| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 CrAccepted-Finance | ₹2.7 Cr | L1 | Accepted-Finance Quoted L1 Rated |
| 2 | Rejected-Technical | - | - | Rejected-Technical Technically not Qualified |
Tender Value
₹2.7 Cr
EMD Value
₹2.7 L
Closing Date
10 Jun 2025, 3:00 pmClosed
Block Development Officer BP
Panchayat Union Manapparai
Strengthening to the Road NH45 to Thathanayakanpatti Via Samuthiram 0/0-5/25 (R-387) Samuthiram Panchayat Manapparai Block in Tiruchirappalli District under NNT 2025-26
2025_RDTN_565512_1
A2/1576/2025 dt 05.06.2025
Open Tender
Civil Works - Roads
Works
60 days
Manapparai
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹2.7 L
13 Jun 2025
5 Jun 2025
10 Jun 2025
5 Jun 2025
10 Jun 2025
5 Jun 2025
Amount
Strengthening the NH 45 Road to Thathanayakkanpatti Road via Samuthiram KM 0/0 - 5/25 (R- 387) ….Clearing the light jungle including al labour charges for cutting, burring, buried etc. complete.
BT Picking including all labour charges
Earth work excavation in all classes of soils except hard rock requiring blasting depositing on bank with initial lead of 10M and lift of 2M including all labour charges and incidental charges such as shoring, strutting, providing coffer dams, bailing out of water as per 20A
Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction KM 0/0 -1/00
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. KM 0/0- 1/0
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WBM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
Providing and laying 50mm consolidated thick bituminous macadam using 0.20cum fo 26.50-13.20mm,0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRCmetal with 37Kgs of bitumen for pre mixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing the min required temperature in central hot mix plant20-30 ton capacity , conveying the mix by tipper trucks top a versite, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by8-10tonne Vibratory/ Pneumatic Roller to the required density etc.,including labour for attending to paver to site etc.,including hire charges and fuel charges for 20-30 to CMP with bitumen boiler, tipper trucks, Paver Finisher/ 9m paver finisher,Vibratory/Pneumatic roller and all other tools and plant required ,including fuel and all other incidental charges etc., complete as per specification
BITUMINOUS CONCRETE 25, 30/40 MM THICK USING cmp (Grade-II) Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Part-5
Citizen Information Board, Name Board, Logo Board
Cautionary Sign Board
60 Cm Equilateral Triangle Cautionary SignBoard
60 Cm Circle Mandatory Sign
Chevron Sign 90 Cm Octogon (Curves)
HM Stone
KM Stone
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .