Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.2 LAccepted-AOC AT PO KUANSH DIST BHADRAK PIN 7561600 | 756160 | ₹9.2 L | L1 | Accepted-AOC Winner of the transparent lottery system |
| 2 | L1₹9.2 LRejected-Finance AT SANTHIA NILAKANTHAPUR DIST BHADRAK | BHADRAK | ODISHA | ₹9.2 L | L1 | Rejected-Finance Looser of the transparent lottery system |
| 3 | L1₹9.2 LRejected-Finance AT NILAKANTHAPUR PO DIST BHADRAK | BHADRAK | BHADRAK | ODISHA | ₹9.2 L | L1 | Rejected-Finance Looser of the transparent lottery system |
| 4 | L1₹9.2 LRejected-Finance KUANSH BHADRAK | ₹9.2 L | L1 | Rejected-Finance Looser of the transparent lottery system |
| 5 | L1₹9.2 LRejected-Finance | ₹9.2 L | L1 | Rejected-Finance Looser of the transparent lottery system |
Tender Value
Refer Docs
EMD Value
₹10,784
Closing Date
3 Mar 2026, 5:00 pmClosed
SERandBDivisionBhadrak
O/O SE Rand B DivisionBhadrak
Renovation of SDO quarter such as Repair ,Reconstruction of 1no quarterfor the year 2025-2026.
2026_EICCL_126576_1
SE RandB BDK-39/2025-26-4
Open Tender
Civil Works - Buildings
Percentage
30 days
Bhadrak
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹10,784
Yes
6 Jun 2026
24 Feb 2026
4 Mar 2026
24 Feb 2026
3 Mar 2026
24 Feb 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismentling of Cement concrete,RCC Column, Beam,Slab, Staircase landing,lintels including T&P and scaffolding where ever necessary sorting the dismantled materials, disposal of unserviceable materials and stacking the serviceable materials with all lift and leads of 50 Mtrs. etc.complete as directed by Engineer-in-charge. (A) Roof Slab | - | Each Sqm. | 1,697 | - |
| 2 | Dismentling brick or stone masonary in lime or cement mortar under 3 Mtr.height including stacking the useful materials for reuse and removing the debries away from worksite etc.complete as per direction of Engineer-in-charge. | 1 | Each cum. | 1,611.7 | ₹1,610.09 |
| 3 | Dismantling and removing 2.5cm.thick A.S.Flooring and stacking the useful materials for reuse and removing the debries within 50M.lead from worksite etc. complete as per direction Engineer-in-charge. | 1 | Each Sqm | 115.4 | ₹115.28 |
| 4 | Removing Old lime or cement plaster from walls Iincluding rackingout joints 12mm deep and stacking the useful materials for reuse and removing the debries within 50M.away from worksite including all cost of labour T&P etc.complete as directed by Engineer-in-charge. | - | Each Sqm. | 57.7 | - |
| 5 | Fly Ash brick masonary in C.M(1:6)using bricks of size 25cmx12cmx8cm having crushing strength 75kg/cm2 after immersing the bricks for six hours in water before use in Superstructure with all necessary projections, cutting,moulding, corebelling, champering,watering and curing with all cost of materials and labour T&P etc.complete as per direction of Engineer-in-charge. | - | Each sqm | 5,786.2 | - |
| 6 | RCC work of Prop (M-20) using 20mm and down graded BHG(C.B) stone of appd.quality from appd. Quarry including hoisting,lowering,laying and compacting concrete,watering and curing centering,shuttering and finishing the exposed surface smooth with cost,conveyance,royalties and taxes including all cost of materials and labour T&P etc.complete as per direction of Engineer-in-charge. (A) Lintel | - | Each Cum | 12,930.7 | - |
| 7 | Chajja | 8.55 | Sqm | 1,305.7 | ₹11,159.56 |
| 8 | (B) Roof Beam | - | Each Cum | 19,235.4 | - |
| 9 | ( C) Roof Slab | 1 | Each Cum | 14,811.4 | ₹14,796.59 |
| 10 | Cutting straightening of steel HYSD (Fe-415) conforming to (IS-1786) with bending, binding, cranking, hooking, welding or joining if necessary & tying the grills and placing in position as required for the Rod work in all floors and & for providing fan hooks hosting lowering & laying steels including cost conveyance taxes & royalties of alol materials and binding wires of 18 to 20 gauge & cost of all labour T&P required for the work etc. complete in all respect as per the direction of Engineer in charges (payment will be made on weight of MS rod or tersteel only basing on the co-efficient of MS rod or for steel bars approved by SAIL/TATA/competent authority and (No separate payment will be made towards the cost of binding wires over lapping, wastage coupling welded, joints,spacer bars, chairs stays,hangers and annealed steel wire o9r other methods for binding and placing etc. complete as per the direction of Engineer-in-charge. | 1 | Each Qtl. | 8,553.2 | ₹8,544.65 |
stage.html
html • 0.06 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_582763.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_582763.xls
BOQ • 0.35 MB
4dtcnsdoquarter.pdf
Tender Documents • 2.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .