| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹41.2 LAccepted-AOC | ₹41.2 L | L1 | Accepted-AOC Below Rate |
| 2 | L2₹41.6 LRejected-AOC | ₹41.6 L | L2 | Rejected-AOC Above Rate |
| Sl No | Description | Qty | Unit | P Sivanantham L2 | AMMAN ELECTRICAL WORKS L1 |
|---|---|---|---|---|---|
| 1.001.Providing Drainage atThirumal Nager Ist Cross Veerappan House To Jayapandi House H/O Andankovil West Panchyat | |||||
| 2.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 88.49 | Cum | 266 ₹23,538.34 | 264 ₹23,361.36 |
| 3.00 | Cement concrete 1:4:8 mix using 40 mm ISSHBG metal including cost and conveyance of all materials to site and all labour charges etc., complete for Base Course. | 10.41 | Cum | 5,392 ₹56,130.72 | 5,338 ₹55,568.58 |
| 4.00 | Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete for Wearing coat. | 35.92 | Cum | 6,154 ₹2.2 L | 6,092 ₹2.2 L |
| 5.00 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. | 245.71 | Sqm | 553 ₹1.4 L | 547 ₹1.3 L |
| 6.00 | Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers | 1.73 | Sqm | 9,167 ₹15,858.91 | 9,075 ₹15,699.75 |
| 7.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) | 0.15 | Mt | 92,837 ₹13,925.55 | 91,908 ₹13,786.20 |
| 8.00 | Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour | 55.62 | Sqm | 584 ₹32,482.08 | 578 ₹32,148.36 |
| 9.002.Providing Drain at Thirumal Nager IInd Cross Veeraragavan House To Kalimuthu House H/O Andankovil West Panchyat | |||||
| 10.00 | Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete | 186.99 | Cum | 266 ₹49,739.34 | 264 ₹49,365.36 |
Tender Value
₹41.8 L
EMD Value
₹41,810
Closing Date
3 Mar 2026, 3:00 pmClosed
Special Officer/Block Development Officer(V.P)
Block Development Office, Thanthoni
Construction of Drainage 4 Nos works Package No.03
2026_RDTN_668890_3
Thanthoni Block - Andankovil West - CGF -2025-26
Open Tender
Civil Works
90 days
Thanthoni Block
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹41,810
8 Apr 2026
2 Mar 2026
3 Mar 2026
2 Mar 2026
3 Mar 2026
2 Mar 2026
1.Providing Drainage atThirumal Nager Ist Cross Veerappan House To Jayapandi House H/O Andankovil West Panchyat
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1:4:8 mix using 40 mm ISSHBG metal including cost and conveyance of all materials to site and all labour charges etc., complete for Base Course.
Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete for Wearing coat.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
2.Providing Drain at Thirumal Nager IInd Cross Veeraragavan House To Kalimuthu House H/O Andankovil West Panchyat
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1:4:8 mix using 40 mm ISSHBG metal including cost and conveyance of all materials to site and all labour charges etc., complete for Base Course.
Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete for Wearing coat.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
3.Providing Drain Thirumal Nager IIIrd Cross Marappan House To Pitchamuthu House H/O Andankovil West Panchyat
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1:4:8 mix using 40 mm ISSHBG metal including cost and conveyance of all materials to site and all labour charges etc., complete for Base Course.
Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete for Wearing coat.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
4.Providing Drain Thirumal Nager IVth Cross Arumugam House To Periyasamy House H/O Andankovil West Panchyat
Earth work excavation for foundation in all soils and sub soils to full depth etc., ordinary soil complete
Cement concrete 1:4:8 mix using 40 mm ISSHBG metal including cost and conveyance of all materials to site and all labour charges etc., complete for Base Course.
Cement concrete 1:3:6 mix using 20 mm ISS HBG metal including cost and conveyance of all materials to site and all labour charges etc., complete for Wearing coat.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (country wood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement Concrete 1:1-1/2:3 (One Cement, One and a half crushed stone M.Sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three M.Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire)
Plastering with cement mortar 1:4mix to 20 mm thick includingcost and conveyance of all materials to site and all labour
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_803663.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
Techpricebid.pdf
Tender Documents • 0.93 MB
BOQ_803663.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid