| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹14.9 L+₹1.2 L (8.66%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹15.3 L+₹1.6 L (11.5%)Rejected-AOC MATHRAKAT HO PERINGALA P O KUMARAPURAM ALUVA 633565 | 633565 | L3 | Rejected-AOC L3 |
Tender Value
₹15.3 L
EMD Value
₹38,295
Closing Date
12 May 2023, 3:00 pmClosed
Executive Engineer
Mechanical Division,Irrigation,2nd floor, Mini Civil Station,Alappuzha-688013
Rejuvenation of Kaithakom Dam Mechanical Works
2023_Irrig_574714_1
IRR/MH/TR/258/2023_16_1_1/1
Open Tender
Miscellaneous Works
Item Rate
180 days
Manjapra
No
8 documents required · 8 mandatory
₹2,760
Yes
₹38,295
24 Jun 2023
4 May 2023
15 May 2023
4 May 2023
12 May 2023
4 May 2023
4 May 2023 - 12 May 2023
Amount
Ring bund & balling out water
OD27132/2022-2023:RING BUND Type-I-Putting up ring bund as per approved shape 2.5m bottom width, 1m top width using empty gunny/polythene bags filled with earth placed in 2 rows at 0.6m apart and filled in between with puddle clay to form bund for an average height 2.00m including labour dismantling the bund after completion of the work, etc. complete.
OD27133/2022-2023:60.2.3 Bailing out water using pump above 5 HP and Up to 10 HP-Bailing out water with engine and pump set above 5HP and up to 10HP, including conveyance to site and erection, cost of fuel, lubrication oil, and other stores pay of staff, etc complete
Dismantling
OD27151/2022-2023:Dismantling of canal shutter (up to 2 Tonne weight)/hoisting bridge/embedded parts etc and stacking at a distance of a 100m including hire charge of machinery, labour etc complete as directed by departmental officer at site.(weight of unserviceable shutters and embedded parts may be calculated as 60% and unserviceable hoisting unit as 80%)
Concrete works
15.3:Demolishing R.C.C. work manually / by mechanical means including stacking of steel bars and disposal of unserviceable material with in 50 metres lead as per direction of Engineer -in-Charge.
5.9.6:Centering and shuttering including strutting, etc. and removal of form for:Columns, Pillars, Piers, Abutments, Posts and Struts
4.2.3:Providing and laying cement concrete in retaining walls, return walls, walls ( any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts,buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor, etc. up to floor five level, excluding the cost of centering, shuttering and finishing:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size)
Supply and Fabrication of gates
OD27145/2022-2023:Supply of MS plates confirming to IS 2062GrB including the cost of conveyance charges
OD27146/2022-2023:Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges.
OD27147/2022-2023:Fabrication and supply of Structural steel canal shutters ( Up to 2 tonne weight ) /Hoisting Bridge / Platfurm and accessories etc. for the same as per approved specifications, drawings and directions ofdeptl fficer at site including cost of labour, machinery, all leads and lifts, incidental and handling charges etc complete but excluding cost of material already supplied
Supply, fabrication and erection of Embedded parts
OD27163/2022-2023:Supply of MS round bar including cost of conveyance
OD27136/2022-2023:Supply of MS plates confirming to IS 2062GrB including the cost of conveyance charges.
OD27135/2022-2023:Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges.
OD27137/2022-2023:Fabrication and errection of Embedded parts for canal shutters ( up to 2 tonne weight ) and accessories as per approved specifications, drawings and directions of deptl fficer at site including cost of labour, machinery, all leads and lifts, incidental and handling charges etc complete but excluding cost of material already supplied
Supplying and fixing in correct poisition with specified initial interface the rubber seal
85.116:Supplying and fixing in correct position with specified initial interface the flat type rubber seal confirming to IS 11855 to the gates including cost of SS bolts and nut all labour and machinery and incidental and conveyance charges complete as per approved specification and drawing
85.117:Supplying and fixing in correct position with specified initial interface the Angular type rubber seal confirming to IS11855 to the gates including cost of SS bolts and nuts and all labour and machinery and incidental and conveyance charges complete as per approved specifications and drawings
Supply & Fabrication of hoisting bridge
OD27167/2022-2023:Supply of MS Tees, Angles, Joists, ISMB, ISMC confirming to IS2062GrA/B including cost of conveyance charges.
OD27142/2022-2023:Supply of MS plates confirming to IS 2062GrB including the cost of conveyance charges.
OD27165/2022-2023:Supply of MS round bar (above 12mm dia) including cost of conveyance
OD27144/2022-2023:Fabrication and supply of Structural steel canal shutters ( Up to 2 tonne weight ) /Hoisting Bridge / Platfurm and accessories etc. for the same as per approved specifications, drawings and directions ofdeptl fficer at site including cost of labour, machinery, all leads and lifts, incidental and handling charges etc complete but excluding cost of material already supplied
Providing hoisting mechanism
OD27139/2022-2023:Supply of screw shaft 63mm outer dia , head pitch of 12.7 mm root dia 50.3 mm using EN -8 shaft Including cost of all material, labour,tools etc. complete.
OD27169/2022-2023:Providing ofworm and pinion having a lifting speed of around 5.00 cm/min for hand operation including cost of all materials, labour, hire charges and conveyance etc complete
Erection of the gates,hoisting bridge,handrail,ladder etc
OD27134/2022-2023:Erection of the Canal Shutter ( Up to 2 Tonne weight ) / Hoisting Bridge / Platform including handrails, ladder, etc. for the same including. alignment correcting and setting complete including the cost of all labor, machinery, incidental and conveyance, lead and lift charges etc complete but excluding the cost of materials already supplied
Painting
85.114:Painting all the exposed surfaces of the gate and embedded parts with two coats of epoxy coal tar black paint confirming to IS14948 with a minimum film thickness of 150+/-5 microns per each coat over two coats of priming coat applied with zinc primer containing not less than 85% of zinc on dry film with a film thickness of 70+/-5 microns , so that the total film thickness of all coats including priming coat at any rate is not less than 350 microns after cleaning the surface using hand and power tool cleaning including cost of all materials, labour charges , cost of testing all painting materials, all incidental charges, hire of T&P etc. complete as per the direction of department officers at site
Excellent
P V Moosa Engineering Contractor
Bidder Name
MOHAMMED MUSTHAFA V
Excellent
P V Moosa Engineering Contractor
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_848477.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .