| 1 | 1₹5.6 LAccepted-Finance OPPOSITE WINSON TEXTILE MILL SAI ROAD BADDI DISTRICT SOLAN H P | ₹5.6 L | 1 | Accepted-Finance L1 |
| 2 | 2₹5.8 L+₹14,835.85 (2.65%)Rejected-Finance | ₹5.8 L+₹14,835.85 (2.65%) | 2 | Rejected-Finance L2 |
| 3 | 3₹5.8 L+₹17,928.61 (3.20%)Rejected-Finance 00 AGRA AGRA UTTAR PRADESH 282001 | AGRA | UTTAR PRADESH | 282001 | ₹5.8 L+₹17,928.61 (3.20%) | 3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Sh. Ravinder Kumar L2 | Pawan Kumar L3 | M/S Bajrang Enterprises L1 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches etc. in earth work in all kinds of soil such as pick work, jumper work, blasting work in soft/hard rock, chiseling wedging out of rock where blasting in prohibited saturated soil including bailing / pumping out of water, stacking the excavated soil in all leads and lifts clear from the edge of excavation and then returning the stacked soil in 15cm layers, when required into plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and then deposing of all surplus excavated earth as directed within all leads and lifts. | 107.97 | Cum | 500 ₹53,985 | 485 ₹52,365.45 | 450 ₹48,586.5 Lowest |
| 2.00 | Providing laying jointing and testing of Ductile iron pipe with double strength joints as per IS: 8329-2000 of wall thickness of 5 mm in a random length of 5.50 mtr class- K7 complete in all respect excluding earth work in trenches with in all leads and lifts and to the entire satisfaction of the Engineer-in-charge. 150mm dia. | 155 | Cum | 2,550 ₹3,95,250 | 2,560 ₹3,96,800 | 2,500 ₹3,87,500 Lowest |
| 3.00 | Providing and laying cement concrete 1:4:8 (1cement: 4sand: 8 graded stone agg. 40mm nominal size) and curing complete excluding the cost of form work in foundation and plinth in all leads and lifts and to the entire satisfaction of the Engineer-in-charge. | 1.95 | Cum | 8,900 ₹17,355 | 8,950 ₹17,452.5 | 8,800 ₹17,160 Lowest |
| 4.00 | Brick work using common burnt clay building bricks in super structure above plinth level upto floor two level 2nd class bricks cement motar 1:4 (1cement: 4sand) in all leads and lifts and to the entire satisfaction of the Engineer-in-charge. | 4.71 | Cum | 10,900 ₹51,339 | 10,980 ₹51,715.8 | 10,800 ₹50,868 Lowest |
| 5.00 | Providing and laying cement concrete 1:2:4 (1cement: 2sand: 4 graded stone agg 20mm nominal size) and curing complete excluding the cost of form work in foundation and plinth ( channel and foundation plinth) | 0.75 | Cum | 9,880 ₹7,410 | 9,870 ₹7,402.5 | 9,820 ₹7,365 Lowest |
| 6.00 | 15 mm thick cement plaster in single coat of fair side of brick/concrete /stone interior plastering upto floor two level including arises internal rounded angles chamfers and / or round angles not exceeding 80mm in girth and finished and smooth in CM 1:3 (1cement: 3sand) and to the entire satisfaction of the Engineer-in-charge with in all leads and lifts | 14.28 | Sqmt | 385 ₹5,497.8 | 382 ₹5,454.96 | 380 ₹5,426.4 Lowest |
| 7.00Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centering shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centering below supporting floor two ceiling not exceeding 4 mtr and removal of the same for in-situ reinforced concrete and plain concrete working:- | ||||||
| 7.01 | Flat surfaces such as soffits of suspended floor landings and the like up to 200mm thickness and to the entire satisfaction of the Engineer-in-charge. | 3.53 | Sqmt | 595 ₹2,100.35 | 600 ₹2,118 | 590 ₹2,082.7 Lowest |
| 7.02 | Edges of slabs and breaks in floor and walls (under 20cmt wide) in all leads and lifts and to the enitre satisfaction of the Engineer-in-charge. | 24.16 | Rmt | 195 ₹4,711.2 | 200 ₹4,832 | 190 ₹4,590.4 Lowest |
| 8.00Providing and laying cement concrete 1:1.5:3 (1cement: 1.5 sand:3 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in :- | ||||||
Tender Value
₹4.8 L
EMD Value
₹9,550
Closing Date
17 Aug 2026, 11:00 amClosed
Executive Engineer
Jal Shakti Division Bilaspur
Providing sewerage facility to New Bilaspur town in Tehsil Sadar District Bilaspur (SH Providing laying jointing and testing of DI pipe line 150mm dia (K-7) and construction of 4 Nos manhole chamber near Kala Baba Kutia, Hanuman Temple under DMFT).
2026_HPIPH_140603_3
BLP-BLP-0736-NIT No.7216-7317 Dated 04/08/2026
Open Tender
Civil Works
Item Rate
90 days
Sub Division Bilaspur Section NBT
Please refer Tender documents.
4 documents required · 4 mandatory
₹350
₹9,550
30 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
17 Aug 2026
7 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation trenches etc. in earth work in all kinds of soil such as pick work, jumper work, blasting work in soft/hard rock, chiseling wedging out of rock where blasting in prohibited saturated soil including bailing / pumping out of water, stacking the excavated soil in all leads and lifts clear from the edge of excavation and then returning the stacked soil in 15cm layers, when required into plinth sides of foundation etc. consolidating each deposited layer by ramming and watering and then deposing of all surplus excavated earth as directed within all leads and lifts. | 107.97 | Cum | 108 | ₹11,660.76 |
| 2 | Providing laying jointing and testing of Ductile iron pipe with double strength joints as per IS: 8329-2000 of wall thickness of 5 mm in a random length of 5.50 mtr class- K7 complete in all respect excluding earth work in trenches with in all leads and lifts and to the entire satisfaction of the Engineer-in-charge. 150mm dia. | 155 | Cum | 108 | ₹16,740 |
| 3 | Providing and laying cement concrete 1:4:8 (1cement: 4sand: 8 graded stone agg. 40mm nominal size) and curing complete excluding the cost of form work in foundation and plinth in all leads and lifts and to the entire satisfaction of the Engineer-in-charge. | 1.95 | Cum | 108 | ₹210.6 |
| 4 | Brick work using common burnt clay building bricks in super structure above plinth level upto floor two level 2nd class bricks cement motar 1:4 (1cement: 4sand) in all leads and lifts and to the entire satisfaction of the Engineer-in-charge. | 4.71 | Cum | 108 | ₹508.68 |
| 5 | Providing and laying cement concrete 1:2:4 (1cement: 2sand: 4 graded stone agg 20mm nominal size) and curing complete excluding the cost of form work in foundation and plinth ( channel and foundation plinth) | 0.75 | Cum | 108 | ₹81 |
| 6 | 15 mm thick cement plaster in single coat of fair side of brick/concrete /stone interior plastering upto floor two level including arises internal rounded angles chamfers and / or round angles not exceeding 80mm in girth and finished and smooth in CM 1:3 (1cement: 3sand) and to the entire satisfaction of the Engineer-in-charge with in all leads and lifts | 14.28 | Sqmt | 108 | ₹1,542.24 |
| 7Providing form work with steel plates 3.15mm thick welded with angle iron in frame 30x30x5mm so as to give a fair finish including centering shuttering, strutting and propping etc. with wooden battens and ballies, height of propping and centering below supporting floor two ceiling not exceeding 4 mtr and removal of the same for in-situ reinforced concrete and plain concrete working:- | |||||
| 7.01 | Flat surfaces such as soffits of suspended floor landings and the like up to 200mm thickness and to the entire satisfaction of the Engineer-in-charge. | 3.53 | Sqmt | 108 | ₹381.24 |
| 7.02 | Edges of slabs and breaks in floor and walls (under 20cmt wide) in all leads and lifts and to the enitre satisfaction of the Engineer-in-charge. | 24.16 | Rmt | 108 | ₹2,609.28 |
| 8Providing and laying cement concrete 1:1.5:3 (1cement: 1.5 sand:3 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced concrete work in :- | |||||
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
PWD6.pdf
Tender Documents • 0.40 MB
PWD8.pdf
Tender Documents • 1.32 MB
TC.pdf
Tender Documents • 0.17 MB
BOQ_208569.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .