| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 LAccepted-AOC | L1 | Accepted-AOC Accepted Vide Resolution No.2(1) dtd.08.10.2025 of Arakuzha GP | |
| 2 | L2₹5.3 L+₹26,672.52 (5.27%)Rejected-AOC | L2 | Rejected-AOC Higher rate and hence not admitted |
| Sl No | Description | Qty | Unit | DK INFRASOLUTIONS L2 | JIBISH C.S L1 |
|---|---|---|---|---|---|
| 1.00Detailed Estimate | |||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 22.53 | cum | 366 ₹8,245.98 | 357.92 ₹8,063.94 Lowest |
| 1.00 | OD289843/2025-2026:Dry rubble masonry - Dry rubble masonry with good quality blasted rubble including
conveyance of material and labour charges etc. complete as per direction of departmental officers at
siteModified 60.7.1 | 91.22 | cum | 4,100 ₹3,73,993.8 | 3,973.49 ₹3,62,453.81 Lowest |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 300.75 | kilogram | 115 ₹34,586.37 | 111.87 ₹33,645.01 Lowest |
| 1.00 | 5.3:Reinforced cement concrete work in beams, suspended floors, roofs, having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement, with1:1.5:3 (1 cement : 1.5 coarse sand (Zone III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources). | 3.53 | cum | 14,000 ₹49,364 | 13,374.93 ₹47,160 Lowest |
| 1.00 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 0.91 | cum | 10,000 ₹9,090 | 9,189.79 ₹8,353.52 Lowest |
| 1.01 | 50.2.25.1:Filling with contractor's own earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m as per direction of site Engineer-in-charge | 63.52 | cum | 900 ₹57,166.2 | 725.74 ₹46,097.55 Lowest |
Tender Value
₹5.1 L
EMD Value
₹12,708
Closing Date
4 Oct 2025, 12:00 pmClosed
AE
AE LID EW SECTION
Playground construction
2025_LSGD_801217_1
38/AE/LSGD/ARK/25-26
Open Tender
Civil Works - Others
Item Rate
180 days
Arakuzha
Please refer tender documents
10 documents required · 10 mandatory
₹1,125
₹12,708
30 Oct 2025
24 Sept 2025
6 Oct 2025
24 Sept 2025
4 Oct 2025
24 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1330357.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .