Controller with 3 digit LED display, 270 V AC Make : SELEC (model :TC-513AX)
PT-100 temperature sensor 5 mtr
PU 4 hose with connectors/clamping
PU 6 hose with connectors/clamping
PU 8 hose with connectors/clamping
1/2" pneumatic valve
1" pneumatic valve
1" solenoid valve with coil, 230V make : saturn magnetic/Techno/Danfoss
1/4" solenoid valve with coil, 230V make : saturn magnetic/Techno/Danfoss
1/2" solenoid valve with coil, 230V make : saturn magnetic/Techno/Danfoss
3" Electrical Drain Valve, 24V
4" Electrical Drain Valve, 24V
water softner plant multi port valve
General spares
20mm PB SS ball valve suitable to fix existing steam lines make : Zoloto/Sant/Kartar
25mm PB SS ball valve suitable to fix existing steam lines make : Zoloto/Sant/Kartar
50mm PB SS ball valve suitable to fix existing steam lines make : Zoloto/Sant/Kartar
NO/NC Contact - 240V A.C,3 A Make:- Schneider/ Teknic/ Esbee
MCB, 4P, 40/63A, 16 kA Make : ABB/Havells/Legrand or equivalent
Forward pause reverse timer (0-25 Sec), 240 V AC
Relay with base - 2 C/O, 240V AC , 8 Pin
Limit Switch-10 A,500V,1NO+1NC Make : Ramson/Schneider/Vaishno
Contactor 12A, 3P, 220V coil voltage. Make : Schneider/ABB/L&T
Contactor 25A, 3P, 220V coil voltage. Make : Schneider/ABB/L&T
Contactor 40A, 3P, 220V coil voltage. Make : Schneider/ABB/L&T
Contactor 65A, 3P, 220V coil voltage. Make : Schneider/ABB/L&T
Thermal Overload relay 2.5-4A, 3P, class 10A, 1 NO + 1 NC Make : Schneider/ABB/L&T
Thermal Overload relay 9-13A, 3P, class 10A, 1 NO + 1 NC Make : Schneider/ABB/L&T
SMPS 24V,5A, 120W Make : NHP (cat No.NHP-ES-125-1-24)/Schneider/ Mean well
Supply & fix in repir steam line 15 mm dia SS 304 pipe including all spares/fittings of suitable flange, collar heavy,, pipe nipple, teflon tape, non metallic ring gasket, long bend, tee, MS long bend heavy as required at site complete all as specified and directed by Engr-in-Charge.
All as per item No. 84 above but of 25mm dia
All as per item No. 84 above but of 40mm dia
Material and labour for fixing heat insulation around SS steam pipe of any size with asbsetos rope,rockwool insulation and aluminium clading including dismantling,removal of unserviceable heat insulation
Material and labour for fixing heat resistant cloth with vacuum absorber technology suitable for steam ironing table/bed press including removal of old unserviceable
Material and labour for repair/rewinding of electric motor 7.5 HP and including following services complete all as specified and directed by the Engr-in-charge. (a) Disconnecting the electrical connection, decoupling with pully/belt/base inside washer extractor/tumble dryer, lifting the motor using chain pulley block and transporting to authorised work shop. (b) Dismantling the motor stator and taking out the burnt copper winding wire /fibre strip/insulating materials. (c) Clean the stator slots by CTC solution and rewind on stator slots with duel coat super enamelled copper wire of existing gauge with insulating materials/fibre strip/varnishing and made terminal connection using 90 mm fibre glass coated wire. (d) Assembling the motor after rewinding. (e) Transporting to the motor to the site re-fixing on base inside washer extractor/tumble dryer with new bolts and nuts, coupling with pully/belt with correct alignment apply grease and connecting electrical connections and testing
All as per item No.89 above but of capacirty 5 HP
All as per item No.89 above but of capacirty 2 HP
All as per item No.89 above but of capacirty 1 HP pumpset
All as per item No.89 above but of capacirty 0.75 HP pumpset fitted inside utility press/calendering machine/vacuum iron table/water softner plant
shakti engineering and electrical works (BID ID -3466216)
Leo Enterprises (BID ID -3467225)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
Tender.pdf
Tender Documents • 0.34 MB
BOQ_822954.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .