Loading…
Loading…
Tender ID
Tender Value
₹100.0 L
EMD Value
₹99,997
Closing Date
5 Mar 2026, 6:00 pmClosed
Dy. Municipal Commissioner ( East Zone) Ahmedabad Municipal Corporation
Removing Debris / Silt From Existing Strom water drainage Line By CCTV Camera With Super Sucker Machine and All Equipments at F.P.37 to Ring Road, Girivar Pride to gajuna cross road to gurudvara and other existing storm water lines in Odhav ward East Zone.(ARC)
280959
EZ 30-1523/2025-26
Open
Miscellaneous Works
Works
Ahmedabad
3 documents required · 3 mandatory
₹2,400
Yes
Municipal Commissioner, Ahmedabad
₹99,997
Yes
26 Feb 2026
26 Feb 2026
26 Feb 2026
5 Mar 2026
26 Feb 2026
BILL OF QUANTITIES (PRICE BID)
DATE OF Dt. 05-03-2026 Up to
TENDER DOCUMENT ONLINE. .
Last of Date of Submission of
Tender Fees, EMD & Other
documents in hard copy at AMC - Dt. 06-03-2026 Up to
office by Speed Post or 16.00 hours.
Registered Post AD or Courier
Date of Tender Opening at 17.00 hours
AHMEDABAD MUNICIPAL CORPORATION
BIDDING DOCUMENTS FOR PERCENTAGE RATE CONTRACT
SECTION DESCRIPTION PAGE NUMBERS
E1 GENERAL INSTRUCTIONS 4-6
E2 BILL OF QUANTITIES 7-10
AHMEDABAD MUNICIPAL CORPORATION
BILL OF QUANTITIES
A. General Instruction for the BOQ
1. This is tender invited for Percentage Rates contract.
2. The Bill of Quantities shall be reading conjunction with the Instruction to Bidders,
Conditions of Contract, Technical Specifications.
3. The bidder must have visited and examined the area of the Works and its
surroundings and obtained all data and it is his own responsibility. All information
that may be necessary for preparing the bid and entering into a contract for this
type of Works. The costs of visiting the Site shall be at the bidder's own expense.
4. Bidder must have knowledge of existing sewage flow quantity or he must have got
data of sewage flow quantity in the sewerage trunk main lines or Branch sewer
lines and he must have aware of required pumping for diversion of the existing
flow. Bidder shall have to maintain flow level in all manhole of upstream line during
diversion of flow by proper pumping system. In this regard bidder shall have to
divert the flow in same line by alternate manhole distance if there is no extra
line and he shall not raise any issue of extra line for diversion of the flow.
5. The bidder and any of its personnel or agents will be granted permission by the
Employer to enter its premises and lands for the purpose of such inspection, but
only upon the express condition that the bidder, its personnel and agents, will
release and indemnify the Employer and its personnel and agents from and
against all liability in respect thereof and will be responsible for death or personal
injury, loss of or damage to property and any other loss, damage, costs and
expenses incurred as a result of the inspection.
6. No claim in future for unknown with the site by the bidder shall be granted in any
7. Bidder shall quote the rate for each item considering his profit accordingly. AMC
may execute any item of the BOQ too less or too more in any occasion. Therefore
bidder shall not raise any claim for non executing item or too more executing items
or too less executing item.
8. The basis of payment will be the actual quantities of work executed and carried
out, as measured by the Contractor and verified by the Engineer and valued at the
rates and prices bid in the priced Bill of Quantities, where applicable, and
otherwise at such rates and prices as the Engineer may fix within the terms of the
Contract. Contractor shall not raise any claim for too less or too more
quantities executed by him. Quantity may vary with respect to BOQ as well
as place of work also may change cited in the tender.AMC will execute this
contract subject to availability of the fund. If, fund is not available then AMC
may cancel this tender. Contractor shall not raise any claim in future for this.
9. The rates in the Bill of Quantities, except in so far as it is otherwise, provided under
the Contract, include all constructional plant, labour, supervisions, materials, all
temporary works and false works, erection, maintenance, establishment and
overhead charges, profit, any taxation and levies, octroi and other charges
together with all general risks, liabilities and obligations set out or implied in the
Contract and including remedy of any defects during the Defects Liability Period.
10. Bidder shall fill percentage rate on amount of BOQ which is entirely in India Rupee
11. Bidder is requested to fill rate on total cost of the BOQ considering the
AMC shall evaluate bidders capability to work considering work on hand
and work in progress in all parts of India. AMC shall evaluate bidder`s
capability of doing the work considering working progress and response to
the instructions delivered from AMC engineers and authority to him.
(Note: If any quarry in this clause bidder shall clarify / may contact before entering
in to the contract.)
12. Bidder shall fill percentage rate on amount of BOQ irrespective of the quantity
against the Items (for which rate has been provided). Items other than in the BOQ
will be paid for by the Employer on actual measurement (preferably current SOR of
any organization) onsite if executed.
13. This work is for whole East Zone Bidder must have knowledge of existing sewage
flow quantity or he must have got data of sewage flow quantity in the sewerage
trunk main lines or Branch sewer lines and he must have aware of required
pumping for diversion of the existing flow. Bidder shall have to maintain flow level
in all manhole of upstream line during diversion of flow by proper pumping system.
In this regard bidder shall have to divert the flow in same line by alternate manhole
distance if there is no extra line and he shall not raise any issue of extra line for
diversion of the flow.
14. AMC will have to give the instruction to start the work all together for more than
one places in areas of the zone. For that he should have minimum Two Super
Sucker machine and Three silt carrying tanker Owned by himself only.
15. The bidder and any of its personnel or agents will be granted permission by the
Employer to enter its premises and lands for the purpose of such inspection, but
only upon the express condition that the bidder, its personnel and agents, will
release and indemnify the Employer and its personnel and agents from and
against all liability in respect thereof and will be responsible for death or personal
injury, loss of or damage to property and any other loss, damage, costs and
expenses incurred as a result of the inspection.
16. The contractor should have to attend the breakdown if any as early as possible
and should have to complete the work without unavoidable delay.
17. Contractor shall have to provide experienced operator and workers on hiring of
super sucker on shift bases.
18. In case of Accident or death of Employer’s of Contractor or third party, A.M.C. will
not be Responsible in any manner / Manners.
19. In case of damage of machines due to Accident, AMC will not be responsible.
20. In any case, contractor is not allowed to work inside the manhole or sewer lines.
21. The operator and workers shall be Contractor’s employees. Corporation staff (
Tech.Supervisor/ Engineers) will show only the site where the work is to be carried
22. Payment will be made after getting satisfactory working report from the user
23. The whole cost of complying with the provisions of the Contract shall be deemed to
have been included in the items provided in the priced Bill of Quantities.
(a) General directions and descriptions of work and materials are not necessarily
repeated or summarized in the Bill of Quantities. Reference to the relevant
sections of the contract documentation shall be made before quoting the bid.
(b) The method of measurement of completed work for payment shall be in
accordance with the requirement as stated in the individual sections of the
Technical Specifications.
(c) Contractor shall credit the material dismantled during the work in progress in
AMC store suggested by Engineer in charge of the work.
(d) AMC reserves the right to increase or decrease the scope of work or to incase
of any condition. AMC may start it after approval of competent authority.
Detailed technical specification for all the Items above shall be relevant to PWD manual
general material specification there in during the construction period of the contract.
Contractor should adhere to the specifications and same shall be considered as the
tender document.
Incase of any discrepancy the decision of engineer in-charge shall be considered as final.
In case of any dispute the decision of City Engineer shall be considered as final.
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
AHMEDABAD MUNICIPAL CORPORATION
ENGINEERING DEPARTMENT (EAST ZONE)
NAME OF WORK :-Removing Debris / Silt From Existing Strom water drainage Line By CCTV
Camera With Super Sucker Machine and All Equipments at F.P.37 to Ring Road, Girivar Pride to
gajuna cross road to gurudvara and other existing storm water line’s in Odhav ward East
Item / Description Qty Rate Unit Total
1 Temporary / Permanent Plugging for blocking of
sewer line, branch connections and diversion of
flows and removal of all plugs by any means etc.
comp. as directed by Engineer In Charge of the
(J) 1800 mm dia to 2200mm Dia 5 7500.00 No.
(K) RCC Duct of any size 5 8000.00 No.
2 Provide everything else required for diversion of flow
by pumping and / or bypassing and to maintain the
sewerage system functioning normal and managing
the flow without any sur-charging, overflows etc
during the De-silting/ rehabilitation
works of the sewer line to the satisfaction of the
Engineer in charge of the work.
(A) 300 mm dia 500 100.00 RMT
(B) 450 mm dia 1000 150.00 RMT
(C) 600 mm dia 2000 250.00 RMT
(D) 800 mm dia 320 300.00 RMT
(E) 900 mm dia 5 450.00 RMT
(F) 1000 mm dia 5 475.00 RMT
(G) 1200 mm dia 5 510.00 RMT
(H) 1400 mm dia 5 800.00 RMT
(I) 1600 mm dia 5 1000.00 RMT
(J) 1800 mm dia to 2200mm Dia 5 1100.00 RMT
(K) RCC Duct of any size 50 1200.00 No.
3 Loosen, de-silt and thoroughly clean and remove
debris and objects such as boulders, bricks etc,
bacteriological slimes, roots, encrustations, grease,
carbonated deposits, etc from the sewer line
including disposal of silt / debris / malba / objects
etc, including solidification of silt/malba/debris for
disposal to the dumping sites as per the direction of
the Engineer - in - charge.
(i) ( For Above 80% silted line) 100 % AS / TENDER RATE 250 1230.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS
/ TENDER RATE 984.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 %
AS/TENDER RATE 615.00 RMT
(i) ( For Above 80% silted line) 100 % AS / TENDER RATE 500 1815.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS
/ TENDER RATE 1452.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 %
AS/TENDER RATE 907.00 RMT
(i) ( For Above 80% silted line) 100 % AS / TENDER
RATE 2460.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS
/ TENDER RATE 1968.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 %
AS/TENDER RATE 1230.00 RMT
(i) ( For Above 80% silted line) 100 % AS / TENDER RATE 160 3280.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS
/ TENDER RATE 2624.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 %
AS/TENDER RATE 1640.00 RMT
(i) ( For Above 80% silted line) 100 % AS / TENDER RATE 5 3700.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS
/ TENDER RATE 2960.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 %
AS/TENDER RATE 1850.00 RMT
(i) ( For Above 80% silted line) 100 % AS / TENDER RATE 5 4450.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS
/ TENDER RATE 3560.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 %
AS/TENDER RATE 2225.00 RMT
(G) 1200 mm dia
(i) ( For Above 80% silted line) 100 % AS / TENDER RATE 5 5040.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS /
TENDER RATE 4032.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 %
AS/TENDER RATE 2520.00 RMT
(H) 1400 mm dia
(i) ( For Above 80% silted line) 100 % AS / TENDER
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS
/ TENDER RATE 4704.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 %
AS/TENDER RATE 2940.00 RMT
(I) 1600 mm dia
(i) ( For Above 80% silted line) 100 % AS / TENDER
RATE 6720.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS /
TENDER RATE 5376.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 %
AS/ TENDER RATE 3360.00 RMT
(J) 1800 mm dia to 2200mm Dia
(i) ( For Above 80% silted line) 100 % AS / TENDER
RATE 7560.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 %
AS/TENDER RATE 3780.00 RMT
(K) RCC Duct of any size
(i) ( For Above 80% silted line) 100 % AS / TENDER RATE 25 8000.00 RMT
(ii) ( For 80% to 50 % Drainage silted line) 80 % AS/
TENDER RATE 6400.00 RMT
(iii) ( For Less than 50% to 30 % Dr.silted line) 50 %
4 Post-desilting colour CCTV/ Photographic survey
including pan and Zoom inspection of laterals and
defects and submission of video tapes or CD
inclusive of colour photographs to the Engineer in
(B) 450mm dia 1000 250.00 RMT
(C) 600mm dia 2000 250.00 RMT
(D) 800mm dia 320 250.00 RMT
(E) 900mm dia 5 250.00 RMT
(F) 1000mm dia 5 250.00 RMT
(G) 1200 mm dia 5 250.00 RMT
(H) 1400 mm dia 5 250.00 RMT
(I) 1600 mm dia 5 250.00 RMT
(J) 1800 mm dia to 2200mm Dia 5 250.00 RMT
(K) RCC Duct of any size 50 250.00 RMT
5 Tracking of old Manhole 12.00 1202.00 No
6 Conveyance charge of earth, lime, murrum, building
rubbish, manure, garbage, sludge, excavated rock, fly
ash, aggregates of any kind executed outside the road
site. Rate also includes spreading & levelling etc 50.00 52.42 CMt
complete. Internal conveyance above 50 mt done within
the work site is not payable. (e) Lead From 4 Km to
7 Dewatering by pumping set of required capacity
including temporary platform carting pumping at site
and fixing the same in position including all accessories, 500.00 18.32 HP/hr.
and fuel and labour etc. complete.
8 Providing and laying controlled cement concrete M.200
for curing complete excluding cost of formwork and
reinforcement for reinforced concrete work in Slabs, 1.00 4460.36 CMt
landing, shelves, Balconies Lintels, Beams, Girders and
Cantilever upto floor two level.
9 Providing TMT Bar FE 415 reinforcement for R.C.C. work
including bending, binding and placing in position 20.00 66.59 Kg.
complete up to floor two level (up to 10 ton)
10 Providing form work in ordinary timber planking so as
to give a rough finish including centering, shuttering,
strutting and propping etc. height of propping and
centering below supporting floor to celling not
exceeding 4 M & removal of the same for in situ
reinforced or plain concrete work upto floor four level
Foundation, footings, bases of columns etc. and mass
concrete. 25.00 171.68 Smt
11 Brick work using common burnt clay building bricks
having crushing strength not less than 35kg./ Sq.Cm.in
foundation and plinth in Cement Mortar1:6 (1- Cement
: 6 - fine sand)
(A) Conventional (upto 10 ton) 5.00 3981.21 Cmt
12 Providing and fixing M.S. grills , gate, stair/ balcony
railling, elevation element of decorative pattern with
M.S. channel, flat, Medium grade m.s.pipe, square or 69.00 100.17 kg
round bars with round headed bolts, nuts, or by screw
13 Providing 15 mm thick cement plaster in single
coat on Rough (Similar) side of single or half brick walls
for interior plastering up to floor two level and 19.00 174.83 Sqm
finished even and smooth in (i) Cement mortar 1:3
(1-cement :3-sand)
14 Demolition including stacking of serviceable
materilas and disposal of unserviceable materials with 1.00 1047.38 Ctm
all lead and lift. (i) R.C.C. work
15 Demolition of Brick work and stone masonry including
stacking of serviceable material as and disposal of
unserviceable materials with all lead and lift.(ii) In 3.00 544.95 Ctm
Seal and Signature of the Bidder Additional City Engineer
Date: Ahmedabad Municipal Corporation
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
TND 1523 CCTV Desilting SWD Volume-I Technical Bid.pdf
TND 1523 CCTV Desilting SWD Volume-II Price Bid.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .