Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
9 Aug 2024, 3:00 pmClosed
HOD (MECH)
CCI TANDUR PIN CODE 501158
Annual contract for Plant Maintenance Jobs Post clinkerisation works
2024_CCI_203202_1
TCF/MECH/07/3080/3099/24
Open Tender
AMC/ Maintenance Contracts
Fixed-rate
365 days
CCI TANDUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
23 Aug 2024
31 Jul 2024
10 Aug 2024
31 Jul 2024
9 Aug 2024
31 Jul 2024
Amount
Replacement of main Gear box (K140- 20MT approx.) and its alignment including removal & re-fixing of Torsion shaft (2.5MT Aprox).: * EOT Crane is available in the section, in case of EOT Failure work shall be done manually by using chain blocks.
Dismantling
Errection and Alignment of Gear box with pinion via Torsion Shaft & HT Motor.
Replacement of counter shaft Bearings(white metal ø340 mm Wt: 320kg).
Dismantling including shifting of scrap. Requires lifting /releaseing the load of Pinion shaft assly (4.0MT) at that position only. ( EOT crane is not accesable.)
Errection by matching blue impression including Shifting New Bearing to the work place and finishing work.
Dismantling & erection of Torsion Shaft/ Counter shaft Size;tø570mm ; Length 5400mm including shifting.
Replacement of Gear couplings GC-9 & GC-14.
Dismantling of GC-9 coupling including keeping aside the HT Motor(2000kw)to make space to work.
Erection of GC-9 coupling including refixing with alignment of HT Motor(2000kw).
Dismantling of GC-14 coupling at out put of Gear box / pinion shaft including removal of torsion shaft.
Erection of GC-14 coupling including refixing of torsion shaft.
Replacement of Trunion bearing Ø2000mmx1000mm width: 1.60 MT including lifting of mill, cleaning the oil sump 7 refilling oil etc;
Dismantling & shifting.
Erection ( includs scraping & matching) and finishing work.
Replacement of Cement mill & Coal crusher liners,
Dismantling & shifting of Diaphragm liners, head liner, shell liners straight /curved Gib liners etc and scarap removal.
Errection, finishing work of Diaphragm liners, head liner, shell liners, straight /curved Gib liners etc;
Dismantling & shifting of Shell Liner & Diaphragm plates in 2nd chamber including scrap removal.
Errection, finishing work & shifting of scrap plates in 2nd chamber(400 plates)
Replacement of mill inside Cone: Size :ø 477 to ø25 mm convegrent; Wt 53 kg.
Chain Bucket Elevators 630mm*232mm &1000 mm *355mm.
Repairing of damaged buckets including cutting, Welding and Drilling Etc;
Dismantling & Erection of Head(Top) Drum including acivities of removal of hood , bearings , coupling and all related finishing works.
Dismantling & Erection of Tail (Bottom) Drum including acivities such as removal of bottom doors, arresting the counter weight and all related finishing works.
Replacement of chain links .
Replacement of U bolt .
Replacement of Buckets .
Belt Bucket elevator size:450mm, cap165tph, 42 mtrs c/c
Replacement of Steel chord belt 450 mm (total length of 90 mtrs) including removal and re-fixing of buckets, hood, doors, preperation of ends for joiting (excluding joint), tightening and finishing work.
Bucket bolts tightening (four bolts of a bucket makes a set) .
Replacement of Buckets .
PG Conveyor size;315mm width etc;
Dismantling of PG conveyor ( top & bottom boxes) along with air slide cloth
Installation of PG conveyor(top & bottom boxes) by fixing air slide cloth with leak proof tightening of bolts
Replacement of air slide cloth with leak proof tightening of bolts.
Replacement of airslide blower
ID fan Size: 1718 mm dia ; Capacity - 54000m3/hr.
Dismantling
Replacement of ID fan including fixing of bearings, bibby coupling and alignment
Replacement of Hopper feeding Tipper Rails & wheels. Two Wheels consisting of one axle becomes a set.
Dismantling of wheels by removal of bearings, Sprackets, coupling, Gear box Etc;
Errection and finishing work including re fixing of Bearings & sprackets, Gear box, couplings etc;
Dismantling of rails
Errection of rails including fixing of locking plates. Supports etc;
Replacement of Conveyor belts for various size from 650mm to 1200mm (Removing the old belt, laying new and positioning , making ready to carry the joint by releasing the belt load & restore the belt after joint for trail run/ re-positioning the fell down belt for re jointing).
up to the length of 50 mtrs
up to the length of 100 mtrs
length above 200 mtrs.
Replacement of 1000mm width endless belts up to the length of 15Mtrs including finishing work for trail run.
Replacement of idlers for the belt conveyors 650 mm width to 1200 mm width.
Replacement of troughing/impact/ return idlers.
Replacement of Head pulley /Tail pulley / Snub pulley/ Bend pulley(including dismantling and fixing of coupling/bearings , release and adjustment of counter weight arrangement etc; )
Shifting/lifting/lowering of materials (i.e Plates, equipment spares, lubricants, Gearbox,,screw flight,airslide boxes,airslide blowers, (below 0.5MT).
Stores to workplace ( Ground floor) includes to and fro
From Ground floor to 30 Mtrs includes to & fro
Replacement of various sizes of Gearboxes/couplings / pulleys /oil pumps, heat exchangers, srew conveyors /any machinery/equipment items, such as crusher / v. screen/ Bucket elevator / belt pulley bearings, etc. with alignment at any elevation (below 0.5MT).
Shifting/lifting/lowering of materials (i.e Plates, equipment spares, lubricants, Gearbox,,screw flight,airslide boxes,airslide blowers, (above 0.5MT).
Stores to workplace ( Ground floor) includes to and fro
From Ground floor to 30 Mtrs includes to & fro
Replacement of various sizes of Gearboxes/ bearings /any machinery/equipment items such as girth gear pinion, auxillery gear box, etc. with alignment at any elevation(above0.5MT)
Patch plate welding of chutes at any elevation.
Patch plate welding .
Patch welding
Replacement of Coal crusher Hammers with arms (includes removal of arm & hammers, assembly of New Hammers with arm , fixing hammer set to the rotor etc., and finishing works. (60 hammers makes a set and each hammer of 14 kg ).
Replacement of stacker's travelling boggies.
Dismantling including removal of Gear boxes, couplings and its connecting parts etc
Erection of boggies including refixing of gear boxes and its alignment.
Replacement of Wagon tippler Rubber pads at any elevation including approachable reach.
Fabrication, Dismantling and Errection of different structures viz, hopper grill, Belt conveyor structure, skirt board, counter weight structure, tail drum trolley, deck plate etc;
Fabrication.
Dismantling and Shifting the scrap to scrap yard.
Errection of plates including cutting/welding/fixing.
ABAK Constructions
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .