DRDA Tiruchirappalli
Renovation of Ponds and Ooranies under State Finance Commission Grant in T.Pet Block in Tiruchirappalli District for the year 2019-20 Phase II Package No.32
2020_RDTN_174778_32
A10/2340/2019 Dated 30.07.2020
Open Tender
Civil Works - Lift Irrigation Schemes
Item Rate
180 days
Tiruchirappalli
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹16,000
DRDA Tiruchirappalli
23 Sept 2020
7 Aug 2020
15 Sept 2020
7 Aug 2020
15 Sept 2020
7 Aug 2020
10 Aug 2020
Amount
Desilting the Kasivu Neer Kuttai and (Construction of Weir @ Sekadinatham Village) in Anjalam Panchayat.Clearing the Scrub jungles including all labour charges for burrying & Burning ect.,Complete. Scrub Jungles: SOR SI ( 3 )
Earth work in all soil Except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinery and tippers including benching,formation of bunds,breaking clods,sectioning etc Completed. SOR ( 86 )
Earth work excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with intial lead and lift asper SS 20 B including shoring baling out water where necessary etc.complete for foundation.
Sand filling with good river sand including cost and conveyance of all material to site and all labour charges etc. complete.
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyance of all materials to site and all labour chargesetc., complete.
Concrete broken stone in C.M. 1:3:6 using 40MM ISS. Size HBG metal including cost and conveyance of all materials to site all labour charges etc. complete watering curring and compacting concrete etc.
Cement concrete1:2:4 mix using 20 mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X '3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification.
Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X '3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification.
Provisions for name board
RENOVATION (AND NEW WEIR CONSTRUTION AT KARUNG KUTTAI) @ KARIKALI KUTTAI IN KARIKALI VILLAGE AND PANCHAYAT. Clearing the light jungle and removed away from the site including all cutting charges and all labour charges as per standard specification
Earth work in all type of soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth mooving machineries and tippers including benching, formation of bunds, breaking of clods and sectioning etc., complete.
Earth work deploying earth moving machinery for desilting channel and forming bund on either side and depositing the earth on banks including jungle clearance etc., complete.
Earth work excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with intial lead and lift asper SS 20 B including shoring baling out water where necessary etc.complete for foundation.
Sand filling with good river sand including cost and conveyance of all material to site and all labour charges etc. complete.
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyance of all materials to site and all labour chargesetc., complete.
Concrete broken stone in C.M. 1:3:6 using 40MM ISS. Size HBG metal including cost and conveyance of all materials to site all labour charges etc. complete watering curring and compacting concrete etc.
Cement concrete1:2:4 mix using 20 mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X '3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification.
Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X '3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification.
Provision for Name board charges
Desilting the Saroja Kuttai )@ Solampatti Village) in Thumbalam Panchayat.Clearing the Scrub jungles including all labour charges for burrying & Burning ect.,Complete. Scrub Jungles: SOR SI ( 3 )
Earth work in all soil Except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 m deploying earth moving machinery and tippers including benching,formation of bunds,breaking clods,sectioning etc Completed. SOR ( 86 )
Earth work excavation in all classes of soils except hard rock requiring blasting soils such as hard stiff clay ordinary gravel etc., with intial lead and lift asper SS 20 B including shoring baling out water where necessary etc.complete for foundation.
Sand filling with good river sand including cost and conveyance of all material to site and all labour charges etc. complete.
Cement concrete 1:4:8 mix using 40 mm ISS HBG metal including cost and conveyance of all materials to site and all labour chargesetc., complete.
Concrete broken stone in C.M. 1:3:6 using 40MM ISS. Size HBG metal including cost and conveyance of all materials to site all labour charges etc. complete watering curring and compacting concrete etc.
Cement concrete1:2:4 mix using 20 mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete.
Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X '3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification.
Supplying and erecting centering for sides Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X '3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification.
Provisions for name board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
RV CONSTRUCTIONS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .