Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹48.5 LAdmitted-Finance | -3.00% | ₹48.5 L | L1 | Admitted-Finance |
| 2 | L2₹49.7 L+₹1.2 L (2.54%)Admitted-Finance | -0.54% | ₹49.7 L+₹1.2 L (2.54%) | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
| 5 | Not Admitted-Fee/PreQual/Technical 301 3RD FLOOR WALFORT OZONE BILASPUR ROAD FAFADIH SQUARE RAIPUR CHHATTISGARH 492009 | RAIPUR | CHHATTISGARH | 492009 | - | - | - | Not Admitted-Fee/PreQual/Technical No EMD or Fee received |
Tender Value
₹50.0 L
EMD Value
₹99,940
Closing Date
16 Aug 2026, 6:00 pmClosed
Executive Officer
Municipal Board Balesar Satta
Construction of CC Road From Devi Mandir Road To Shiv Shakti School Durgawata Via Rambagh
2026_DLB_583706_1
525/01
Open Tender
Civil Works
Percentage
Municipal Board Balesar Satta
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
E.O.Balesar Satta/MDRISL
₹99,940
Yes
18 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
16 Aug 2026
7 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation, trenches etc. including dressing of sides and ramming of bottoms, including getting out the excavated material, refilling after laying pipe/ foundation and
disposal of surplus excavated material at a lead upto 50m suitable site as per direction of Engineer for following depths, below natural ground / Road top level.In all types soils/ saturated soil such as moorum, sand, sandy silt,
clay, black cotton soil, kankar, etc.Depth upto 1.5 m | - | cum | 229.5 | - |
| 2 | Providing, laying and spreading of granular sub-base by providing coarse graded Material (Table 400-2), spreading in uniform layers with motor grader on prepared surface, mixing BY MIX IN PLACE METHOD with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per MoRT&H
specification clause - 401 including all material, labour, machinery, lighting, guarding and maintenance of diversion.Grading - III Material | - | cum | 1,106 | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:4:8 (1 Cement : 4 fine/ coarse sand : 8 graded stone aggregate 40 mm nominal size). | - | cum | 4,575 | - |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20
mm nominal size). | - | cum | 5,910 | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.49 MB
BOQ_1036839.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .