| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.5 LAccepted-AOC | ₹16.5 L | L1 | Accepted-AOC 1st lowest responsive bidder |
| 2 | L2₹16.6 L+₹11,652.34 (0.71%)Rejected-Finance | ₹16.6 L+₹11,652.34 (0.71%) | L2 | Rejected-Finance Unsuccessful bidder |
| 3 | L3₹16.7 L+₹16,737 (1.01%)Rejected-Finance | ₹16.7 L+₹16,737 (1.01%) | L3 | Rejected-Finance Unsuccessful bidder |
| 4 | L4₹18.0 L+₹1.5 L (8.83%)Rejected-Finance | ₹18.0 L+₹1.5 L (8.83%) | L4 | Rejected-Finance Unsuccessful bidder |
| 5 | L5₹18.0 L+₹1.5 L (8.99%)Rejected-Finance | ₹18.0 L+₹1.5 L (8.99%) | L5 | Rejected-Finance Unsuccessful bidder |
Tender Value
₹21.2 L
EMD Value
₹22,000
Closing Date
27 Apr 2026, 5:00 pmClosed
SE Bargarh Irrigation Division Bargarh
At Canal Colony Bargarh Odisha
Construction of VRB andrestoration of syphon at RD 152m of Baiman Distributary
2026_CEBBU_128072_1
BID-01 of 2026-27 dated 07.04.2026
Open Tender
Civil Works - Canal
Percentage
60 days
Bargarh
2 documents required · 2 mandatory
₹6,000
₹22,000
Yes
24 Aug 2026
13 Apr 2026
28 Apr 2026
13 Apr 2026
27 Apr 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Dismantling brick or stone masonry in lime or cement mortar under 3m. height including stacking the useful materials for reuse and removing the debris abate from worksite with all lead etc. complete as per direction of Engineer-in-charge | |||||
| 2 | Earthwork exavation in all kind of Soil including dressing and levelling the bed and depositing the excavated materials away from the work site with all leads, lifts, sundries, T&P required for the work etc complete as directed by the engineer in Charge | 0.8 | Per cum | - | - |
| 3 | Filling foundation and plinth with sand including cost, conveyance & royalty of all materials to the work site including watering & ramming with all leads, lifts, sundries & T&P etc. complete, as per direction of Engineer-in-Charge. | 1 | Per cum | - | - |
| 4 | C.C. work of M-15 with 40 mm down graded hard granite crusher broken metal including cost, conveyance, royalty and other taxes of all materials to the work site, mixing and laying of concrete in position & compacted properly with all leads, lifts, sundries with all hire & running charges of machineries such as concrete mixer, vibrator etc. required for the work site with proper compaction and curing etc. complete as per the direction of Engineer-in-charge | 1 | Per Cum. | - | - |
| 5 | R.C.C. work of M-25 with 20 mm down graded hard granite crusher broken chips including cost, conveyance, royalty and other taxes of all materials to the work site, mixing and laying of concrete in position & compacted properly with all leads, lifts, sundries with all hire & running charges of machineries such as concrete mixer, vibrator etc. required for the work site with proper compaction and curing etc. complete as per the direction of Engineer-in-charge. | 1 | Per Cum. | - | - |
| 6C.C. work of M-20 with 12 mm down graded hard granite crusher broken metal including cost, conveyance, royalty and other taxes of all materials to the work site, mixing and laying of concrete in position & compacted properly with all leads, lifts, sundries with all hire & running charges of machineries such as concrete mixer, vibrator etc. required for the work site with proper compaction and curing etc. complete as per the direction of Engineer-in-charge. | |||||
| 7 | Supplying, Fitting & Placing uncoated HYSD bar Reinforcement complet as per drwaing & specification including cost of binding wire, cutting, bending & binding etc Complete as per the direction of Engineer in Charge | 0.8 | Qntl. | - | - |
| 8Rigid smooth centering & shuttering for C.C. work including false work and dismentaling them after casting including cost & conveyance of materials complete as per drawing & specification with all leads, lifts, sundries and T&P etc. complete as per the direction of Engineer-in-charge. | |||||
| 8.1 | A) For Plinth Bend, Footing Base | 0.2 | sqm | - | - |
| 8.2 | B) For Floor & Roof Slab | - | sqm | - | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_587724.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
1BIDDOCUMENT03.pdf
Tender Documents • 2.21 MB
BOQ_587724.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .