| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 LAccepted-AOC AWAS VIKAS COLONY BUDAUN | BUDAUN | BUDAUN | L1 | Accepted-AOC 1st | |
| 2 | L2₹9.0 L+₹500 (0.06%)Rejected-AOC | L2 | Rejected-AOC 2nd | |
| 3 | L3₹9.0 L+₹616.92 (0.07%)Rejected-AOC SHIVBAG MANDI TEHSIL BILASPUR DISTRICT RAMPUR | BILASPUR | RAMPUR | UTTAR PRADESH | L3 | Rejected-AOC 3rd | |
| 4 | Rejected-Technical 00 NEAR SHIV MANDIR NASIRABAD MILAK RAMPUR UTTAR PRADESH 243701 | 243701 | - | Rejected-Technical Not Accepted |
| Sl No | Description | Qty | Unit | M/S SUSHIL KUMAR CONTRACTOR L1 | M/S RAM BHAROSE CONTRACTOR L2 | PAHAL MAHILA UPBHOKTA SAHAKARI SAMITEE L3 |
|---|---|---|---|---|---|---|
| 1.00Ward 12 me hospital road tak ba anya galiyon me CC tiles interlocking Road va nali nirman karya (As per Estimate) | ||||||
| 1.01 | Earth work in foundation or embankment in ordinary soil including earth from 5 km to the site. chap‑04 sr no.251 | 58.46 | Cum | 196 ₹11,458.16 Lowest | 196 ₹11,458.16 Lowest | 198 ₹11,575.08 |
| 1.02 | Earth work in filling or embankment in ordinary soil including earth from 5 km to the site. chap‑04 sr no.251 | 226.53 | Cum | 200 ₹45,306 Lowest | 200 ₹45,306 Lowest | 200 ₹45,306 Lowest |
| 1.03 | Cement concrete with 4 cm gauge brick ballast with fine sand of 1.25 FM and cement in 1:2:6:1 stone including labour material T&P incl all compl. (SR NO.273) | 12.99 | Cum | 3,650 ₹47,413.5 Lowest | 3,650 ₹47,413.5 Lowest | 3,650 ₹47,413.5 Lowest |
| 1.04 | M‑150 brick work in 1:4 cement and coarse sand mortar including all cost of materials labour and T&P etc required for proper completion of work sr no.305 | 20.24 | Cum | 5,110 ₹1,03,411.07 Lowest | 5,110 ₹1,03,411.07 Lowest | 5,110 ₹1,03,411.07 Lowest |
| 1.05 | 12 mm thick plaster in 1:4 cement coarse sand and mortar over brick work including all cost of materials labour and T&P etc required for proper completion of work (sr no.581) | 145.6 | sqm | 245 ₹35,672 Lowest | 245 ₹35,672 Lowest | 245 ₹35,672 Lowest |
| 1.06 | Concrete with 2 cm gauge stone ballast coarse sand of 1.25 FM and cement proportion of 1:4:2:1 including supply of all materials labour and T&P etc required for proper completion of work (279) | 1.96 | Cum | 7,600 ₹14,896 Lowest | 7,600 ₹14,896 Lowest | 7,600 ₹14,896 Lowest |
| 1.07 | Concrete with 4 cm gauge stone ballast with fine sand of 2.25 FM and cement in 1:2:6:1 in foundation including supply labour material T&P incl all compl. (SR NO.273) | 50.34 | Cum | 3,650 ₹1,83,741 Lowest | 3,650 ₹1,83,741 Lowest | 3,650 ₹1,83,741 Lowest |
| 1.08 | Providing & fixing or interlocking CC tiles 80 mm thick M‑30 grade over 20 to 40 mm sand layer and joint filled by dry fine sand including all cost of labour T&P etc complete | 503.4 | Sqm | 860 ₹4,32,924 Lowest | 860 ₹4,32,924 Lowest | 860 ₹4,32,924 Lowest |
| 1.09 | RCC work 1:1.5:3 with cement approved coarse sand & 20 mm gauge stone grit etc including centering & shuttering etc all compl of work (SI no.283) | 1.05 | Cum | 8,100 ₹8,505 Lowest | 8,100 ₹8,505 Lowest | 8,100 ₹8,505 Lowest |
Tender Value
₹11.4 L
EMD Value
₹22,800
Closing Date
23 Feb 2026, 3:00 pmClosed
EO NPP Bilaspur
Office Of the Nagar Palika parishad Bilaspur
Ward 12 me hospital road tak ba anya galiyon me CC tiles interlocking Road va nali nirman karya (As per Estimate)
2026_DOLBU_1115508_1
822/nppb/2025-2026/15van-7
Open Tender
Civil Works
Item Rate
120 days
Bilaspur
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,298
Executive Officer
₹22,800
25 Mar 2026
13 Feb 2026
23 Feb 2026
13 Feb 2026
23 Feb 2026
13 Feb 2026
Ward 12 me hospital road tak ba anya galiyon me CC tiles interlocking Road va nali nirman karya (As per Estimate)
Earth work in foundation or embankment in ordinary soil including earth from 5 km to the site. chap‑04 sr no.251
Earth work in filling or embankment in ordinary soil including earth from 5 km to the site. chap‑04 sr no.251
Cement concrete with 4 cm gauge brick ballast with fine sand of 1.25 FM and cement in 1:2:6:1 stone including labour material T&P incl all compl. (SR NO.273)
M‑150 brick work in 1:4 cement and coarse sand mortar including all cost of materials labour and T&P etc required for proper completion of work sr no.305
12 mm thick plaster in 1:4 cement coarse sand and mortar over brick work including all cost of materials labour and T&P etc required for proper completion of work (sr no.581)
Concrete with 2 cm gauge stone ballast coarse sand of 1.25 FM and cement proportion of 1:4:2:1 including supply of all materials labour and T&P etc required for proper completion of work (279)
Concrete with 4 cm gauge stone ballast with fine sand of 2.25 FM and cement in 1:2:6:1 in foundation including supply labour material T&P incl all compl. (SR NO.273)
Providing & fixing or interlocking CC tiles 80 mm thick M‑30 grade over 20 to 40 mm sand layer and joint filled by dry fine sand including all cost of labour T&P etc complete
RCC work 1:1.5:3 with cement approved coarse sand & 20 mm gauge stone grit etc including centering & shuttering etc all compl of work (SI no.283)
Mild steel or iron work in plain work such as RCC or RB work including cutting, bending for proper shape and including supply of steel and its wastage & authorised overlapping etc shall be measured (SI no.504)
Construction of information pillar in brick with black granite stone (3' x 2.5'
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.29 MB
BOQ_2069825.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .