Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.8 LAccepted-AOC A R AND M O ON VARIOUS ROAD IN SECTION NALAGARH 1 UNDER NALAGARH SUB DIVISION SH HIRING OF JCB | 1 | Accepted-AOC L1 | |
| 2 | 2₹12.6 L+₹6,132 (0.49%)Rejected-Finance R O V P O DHALOH TEHSIL GHUMARWIN DISTT BILASPUR H P | BILASPUR | HIMACHAL PRADESH | 174001 | 2 | Rejected-Finance 2 | |
| 3 | 3₹13.3 L+₹75,992 (6.06%)Rejected-Finance 00 AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | 3 | Rejected-Finance 3 |
Tender Value
₹9.5 L
EMD Value
₹19,000
Closing Date
25 Jun 2024, 11:00 amClosed
Executive Engineer
Jal Shakti Vibhag Division Bilaspur
A/R and M/O LWSS Suin Surhar in Tehsil Sadar District Bilaspur (SH Operation of pumping machinery and distribution system from Sector storage tank to different habitation for one year).
2024_HPIPH_89104_1
BLP-BLP-00736 NIT No. 1912-2011 dated 14/06/2024
Open Tender
Civil Works
Item Rate
365 days
Sub Division Jukhala Section Malokhar
Please refer Tender documents.
7 documents required · 7 mandatory
₹250
Yes
EE Bilaspur
₹19,000
Yes
2 Jul 2024
15 Jun 2024
25 Jun 2024
15 Jun 2024
25 Jun 2024
15 Jun 2024
Amount
Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Suin Surhar whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge.
Description of main components of the scheme is as under:-
Civil works: 2 Nos pump house, Sump well/ Percolation well. Rising main: Booster stage 80mm dia 40 rmt,1st stage 80mm dia=2170 Rmt & 65mm dia 630 Rmt Pumping machinery: Booster stage 1x2=2HP, 1st stage 2x40=80 HP, 2nd stage 2x25=50 HP Distribution system: 26700 Rmt No of storage tanks: 4 Nos, 10 No habtiaitons , Total working hours: 44 through , 6 Nos perons. Indicators to be mentioned:Average per day Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Pumping hours per day (16) and energy consumptoin per day Unit.
M/S Anil Kumar
Pawan Kumar
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .