Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.0 LAccepted-AOC | ₹4.0 L | L1 | Accepted-AOC L1 |
| 2 | L2₹4.1 L+₹8,017 (1.98%)Rejected-AOC | ₹4.1 L+₹8,017 (1.98%) | L2 | Rejected-AOC L2 |
| 3 | L3₹4.3 L+₹23,840 (5.90%)Rejected-AOC | ₹4.3 L+₹23,840 (5.90%) | L3 | Rejected-AOC L3 |
| 4 | L4₹4.6 L+₹55,955 (13.9%)Rejected-AOC | ₹4.6 L+₹55,955 (13.9%) | L4 | Rejected-AOC L4 |
| 5 | L5₹4.7 L+₹61,490 (15.2%)Rejected-AOC | ₹4.7 L+₹61,490 (15.2%) | L5 | Rejected-AOC L5 |
| Sl No | Description | Qty | Unit | Maharoof P A L3 | K P JOHNY L4 | vino L1 | ABU THAHIR L2 | MUHAMMED K P L6 | M SURESH L5 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00Pre mansoon works | |||||||||
| 1.00 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | 16,306 | sqm | 12 ₹1,95,672 Lowest | 15 ₹2,44,590 | 13 ₹2,11,978 | 13.5 ₹2,20,131 | 16.97 ₹2,76,712.82 | 15.1 ₹2,46,220.6 |
| 1.00 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | 5,230 | sqm | 7 ₹36,610 Lowest | 7 ₹36,610 Lowest | 7 ₹36,610 Lowest | 8 ₹41,840 | 8.66 ₹45,291.8 | 7.71 ₹40,323.3 |
| 1.00 | OD45824/2026-2027:Drainage cleaning and removing vegetations and solid waste | 444 | metre | 200 ₹88,800 | 186 ₹82,584 | 163 ₹72,372 | 100 ₹44,400 Lowest | 212.1 ₹94,172.4 | 188.75 ₹83,805 |
| 1.00 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | 1 | each | 514 ₹514 | 452 ₹452 | 395 ₹395 | 118 ₹118 Lowest | 514.08 ₹514.08 | 457.48 ₹457.48 |
| 1.00 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 2 | each | 2,290 ₹4,580 | 2,015 ₹4,030 | 1,763 ₹3,526 | 837 ₹1,674 Lowest | 2,290.7 ₹4,581.4 | 2,038.49 ₹4,076.98 |
| 1.01 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 35 | each | 350 ₹12,250 | 309 ₹10,815 | 271 ₹9,485 | 225 ₹7,875 Lowest | 352.47 ₹12,336.45 | 313.66 ₹10,978.1 |
| 1.01 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 15 | each | 630 ₹9,450 | 630 ₹9,450 | 485 ₹7,275 | 402 ₹6,030 Lowest | 630.92 ₹9,463.8 | 561.46 ₹8,421.9 |
| 1.01 | OD45728/2026-2027:Labour engaged for man mazdoor | 70 | each | 1,010 ₹70,700 | 888 ₹62,160 | 778 ₹54,460 Lowest | 1,200 ₹84,000 | 1,010.03 ₹70,702.1 | 898.83 ₹62,918.1 |
| 1.01 | 14.75A:Cleaning of terrace/loft water storage tank (inside surface area) upto 2000 litre capacity at all heights with coconut brushes, duster etc., removal of silt, rubbish from the tank and cleaning the tank with fresh water disinfecting with bleaching powder @ 0.5gm per litre capacity of tank including marking the date of cleaning on the side of tank body with the help of stencil and paint and disposing of malba all complete as per direction of Engineer-in-Charge. (The old date already written on tank should be removed with paint remover or black paint and if date is not written with the stencil or old date is not removed deduction will be made @ Rs. 0.10 per litre) (if during cleaning any GI fittings or ball cock is damaged that is to be repaired by contractor at his own cost and nothing extra will be paid on this account) | 19,500 | Litre | 0.47 ₹9,165 | 0.47 ₹9,165 | 0.4 ₹7,800 | 0.3 ₹5,850 Lowest | 0.47 ₹9,165 | 0.42 ₹8,190 |
Tender Value
₹5.2 L
EMD Value
₹13,073
Closing Date
25 Jul 2026, 2:00 pmClosed
Assistant Executive Engineer
o/o Assistant Executive Engineer PWD (B) Sub division Kalpetta
GENERAL PreMonsoon work at 202627 at Collector bungalow ADM Quartres Govt working womens and mens Hostels all Quarters Govt press and staff quarters etc clearing Jungle tree branch cutting cleaning drainage etc
2026_PWD_861465_1
PWD/BLDG/TR/9033/2026_5_1_1/1
Open Tender
Civil Works - Buildings
Item Rate
180 days
KALPETTA
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,155
Yes
₹13,073
Yes
15 Sept 2026
20 Jul 2026
27 Jul 2026
20 Jul 2026
25 Jul 2026
20 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Pre mansoon works | |||||
| 1.001 | 2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared | - | sqm | - | - |
| 1.002 | 2.32:Clearing grass and removal of the rubbish up to a distance of 50 m outside the periphery of the area cleared. | - | sqm | - | - |
| 1.003 | OD45824/2026-2027:Drainage cleaning and removing vegetations and solid waste | - | metre | - | - |
| 1.004 | 2.33.1:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 30 cm girth up to and including 60 cm girth | - | each | - | - |
| 1.005 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | - | each | - | - |
| 1.006 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
| 1.007 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | - | each | - | - |
| 1.008 | OD45728/2026-2027:Labour engaged for man mazdoor | - | each | - | - |
| 1.009 | 14.75A:Cleaning of terrace/loft water storage tank (inside surface area) upto 2000 litre capacity at all heights with coconut brushes, duster etc., removal of silt, rubbish from the tank and cleaning the tank with fresh water disinfecting with bleaching powder @ 0.5gm per litre capacity of tank including marking the date of cleaning on the side of tank body with the help of stencil and paint and disposing of malba all complete as per direction of Engineer-in-Charge. (The old date already written on tank should be removed with paint remover or black paint and if date is not written with the stencil or old date is not removed deduction will be made @ Rs. 0.10 per litre) (if during cleaning any GI fittings or ball cock is damaged that is to be repaired by contractor at his own cost and nothing extra will be paid on this account) | - | Litre | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1456928.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1456928.xls
BOQ • 0.23 MB
viewsbd.pdf
Tender Documents • 1.63 MB
5docuFPAIE.pdf
Tender Documents • 0.67 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .