Tender for Work of Providing Maintenance free treated earth Electrodes at various substation under KIM AM Division under Bharuch TR Circle.
337775
TCBRH/26-27/E-146
Open
Electrical - All
Works
Bharuch
15 documents required · 14 mandatory · 1 optional
₹1,180
GETCO
₹22,391
21 Aug 2026
21 Aug 2026
21 Aug 2026
11 Sept 2026
21 Aug 2026
Name of Work: Tender for Work of Providing Maintenance free treated
earth Electrodes at various substation under KIM AM Division under
Bharuch TR Circle.
Note : Submit all the self-attested Documents Online in n-Procure
(No any Physical Documents)
Payment of Tender Fee as well as EMD Shall be accepted through
RTGS/NEFT/online Only.
Seal & Signature of Bidder -1-
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
TENDER NOTICE No: TCBRH/26-27/E-146
Superintending Engineer (TR), Bharuch invites “On line Tenders” (e-tendering) for the works of
following items. All the bidders, in respect of tender item must have vendor registration with the GETCO
viz. prior to the date of opening of technical bid of the tender otherwise their bids will not be considered
eligible for technical scrutiny and as such, their technical bids will not be opened.
Tender Papers & Specifications may be down loaded from Web site https://tender.nprocure.com (For
view, down load and on line submission) and GUVNL/GETCO web site tender.guvnl.com/www.gseb.com
& www. getcogujarat.com (For View & down load only).
All tender documents are to be upload (Notarized / self-attested copies of original – as specified in tender
document) through online only (mandatory) on (n) procure portal including Tender fee & EMD .
Communication by Registered Post A.D. or Speed Post addressed to: The Superintending Engineer (TR),
Gujarat Energy Transmission Corporation Limited, Circle Office, Maktampur Road, Bharuch-392012.
Sr. Description
1 Tender No.: TCBRH/26-27/E-146
Tender for Work of Providing Maintenance
free treated earth Electrodes at various
substation under KIM AM Division under
Bharuch TR Circle.
3 Tender Fee (nonrefundable) Incl. GST in Rs.
4 Estimated cost with GST in Rs. Rs
5 Earnest Money Deposit amount in Rs. Rs.
On line (E-tendering) tender/ offer submission
6 last date up to 16.00 hours only (This is As per Schedule
Date of opening of Tender fee, EMD cover,
8 Vendor registration and technical bid on – line As per Schedule [Tentative]
opening at 16.00 Hours.
Tentative Date of on – line opening of Price bid,
9 Shall be intimated separately
(if possible), at 11.00 Hours
11 Validity of offer 60 days
12 Time limit 180 Days
13 Appropriate / Registration Class Only GETCO registered contractor
Note : Payment of Tender Fee as well as EMD Shall be accepted through RTGS/NEFT /Online Only.No
any physical submission require.
Seal & Signature of Bidder -2-
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
1. All the relevant documents as per requirement of the tender to be submitted online i.e. Technical bid,
Qualification requirement data, detail specification Tender Fee plus GST as applicable and EMD. Otherwise
the offer will not be considered and no any further communication in the matter will be entertained.
2. It is mandatory for all the bidders to submit their all require tender documents, Tender Fees and EMD by on-
line (e-tendering) .
3. The bidders are required to fill up all the online appendices (annexure)/forms. This is intended for transparency
and speedy evaluation of the bids. Instead of simply confirming, the bidder shall fill in the particulars against
appropriate place in respect of each line appearing in each online annexure.
(In the absence of required details in the online annexure, the corporation has every right to evaluate the bids
accordingly and bidder cannot raise any objection against any point during evaluation.)
4. Bidders are requested to remain in touch with the web site for any amendment/corrigendum or extension of due
5. In case short submission of documents with bid and / or clarification if any required from the bidder the
required details / documents may be asked from bidder in physical form.
6. Tender Fee and EMD in form of DD/Banker’s Cheque/Pay Order/ Bank Guarantee are not allowed. If bidder
submit the DD/ Banker’s Cheque/Pay Order/ Bank Guarantee for Tender Fee and EMD, in that case the same
tender will be not considered.
7. The Earnest Money Deposit and tender fee plus GST as applicable will be accepted only by
RTGS/NEFT/online only in favour of “GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
Bharuch” As per given bank detail. Tender without EMD and tender fees shall be rejected.
8. Payment through RTGS/NEFT bidder has to mail following details:
Sr. No Required Details
1 Name & Address of the bidder
2 Bidder GST No (Active, otherwise disqualify the
3 Tender No with due date
4 Mode of Transfer
5 Ref. ID with Bank Details
7 Payment against (Tender Fee/ EMD)
Bidder has to provide all above details on the same date of payment so that receipt can be generated.
GETCO Beneficiary Bank detail is as under:
1 Name of Account Holder Gujarat Energy Transmission Corporation Ltd.
3 Name of Bank BANK OF BARODA
4 Branch Code STABRO
5 Address of Bank Shalimar Complex, Station Road,Bharuch-392002.Gujarat
Seal & Signature of Bidder -3-
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
6 IFSC Code BARB0STABRO
7 PAN No AABCG4029R
8 TAN No BRDG01026E
9 GST No 24AABCG4029R2ZC
9. Bidder has to upload scanned copies of original (Notarized / self-attested copies of original –as specified
in tender document) documents with bid and no physical documents to be submitted by bidder. All the
online Annexures and price bid, other tender documents must be submitted/attached online only.
10. The GETCO reserves the right to award the work to one or more bidders, considering their technical and
financial capacity OR to reject any or all tenders or accept any tender without assigning any reason
Any technical questions, information and clarifications that may be required pertaining to this enquiry
should be referred to The Superintending Engineer (TR), Gujarat Energy Transmission Corporation
Limited, Circle office, Bharuch.
GETCO reserves the right to reject any OR all tenders without assigning any reasons thereof.
Yours faithfully,
Superintending Engineer (TR),
GETCO, C.O., Bharuch
Download Tender Documents in (PDF Format) which consists of:
Part – I: Commercial Terms & Conditions
Part – II: Technical Specifications & GTP’S, Schedule “A” indicating the quantities & items, drawing if any.
To view the PDF file please use “Acrobat Reader” software which can be downloaded from “Adobe” website.
Note: In case bidder needs any difficulty in accessing / submission of on line bid / clarification or if training required for
participating in online tender, they can contact the following office:(n) Procure Cell, (n) code solutions-A division of GNFC Ltd.,
403, GNFC Infotower, S.G. Road, Bodakdev Ahmedabad – 380054 ( Gujarat ) Toll Free: 1-800-233-1010 ( Ext. 501, 512,516 , 517
525 ) , Phone No. 079-26857315 / 316 / 317, Fax: 079-26857321 / 40007533, Email: [email protected].
Seal & Signature of Bidder -4-
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
Seal & Signature of Bidder -5-
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
CONFIRMATION OF DETAILS OF BIDDER
Bidders are required to furnish following information specifying YES / NO
1) Whether the Bid is on percentage basis as called for. Yes / No
2) Whether rebate furnished is in percentage basis as called for. Yes / No
3) Whether the Bid is submitted by RPAD / Speed Post. Yes / No
4) Whether all pages of Bid Specifications are sealed and signed by the Bidder. Yes / No
5) a) Whether the Bidder is registered with GETCO for Transmission line Yes / No
b) In case of “Yes”, please furnish following details
i) Registration Letter No. & date.
ii) Class of Registration
c) Whether Bidder is having PF Code No. Yes / No
6) a) Whether EMD paid. ( DD / BG ) Yes / No
b) In case “Yes”, furnish details Yes / No
7) Whether following documents as specified are submitted.
a) Human Resources detail. Yes / No
b) Availability of tools, equipments etc. Yes / No
c) Details of orders executed / on hand Yes / No
d) Financial capability. Yes / No
e) Experience as specified. Yes / No
f) Latest Income-tax certificate Yes / No
g) Company's Articles Of Association Yes / No
h) Details Of Partners / Directors Yes / No
i) B.R./P.A. Authorizing Person Yes / No
j) Power of Attorney of Consortium Members Yes / No
Signature of Authorized Representative of
Seal & Signature of Bidder -6-
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
Name of tendering Company
Tender No. TCBRH/26-27/E-146
Sub: Tender for Work of Providing Maintenance free treated earth Electrodes at various substation
under KIM AM Division under Bharuch TR Circle
In connection with above subject, I/we confirm the following:
1) I/we, the undersigned, have read and examined the above tender documents in detail.
2) I / we declare that our bid is strictly in line with Tender Specification and there is no deviation.
Further, I / we also agree that additional conditions / deviations, if any, found in bid, the offer
shall be out rightly rejected without assigning any reason thereof.
Signature of Authorized Representative of
Company / Agency
Name of tendering Company
Seal & Signature of Bidder -7-
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
DETAILS OF THE FIRM
NAME OF THE FIRM:
1 Address of Registered Office
2 Contact Personal
4 Residential Address
5 Phone Nos. (Office and
7 Telegraphic code
1 Address of works
2 Contact Personal
4 Residential Address
5 Phone Nos. (Office and
7 Telegraphic code
8 Email Address
Seal & Signature of Bidder -8-
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
DETAILS OF THE EXPERIENCE FOR ERECTION WORK IN LAST THREE YEARS FROM THE DUE
DATE OF TENDER:
Sr Name of Order Order Length Date of Order fully Status if order
No Transmissi reference value of line completion executed under execution
on line no. & Date Yes/No
A Gujarat Energy Transmission Corporation Ltd., GETCO:
B OTHER STATE ELECTRICITY BOARD:
C PRIVATE FIRMS:
List of work completion certificate submitted with technical bid
Sr Name of Work Name of Authority by Reference no. & Date
no whom work completion
certificate issued
Seal & Signature of Bidder -9-
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
ANNEXURE – XIII
UNDERTAKING IN REGARD TO STOP DEAL/BANNED FOR BUSINESS DEALING /
BLACKLIST THERE OF)
Sub: Undertaking in regards to STOP Deal/Banned for Business dealing/Black list there of
(All bidders will have to furnish the following undertaking duly filled in, signed and stamped for each
quoted item of the tender along with technical bid.)
_____________________________Authorized signatory of
____ and thereby certified that M/s.
and their proprietor/any partner/any director of the firm is not stop deal and /or banned for business
dealing and /or black listed by GUVNL/or their any subsidiary company viz. GSECL
/GETCO/MGVCL/PGVCL/DGVCL.
Signature of tenderer
Seal & Signature of Bidder - 10 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
Confirmation Regarding Site Verification
The Superintending Engineer (TR)
Tr. Circle Office,
Maktampur-392012
Sub: Confirmation Regarding Site Verification.
Ref: Tender No.--_________________
In context to above reference tender, I hereby confirmed that I have visited the site/sites as mentioned in tender.
And after keeping familiar myself completely about site & situation I am applying in tender and accepting all
terms and condition mentioned in tender in to.
Yours faithfully
Authorized signatory Name & signature
Seal of the Firm Signature of the Tenderer
Seal & Signature of Bidder - 11 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
QUALIFYING CRITERIA TABLE:
Sr. Qualifying Requirements
1. Registration :The bidder shall be strictly a GETCO register contractor of any class
2. Technical Criteria:
i) The bidder shall have executed 1 nos of 66/11kV Substation with state or central
Transmission Utility or major industries
03 nos. of 66kV bays i.e. transformer / feeder bays at same or different locations. Substations
include minimum two nos. of feeder bays, one no. of transformer bay
Mesh type earthing work at minimum 1(one) NO. 66KV or above class substation at same or
different locations.. (Bidder should submit work order copy and satisfactory completion
ii) The Bidder shall have valid Electrical contract license and approved Vendor of
GETCO/STU/CTU, registered under GST Act and should have CPF/PF Registration Certificate
3. Financial Criteria:
The bidder shall submit the Bank solvency of the amount which is 20% of the total estimated
cost of tender.
Financial Qualification requirement:
1. GST Tax Registration No. date / issuing authority must be online active.
2. Details of Partners/Directors of the Firm/Company. Partnership deed if applicable.
3. Copy of power of attorney as the case may be.
4. PF registration along with proof of last challan etc.
5. The Bidder should have to submit copy of PAN card.
6. Financial capability (IT returns of Last three years)
7. Payment of Tender fee and EMD RTGS/NEFT only.
8. Latest Bank Solvency of the amount which is 20% of the total estimated cost of the tender of schedule
9. Experience Certificate of similar work carried out with WCC.
10. Registration class approved GETCO: -
11. List of tools and tackles.
12. Electrical license copy.
13. Any other documents required for particular and specific work.
The bidders must attach submit all above documents scanned copy on n- procure.
Note: Above technical criteria is for technical scrutiny after opening the technical bid. However, the GETCO
reserves the right to award the work to one or more bidders, considering their technical and financial capacity
OR to reject any or all tenders or accept any tender without assigning any reason thereof.
NOTE:- Along with above QUALIFICATION requirement, bidder should submit,
1. Filled Annexture-14 in company’s letter pad. Attached Annexure I, II, III, Site verification submit
2. EMD refund application on company’s letter pad with stamp and sign as per given in tender
Seal & Signature of Bidder - 12 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
3. All documents should be submitted duly self-attested by the bidder in online through n-Procure
GENERAL INSTRUCTIONS TO THE BIDDERS
1. Payment of Tender Fee: (Non-Refundable)
Payment of Tender Fees will be accepted online i.e. by RTGS/NEFT/Online only.
Tender Fee in form of DD/Banker’s Cheque/Pay Order is not allowed. If bidder submit the DD/
Banker’s Cheque/Pay Order for Tender Fee and EMD, in that case the same tender will not be
2. Payment of Earnest Money Deposit (EMD):
Payment of Earnest Money Deposit (EMD) will be accepted online i.e. by RTGS/NEFT/Online
Earnest Money Deposit (EMD) in form of DD/Banker’s Cheque/Pay Order/ Bank Guarantee are
not allowed. If bidder submit the DD/Banker’s Cheque/Pay Order/ Bank Guarantee for Tender
Fee and EMD, in that case the same tender will not be considered.
3. Documents with Bid submission:
Bidder has to upload scanned copies of original (Notarized/ Self attested copies of original – as
specified in tender document) documents with bid and no physical documents to be called from
In case of short submission of documents with bid and/ or clarification if any required from the
bidder, the required details/ documents may be asked from bidder in physical for n-procure
invited tenders.
It shall be sole responsibility of the bidder that the uploaded scanned documents(in PDF form)
remain legible (readable) and should not be password protected.
All online bid Annexures & Tender Evaluation Checklist (QR) should be clearly filled. For any
differences or wrong entry bidder shall be sole responsible for that documents.
The bidders are required to fill up all the online appendices (annexure)/forms. This is intended for
transparency and speedy evaluation of the bids. Instead of simply confirming, the bidder shall fill
in the particulars against appropriate place in respect of each line appearing in each online
In the absence of required details in the online annexure, the corporation has every right to
evaluate the bids accordingly and bidder cannot raise any objection against any point during
All others Terms & Conditions of the original tender will remain unchanged.
It is, therefore, requested to follow above amendment guidelines scrupulously for all tenders
invited through online, please.
By bidding online, the bidder is deemed to have read, understood and accepted all the terms and
conditions mentioned in the tender.
Seal & Signature of Bidder - 13 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
1. The Scope of the proposal shall be on the basis of a single Bidder’s responsibility, completely covering all
the services specified under the accompanying Technical Specifications.
2. The Bidder shall complete all the schedules & annexure in the Bid Proposal Sheets, technical Data Sheets
and specified elsewhere.
3. The Scope of the proposal shall be on the basis of a single Bidder’s responsibility for a particular line
completely covering “Tender for Work of Providing Maintenance free treated earth Electrodes at
various substation under KIM AM Division under Bharuch TR Circle.”. as per standard specification
and standard practice of GETCO and as per EIC
4. The above work shall be done as per GETCO’s approved drawing/layout.
5. Necessary field quality plan of GETCO shall be implemented and necessary documentation shall also be
maintained as per GETCO’s norms and instruction of EIC. If required field quality plan shall be available
at field offices.
6. During the work of erection of feeder bay/transformer bay safety check list shall be followed. Necessary
check list will be available at our field office.
7. Successful bidder has to appoint site Engineer to maintained site register & FQP as per ISO.
8. All work should be done accordingly to ISO & FQP and all require documents including Filled FQP,
testing results etc. should be submitted while handing over the completed work.
9. The quantity mentioned in price bid is tentative and may vary in actual work order.
10. Execution of the Work as per mention below issuing commencement letter from Executive Engineer
(Am), KIM Divison for work as per mention below.
Sr No Division Name of Substation Work to be executed
1 KIM 66kV Mandvi S/s Maintenance free Earthing & Earthing Strip connection.
2 KIM 66kV Zankhava S/s Maintenance free Earthing & Earthing Strip connection.
3 KIM 66kV Umarkhadi S/s Maintenance free Earthing & Earthing Strip connection.
4 KIM 66kV Mosali S/s Maintenance free Earthing & Earthing Strip connection.
5 KIM 66kV Areth S/s Maintenance free Earthing & Earthing Strip connection.
6 KIM 66kV Vankal S/s Maintenance free Earthing & Earthing Strip connection.
7 KIM 66kV Karanj S/s Maintenance free Earthing & Earthing Strip connection.
8 KIM 66kV Palod S/s Maintenance free Earthing & Earthing Strip connection.
9 KIM 66kV Sivan S/s Maintenance free Earthing & Earthing Strip connection.
10 KIM 66kV Pipodara-1 S/s Maintenance free Earthing & Earthing Strip connection.
11 KIM 66kV Pipodara-II S/s Maintenance free Earthing & Earthing Strip connection.
12 KIM 66kV Vadoli S/s Maintenance free Earthing & Earthing Strip connection.
Seal & Signature of Bidder - 14 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
13 KIM 66kV Motaborasra S/s Maintenance free Earthing & Earthing Strip connection.
14 KIM 66kV Gala Karjan S/s Maintenance free Earthing & Earthing Strip connection.
15 KIM 66kV FTP S/s Maintenance free Earthing & Earthing Strip connection.
1. The Contractor shall follow and comply with all GETCO Safety Rules, relevant provisions of applicable laws
pertaining to the safety of workmen, employees, plant and equipment as may be prescribed from time to time
without any demur, protest or contest or reservations. In case of any discrepancy between statutory
requirement and GETCO Safety Rules referred above, the latter shall be binding on the Contractor unless the
statutory provisions are more stringent.
1. In case if any safety related fatal Elect. / Mech. accident occurred to any employee of agency or outsider
due to negligence or non-compliance of GETCO safety norms then in addition to the compensation and
liability as per statutory requirement, contractor / agency shall be penalized as under:
Sr. No Amount of Contract in Rs. Penalty amount per person
Rs.5000/- plus any taxes as
Rs.25000/- plus any taxes as
2 Above1 Lac to 10 Lacs
Rs.100,000/- plus any taxes as
3 10 to 100 Lacs
4 > 100 Lacs 1.0 % plus GST as applicable
1. The contractor shall inform concerned Ex. Engineer Const/TR in writing within 24 hours of fatal/Non-fatal
accident occurred to human being.
2. The GETCO investigating officer findings in to accident shall be final and binding to the contractor
3. Safety Requirement:
i) Kick off Meeting exclusively for safety shall be done in each contract in presence of contractor’s site in
charge and supervisor. Safety document shall be handed over and vital safety norms and key points of
safety related to project shall be explained and recorded for commitment by erection contractor. Such
records are mandatory for clearing first erection bill.
ii) During site visit by GETCO official of Executive Engineer and above rank, the following checks during
execution of work shall be covered.
I. Safety equipment available and utilize.
(b) Safety belt.
(c) Safety shoes.
(d) Live line Voltage detector
II. Safety procedure adopted.
Seal & Signature of Bidder - 15 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
(a) Permit to work
(b) Earthing at the place of work.
(c) Adequate supervision.
III. T & P physical Check. (Healthiness and Quality)
(b) Wire rope and sling.
(c) Earthing rod
IV. If above-mentioned safety requirements found violated in any of the above three conditions shall
attract penalty of Rs.1000/- plus GST as applicable per occasion. (Max.Rs.3000/--for violation of
three conditions)
V. During subsequent visit, if violation is found, then double penalty plus GST as applicable shall be
deducted from the bill of the Contractor/Agency.
4. The contractor will have to give indemnity bond & safety cum indemnity on stamp paper of Rs. 300/- to
GETCO against any possible claim of compensation for damage to contractor’s equipment or staff or any of
third parties during the execution of work.
WORK & SAFETY REGULATIONS
1. The contractor shall ensure proper safety of all the workmen, materials, equipment & plant & belonging
to him or to GETCO or to others, working at the site. The contractor shall also be responsible for
provision of all safety notices and safety equipment required both by the relevant legislations and
Engineer, as he may deem necessary.
2. Contractor has to provide ISI marked ELCB / MCB having sufficient capacity of standard make at point of
3. All equipment used in construction and erection by contractor shall meet Indian/International
Standards and where such standards do not exist, the contractor shall ensure these to be absolutely safe.
All equipment shall be strictly operated and maintained by the contractor in accordance with
manufacturer’s operation manual and safety instructions and as per guidelines/ rules of GETCO in this
4. Periodical examinations and all tests for all lifting/ hoisting equipment & tackles shall be carried – out in
accordance with the relevant provisions of Factories Act 1948, Indian Electricity Act 1910 and
associated Laws/Rules in force from time to time. A register of such examinations and tests shall be
properly maintained by the contractor and will be promptly produces as and when desired by Engineer
or by the person authorized.
5. The contractor shall provide suitable safety equipment of prescribed standard to all employees and
workmen according to the need.
6. The contractor shall provide safe working conditions to all workmen and employees at the site including
safe means of access, railings, stairs, ladders, scaffoldings etc. the scaffoldings shall be erected under the
control and supervision of an experienced and competent person. The contractor only shall use good
and standard quality of material.
7. The contractor shall not interfere or disturb electric fuses, wiring and other electrical equipment
belonging to the owner / other contractors under any circumstances, whatsoever, unless expressly
permitted in writing to handle such fuses, wiring or electrical equipment.
8. Before the contractor connects any electrical appliances to any plug or socket belonging to the other
contractor or owner, he shall:
a. Satisfy the Engineer that the appliance is in good working condition;
b. Inform the Engineer of the max. current rating & voltage of the appliances;
c. Obtain permission of the Engineer detailing the sockets to which the appliances may be
Seal & Signature of Bidder - 16 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
9. The Engineer will not grant permission to connect until he is satisfied that;
a. The appliance is in good condition and is fitted with suitable plug
b. The appliance is fitted with a suitable cable having two earth conductors, ones of which shall be
an earthed metal sheath surrounding the cores.
10. No electric cable in use by the contractor/ Owner will be disturbed without prior permission. No weight
of any description will be imposed on any cable and no ladder or similar equipment will rest against or
attached to it.
11. No repair work shall be carried out on any live equipment. The equipment must be declared safe by the
Engineer and a permit to work shall be issued by the Engineer before any repair work is carried out by
the contractor. While working on electric lines/ equipment, whether live or dead, suitable type and
sufficiently quantity of tools will have to he provided by the contractor to electricians/ workmen/
12. In case any accident occurs during the construction/ erection or other associated activities undertaken
by the contractor thereby causing any minor or major fatal injury to his employees due to any reason,
whatsoever, it shall be the responsibility of the contractor provide medical facility / treatment & to
promptly inform the same to the Engineer in prescribed form and to also to all the authorities envisaged
under the applicable laws.
13. The Engineer shall have the right at his sole discretion to stop the work, if in his opinion the work is
being carried out in such a way that it may cause accidents and endanger the safety of the persons
and/or property and/or equipment. In such cases, the contractor shall be informed in writing about the
nature of hazards and possible injury/ accident and he shall comply to remove shortcomings promptly.
The contractor after stopping the specific work can, if felt necessary, appeal against the order of
stoppage of work to the Engineer within 3 days of such stoppage of work and decision of the Engineer in
this respect shall be conclusive and binding on the contractor.
14. The contractor shall not be entitled for any damages/ compensation for stoppage of work due to safety
reasons and the period of such stoppage of work will not be taken as an extension of time for completion
of work and will not be the ground for waiver of levy of liquidated damages.
15. it is mandatory for the contractor to observe during the execution of the works, requirements of safety
rules which would generally include but not limited to following;
a. Each employee shall be provided with initial indoctrination regarding safety by the contractor,
so as to enable him to conduct his work in a safe manner.
b. No employee shall be given a new assignment of work unfamiliar to him without proper
introduction as to the hazards incident thereto, both himself & his fellow employees.
c. Employee must not leave naked fires unattended, smoking shall not be permitted around fire
prone areas and adequate fire fighting equipment shall be provided at crucial location.
d. There shall be a suitable arrangement at every work site for rendering prompt and sufficient
first aid to the injured.
e. Requirements of ventilation in underwater working to licensed and experienced divers, use of
gumboots for working in slushy or in inundated conditions are essential requirements to be
16. The contractor shall follow and comply with all GETCO safety Rules, relevant provisions of applicable
laws pertaining to the safety of workmen, employees, plant and equipment as may be prescribed from
time to time without any demur, protest or contest or reservations. In case of any discrepancy between
statutory requirement and GETCO safety rules referred above the latter shall be binding on the
contractor unless the statutory provisions are more stringent.
a. Fatal injury or accident Rs. 1,00,000/- per These are applicable
Causing death person plus GST as applicable for death
Seal & Signature of Bidder - 17 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
b. Major injuries or accident causing Rs. 20,000/- injury to any
25% or more permanent disablement per person person,
To workmen or employees plus GST as applicable
Permanent disablement shall have same meaning as indicated in workmen’s compensation Act. The
compensation mentioned above shall be in addition to the compensation payable to the workmen/
employees under the relevant provisions of the laws as applicable from time to time. In case the owner
is made to pay such compensation then the contractor is liable to reimburse the owner such amount in
addition to the compensation indicated above.
OUR ENDEVOUR - Safety a habit
To create environment where Business Confidence is built through Best Business Practices and is
fostered in an atmosphere of trust and respect between providers of goods and services and their users
for the ultimate benefit of society a the nation, safety guidelines are agreed upon by the agency as under.
Safety is our prime concern and zero accident is our goal. In order to prevent the accident, while execution
of works in indoor and outdoor systems of GETCO, the following guideline and preventive measures are
Indoor safety precaution Outdoor safety precaution
The method of work required T&P and Man power should The method of work required T&P and Man power
be discussed between GETCO supervisor, contractor’s should be discussed between GETCO supervisor,
supervisor and gang leaders. contractor’s supervisor and gang leaders.
Prior to execution of work a joint survey Must be conducted Prior to execution of work a joint survey
by GETCO supervisor and contractor’s supervisor for risk mustbeconductedbyGETCOsupervisor,contractor’ssup
assessment. ervisorandDISCOMlinemaninordertoidentifythefollowin
• Clearly identify the work location, to
distinguish between the equipment that is
a. HT/LT line or tap line crossing under
dead and other equipment/part that may be Each span of line of the work.
live. b. Isolation point of each line crossing.
• Disconnect equipment from supply. c. Each line crossing & isolation point under each
span must be discussed and noted in
• Protect against other live parts. maintenance register with sketch.
• Take special precautions when close to bare
conductors/ Busbar.
Seal & Signature of Bidder - 18 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
Following safety guidelines are mandatory Contractor’s supervisor and GETCO Supervisor
For all contractors operating in GETCO premises for must ensure all isolations physically with adequate
Electrical, non-electrical & civil works. earthing technically prior to give clearance to gang
1. The contractors must provide advance
leader for taking up job.
planning of work to concerned in-charge of
substation in writing.
2. Before starting any work whether While execution of stringing work, the identified line
switchyard, “permit to allow to work” must crossing must be isolated /de-energized and written
be taken from control room in-charge. clearance should be obtained from concerned DISCOM
3. Utilizing Electrical / non-electrical supervisor.
equipments, safety rules must be
implemented. The isolation of Tap line must be physically seen and
4. If the work is to be carried out on Sunday or verified by Contractor and GETCO supervisor.
public holiday, the necessary permission
must be taken in advance, requesting in At D.O. fuse junction contractors person should be
writing. posted to ensure that no person restore D.O. supply
5. Unwanted person including children of while work is under execution
labours will not be allowed at working site/ in
the switchyard and in the prohibited area.
Contractor’s supervisor must ensure that concern
6. Any electrical work or electrical connections
officer take LCP for EHV line and power line crossing.
to equipment for any other work must be
carried out by certified
electrician/wiremen with adequate size of
wire through MCB as per I.E. Rule.
- Live penal area / bus bar must be isolated and
sealed / bifurcated with red colour tape for visible
- Display Board must hang on LCP panel.
- Transformer must be switched off
whenever and wherever contractor and line workers are
not satisfied with isolation, earthing or any equipment
performance of GETCO, it will be pointed out and work
shall begin only after resolution. Contractor shall not take
up job in absence of GETCO authorized person. All wire
temporary connection & material whenever erection activity
has any connection and disconnection work of bus bar,
All workers / labour of contractor & supervisors must use All workers / labour of contractor & supervisors must
personal protective equipment (PPE) during the work like use personal protective equipment (PPE) during the
gloves, safety belt, Safety shoes, Helmet, earthing rods, work like gloves, safety belt, Safety shoes, Helmet,
etc, duly approved by GETCO. earthing rods, Live line detector etc, duly approved by
The local earthing must be done at the place of work The local earthing must be done at the place of work
before execution of any work. before execution of any work.
11kVbreakerinpanel must be switched off and racked out Circuit breaker opening is not an isolation and isolator
only after ensuring no voltage in breaker and without door on either side must be opened. No work during rains
opening. and cloudy weather condition.
Seal & Signature of Bidder - 19 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
Transmission line activities.
1) Used of Voltage
detector to ensure
2) Earthing at three point, local, left &
right side of bus bar / string bus.
3) Match line colour code with colour of wristband.
Local earthing of electrical equipments like filter M/c,
welding machine, testing kits etc. is must.
Crane shall only be used for material handling and
erection. Working platform shall only be used for work
GENERAL COMMERCIAL CONDITIONS
The Gujarat Energy Transmission Corporation Ltd., Bharuch hereinafter called ‘GETCO’/ ‘OWNER’ intends to
receive bids for “Work of Providing Maintenance free treated earth Electrodes at various substation under KIM
AM Division under Bharuch TR Circle..Detailed in the accompanying specifications in accordance with Terms
and Conditions herein. The bids shall be prepared and furnished as per these instructions.
1. The validity of tender is 180 days from the date of opening of technical bid
2. Earnest Money Deposit :
A. Payment of Earnest Money Deposit (EMD) can be accepted by RTGS/NEFT/Online only.
B. Earnest Money Deposit (EMD) in form of DD/Banker’s Cheque/Pay Order/ Bank Guarantee are not
allowed. If bidder submit the DD/Banker’s Cheque/Pay Order/ Bank Guarantee for Tender Fee and
EMD, in that case the same tender will not be considered.
C. The EMD shall be submitted along with submission of Technical bid only.
D. Tenders no accompanied by EMD shall be rejected.
E. If during the tender validity period, i.e. 180 days, the tenderer withdraws his tender, the EMD shall
be forfeited and the tenderer may be disqualified from tendering for future works of GETCO.
F. The EMD will be returned promptly to the unsuccessful tenderer. The EMD will be returned to the
successful tenderer after he furnishes the Security Deposit for performance and duly enters into the
contract. If he fails to furnish the SD or to execute the contract for the work offered to him, his EMD
shall be forfeited and the tenderer may be disqualified from tendering for further works for GETCO.
3. All commercial terms and conditions except rates shall be indicated in the technical & commercial bid only.
4. The tenderers shall specifically note that the Tenders are invited on percentage basis only.
5. The tenderers will ensure submission of the Tenders duly filled in before the due date and time.
6. Security deposit: -
The contractor will have to pay the Security Deposit at 5% of the order value by demand draft / in the
name of ‘GUJARAT ENERGY TRANSMISSION CORPORATION LTD/ PAYABLE AT Bharuch, A/c. name of
bidder’ upon placement of the LOI within 10 days. Alternatively you may pay the entire S.D. in the form
of B.G. in case S.D value is more than Rs. one lakh as per approved format of the GETCO issued by
Seal & Signature of Bidder - 20 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
Nationalized/Scheduled Bank. The security deposit will be refunded only after the completion of
guarantee period of 1 year of work done or finalization of final bill whichever is later.
(A) Guarantees issued by following banks will be accepted as SD/EMD on permanent basis:
i. All Nationalized Banks.
(B) Guarantees issued by following Banks will be accepted as SD / EMD for the period up to 31.03.27. The validity
cut-off date in GR is with respect to date of issue of Bank Guarantee irrespective of date of termination of Bank
No. Bank Name No. Bank Name
1 AXIS Bank 22 RBL Bank
2 AU Small Finance Bank 23 South Indian Bank
3 Bandhan Bank 24 Sandarad Chartered Bank
4 City Union Bank 25 Tamilnad Mercantile Bank
5 CSB Bank 26 Ujjivan Small Finance Bank
6 DBS Bank India Limited 27 YES Bank
7 DCB Bank 28 Ahmedabad Mercantile Co-Op Bank
8 Dhanlaxmi Bank 29 Nutan Nagrik Sahkari Bank Ltd.
9 Equitas Small| Finance Bank 30 Rajkot Nagrik Sahkari Bank Ltd
10 FEDERAL Bank 31 Saraswat Co-Operative Bank Ltd
11 HDFC Bank 32 SBPP Co-Operative Bank Ltd.
12 HSBC Bank 33 SVC Co- Operative Bank Ltd
13 ICICI Bank 34 The Cosmo Co-Op Bank Ltd
14 IDBI Bank 35 The Gujarat State Co- Operative Bank
15 IDFC First Bank 36 The Surat District Co-Operative Bank Ltd
16 Induslnd Bank 37 The Surat People's Co-Op. Bank Ltd
17 Jammu and Kashmir Bank 38 The Baroda Central Co- Operative Bank
18 Jana Small Finance bank 39 The Panchmahal District Co-Operative Bank
19 Karnataka Bank 40 The kalupur Commercial Co-Op. Bank
20 Karur Vysya Bank 41 The Rajkot Coommercial Co- Operative Bank
21 Kotak Mahindra Bank 42 The Banaskanthe Mercanttile Co-Op. Bank
43 Gujarat Gramin Bank
SD will be refundable after completion of Guarantee period from Date of completion of satisfactory of work
and finalization of final bill . Earnest money will be liable to be forfeited if (1) If Tender is withdrawn during
validity of the offer and (2) The tenderer fails to deposit the security deposit.
7. Contract Period :-
The time allowed for completion the work is 180 Days from the date of the commencement of the
work, failing which the penalty ½% per week or part thereof plus GST as applicable on delayed portion of
work and / or supply value subject to ceiling of 10% of the total contract value will be imposed.
8. The time limit for the work may be reduced and contractor should make all his efforts to complete the
work within stipulated time limit as may be given by the Engineer in charge depending upon emergency
of work, GETCO reserves the right to reduce the time limit without giving any notice.
Seal & Signature of Bidder - 21 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
9. WELFARE CESS:-
1. As per the Welfare Cess Act, the welfare cess @ 1% is applicable on supply and erection items for
supply, erection, testing & commissioning of substation, transmission lines, EPC/Turnkey projects,
and civil works.
2. Contractor shall get registered under Welfare Cess Act before commencement of work in required
head as per nature of work. Office of the Factory Inspector is authorized at present as a registering
3. GETCO shall pay the welfare cess by way of reimbursing to contractors on production of
documentary evidence of payment. Registration charges will not be reimbursed.
4. The contracts for which supply or part supply of material are in the scope of GETCO, then
contractors shall deposit welfare cess on estimated cost of supplied items to GETCO on progressive
basis of utilization. As this part of welfare cess is on GETCO account, the same shall be reimbursed to
the contractor on receipt of request letter along with documentary evidence of payment. For
calculation of welfare cess on supply part, valuation as per MR shall be taken and informed to the
contractor for payment. This will be over and above the A/T value. The modality of payment/
reimbursement of welfare cess will be as under.
5. On receipt of A/T, the contractor / bidder will get them registered under Welfare Cess Act and
submit the documentary evidence to the concern office. Copy of Registration certificate shall be
submitted before submission of 1st RA bill
6. Before release of payment of first R.A.Bill, the contractor has to submit the documentary evidence of
registration. Only thereafter, the bill will be processed for payment.
7. Before release of payment of subsequent R.A.Bills, the contractor has to submit the documentary
evidence of payment of welfare cess of previous R.A.Bill.
8. The welfare cess shall be reimbursed to the contractor on submission of copy of documentary
evidence of payment by observing due formalities.
10. GST Registration on GETCO’s web portal:
The Bidder should have to take registration under the “GOODS AND SERVICE TAX (GST)”. Bidder has to
register online in given link before bidding. Link for the same is www.getcogujarat.com/gst/ The certified
Xerox copy of such registration shall have to be submitted along with the bid by the bidder.
On forfeiture of EMD, SD or guarantee under the terms and condition of this tender, applicable GST will also be
recovered from the bidder/ contractor and GETCO reserves all rights of such recovery of such forfeited amount
“Supplier contractor should charge GST in Invoice at the rate as agreed to / mentioned in acceptance of tender
only and any deviation in the same shall not be accepted. Further, any additional liability of GST (later on due to
wrong mentioning of GST rate, mis-interpretation of HSN/SAC Code etc.) over and above as charged in the
invoice shall be borne by the supplier /Contractor. However, any refund received by the supplier / contractor
on account of GST Charged from the company ; such refund shall have to be passed on to the company , along
with interest needs to be passed on suo-moto by the supplier contractor.
Further the Company has a right to recover the amount of GST along with penal interest at the of 15% per
annum if GST charged is not paid /short paid to the government or fail to upload the details or uploads
inaccurate particular on GSTIN portal by the Supplier /Contractor within the stipulated time limit.
Seal & Signature of Bidder - 22 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
In case, GOVT. revise the rate of GST rate /code during the tenure of the contract the provision of statutory
variation clause shall apply.”
Final bill shall be passed & paid & SD shall be released only if contractor has duly discharged its GST
liability related to the contract and submit C.A. certificate and under taking.
12. STATUTORY VARIATION:
Any statutory increase or decrease in the taxes and duties including GST and Cess as applicable or in the event of
introduction of new tax/cess or cessation of existing tax/cess subsequent to suppliers offer, if it takes place
within the original contractual delivery date will be to GETCO’s account subject to the claim being supported by
documentary evidence. However, if any decrease takes place after the contractual delivery date, the advantage
will have to be passed on to GETCO.
Statutory Variation clause will not be applicable in case of Supplier /Contractor has opted for Composition
Scheme under GST.
13. The contractor will have to give indemnity bond on Non-Judicial Stamp paper of value Rs. 300/-to GETCO
for material as per attached format. The cost of stamp paper will be born by the contractor.
14. Also the successful bidder will have to execute Agreement on stamp paper of value Rs.300/- at our Circle
office Bharuch before commencement of works as per GETCO’s prescribed Performa. The cost of stamp
paper will be born by the contractor.
15. The contractor will have to give safety cum indemnity on Non-Judicial Stamp paper of value Rs. 300/- to
GETCO against any possible claim of compensation for damage to contractor’s staff or any of third
party during the execution of work. The cost of stamp paper will be born by the contractor.
16. Also the successful bidder will have to execute Agreement on stamp paper of value Rs.300/- at our
Transmission Circle, GETCO, Bharuch before commencement of works as per GETCO’s prescribed
Performa. The cost of stamp paper will be borne by the contractor.
17. Guarantee: - It is the responsibility of the contractor to handover the complete work free of all defects. If
within a period of One (1) year from the date of handing over the work it is noticed that any defects
occurs due to bad workmanship, it is the duty of the contractor to rectify / replace the same at his own
cost. If within seven days from the date of receipt of such notice, the contractor does not take up the
work, same will be carried out at his risk and cost.
18. 10% retention money will be deducted from each R.A. Bills against material issued to contractor.
19. 10% amount of bill will be retained from each RA bill for the work executed after the scheduled date of
completion and on finalization of time limit extension by competent authority; this amount will be
released after deducting amount towards the time limit penalty if any.
20. As regard damage the materials, equipment and worker of the contractor, he himself will be responsible.
If there is any compensation to be paid in respect of “WORKMAN” compensation act of any other
statutory provisions, the same will have to be paid by the contractor direct. If he thinks fit he may take
necessary insurance cover, at his cost.
21. The quantum of the work as mentioned in estimate/ schedule –‘B’ is tentative and it can be varied or
differed as per site condition. The payment shall be made only on actual work executed or order quantity,
whichever is less.
22. The tenderer will be abided by and fulfill all the terms and provisions of the “Tender & Contract” for
works as applicable and incase of any default there to the GETCO shall forfeit the S.D. or any other action
as may be decided by Superintending Engineer (TR), GETCO, Bharuch.
Seal & Signature of Bidder - 23 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
23. The cost of damages, if any will be recovered from the Contractor’s bill. The assessment of which will be
done by field Engineer at his sole discretion and his decision shall be binding to the contractor and shall
be considered as final and unchallengeable.
24. GETCO shall deduct the Income-Tax and other taxes as per prevailing rules from each and every bill.
25. No part rate or reduced rate shall be allowed in final bill.
26. The contractor has to follow all labour laws, safety rules and regulations. The GETCO does not take any
responsibility in case of accident or injury to the workers. The safety/ security of men, materials and
equipments shall be sole responsibility of the contractor.
27. The compliances of all Central/ State Govt. rules, safety and insurance rules etc. and that of local body, is a
must condition for the agency.
28. The Gujarat Energy Transmission Corporation Limited does not bind itself to accept the lowest or any
tender. GETCO reserves the right to reject any or all tender without signing any reasons whatsoever.
29. The erection work should be commenced immediately from the date of receipt of instructions from office
and should be completed within thereafter.
30. The tender includes all minor accessories and items of work which are not have been specifically
mentioned in the specification schedule etc. but are essential for completion of work. The contractor will
not be eligible for any extra payment in respect of such minor accessories and items of work.
31. Tenderer will be qualified only who have submitted all the required documents as mentioned in tender
32. No higher rate or revised rate will be applicable for the work, if work is held up/ closed due to whatever
33. GETCO will not pay any idle charge for any site conditions or any circumstances.
34. In case of any dispute/ doubt, the decision of Superintending Engineer (TR), GETCO, Bharuch. shall be
unchallengeable, final and binding to the contractor.
35. The contractor has to remain in close day to day contact with Engineer in charge of work i.e.DE S/s /Line
concern who will issue detailed instruction for the commencement of the work.
36. Contractor will abide by and fulfill all the terms and conditions and general terms and condition of the
contract for works available in the office.
37. All other general terms and conditions as prevailing in the GETCO shall be applicable to the contract.
38. The contractor will have to complete entire job as per directive and instruction of Engineer in charge. If
he fails to do so entire work will be carried out at contractor’s risk and cost.
39. The contractor must engage sufficient knowledgeable persons round the clock, exclusively for oil filter
machine provided by GETCO for oil filtration work. No loss of oil should occur and in case if occurs; its
cost will be recovered from contractor’s bill. The contractor has to apply sufficient nos. of cycles for oil
filtration works as decided by the Engineer in charge.
40. The tender shall be issued to only the experienced contractor who has completed such job of similar
nature and magnitude satisfactorily in time. However, filling of on line tender, does not qualifies the
tenderer to offer the bid.
41. Tender offer without payment of EMD required certificate, documents, list of tools, tackles, equipments
etc. required for execution of job will be out rightly rejected without assigning any reason thereof and
decision of Superintending Engineer (TR), GETCO,Bharuch will be final and unchallengeable.
42. The Contractor will be governed by The GETCO’s general conditions of works contract. The Booklet will
be available in the concerned office in any working days. In the event of placing order, the contractor will
have to sign this booklet along with other document and agreement. All the usual terms and conditions of
the GETCO, through the same might have not been mentioned in this specification or contractor booklet
will applicable to this contract, and the decision of the Superintending Engineer shall be binding on the
Seal & Signature of Bidder - 24 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
43. After completion of the work, all the surplus materials issued by the GETCO shall be returned by you to
the respective center of the GETCO as per instruction of Engineer in charge at your cost.
44. Specification in any items mentioned in tender are subject to change without any prior notice and
binding to the contractor.
45. If the work is required to be carried out during fix outage then the contractor has to deploy adequate man
power, material, tools etc. well in advance and has to complete the entire work during this specific outage
period only, failing to which GETCO shall be at liberally to deduct the amount of revenue loss due to
prolong outage.
46. If required by GETCO you shall have to provide free to and fro traveling facility to our Junior Engineer or
Technical staff for the work.
47. The contractor shall not refuse to execute the work order at any time and it will be his sole responsibility
to execute and complete this work as per the instruction of Engineer in charge.
48. For shortages of any materials issued by the GETCO for the work, recovery shall be made from you, on
the basis of prices of the materials (prevailing on the date of settlement of materials account) plus 15%
supervision charges.
49. No subcontractor, Power of Attorney shall be allowed without prior approval of competent authority.
50. All the materials issued by GETCO shall be transported to the work site on same day and to be preserved
in safe custody failing to which GETCO shall initiate legal action if required. Similarly as per instruction of
Engineer in charge, you have to credit the material at GETCO store without any loss of time failing to
which GETCO shall initiate legal action if required.
51. No tools, tackles, manpower, crane facilities etc. will be provided by the GETCO.
52. The contractor has to submit the list of tools, tackles, equipments with him along with his tender offer.
The tender without this list and other required documents (as mentioned above herein the tender)
should be rejected out rightly.
53. The bidder shall specifically note that GETCO will not pay any extra amount towards any type of claim
except for the description indicated in Schedule – ‘B’. The party has to carry out all other/ additional
required activities/ works as directed by Engineer in charge which is not mentioned in Schedule but
required to be completed as per site condition and for this work no extra payment shall be made by
a) The interpretation of specifications doubts etc.:- In case of any doubts about what is mentioned in
specification or schedule or elsewhere, the tenderer should get all doubts cleared from the Department
in writing and in advance of filling in the Tender. In case of difference of opinion about interpretation of
specification etc the decision of Superintending Engineer, Transmission Circle, GETCO, Bharuch
and EE(TR) Bharuch will be final and shall be binding to the contractor.
b) Accounts of Materials issued:- The contractor shall have to maintain accurate day to day and item
wise account of use of issued materials which shall be got checked from time to time by the
representative of the GETCO. The contractor will be responsible for custody and preserving the issued
materials till the work is handed over by the contractor after completion.
c) The contractor has to maintain site register, covering all the daily details of material receipt and
utilization, progress of work etc. This register shall be checked and signed by Engineer in charge and
Executive Engineer during the site visit. Any bill without site register shall not be passed.
55. The contractor shall be responsible for breakages, losses and theft of material during transit or erection
after the materials issued from the stores till the completion of work and is taken over by the GETCO.
56. The contractor will be responsible for the loss, distribution of deterioration of the materials, stores or
articles supplied to him by the GETCO, even if such a loss distribution or deterioration has occurred
Seal & Signature of Bidder - 25 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
under any circumstances whatsoever beyond his control as if the materials, stores or articles so supplied
were his property.
57. The contractor shall co-operate with the GETCO in recording measurement etc. as expeditiously as
possible and he shall fulfill all the requirements which are necessary to finalize the accounts on the basis
of its records and pay him such amount as if found due to him together with the amount of security
deposit. If any remaining payable to him after deduction, there from the amount due by him to the
GETCO. The GETCO shall not entertain further claim from thereafter.
58. The competent authority can delete any item in schedule of the tender, if he feels that the rate quoted by
the contractor for that item is abnormally high when compared to the estimated rates.
59. Delivery of Material: - All material/ equipment required for this work as per schedule shall be delivered
at any store centers of GETCO jurisdiction and contractor has to take delivery from these stores or at his
60. You will ensure that completion of erection work i.e. all works connected with substation having been
completed correctly as per Indian Electricity Rules & procedure. Any extra cost involved due to
incompleteness of work or bad workmanship found out Subsequently shall be set right forth with by you
at your own cost.
61. Billing and Payment Terms
(a) The contractor shall have to submit the RA bill of order to the concerned Deputy Engineer of
sub-division of concerned division for payment once in a month period.
(b) 90% payment of amount claimed as per invoice by party as per ScheduleB/Scope of Work
covering various activities and as per terms and conditions of tender made within 60 days from
the date of R.A. bill.
(c) Balance 10% of erection value shall be paid within 60 days against completion of work only after
settlement of material account statement of items supplied, used, erected and successful
commissioning of Sub-Station the same amount will be release in final bill only and payment will be
made only after passing of final bill. All the payment shall made through RTGS/NEFT only by
EE(TR) Bharuch.
(d) If net payable amount is more than Rs 10.0 Lacs, payment will be released from circle
office/corporate office.
(e) The payment will be released within 60 days. However, in case of any delay due to any
eventuality no interest charges shall be paid.
(f) All the bills in accordance with the above clauses must be submitted with the following
1) Item wise work done during billing period.
2) Item wise cumulative work done.
3) Account for material consumed and balance stock.
4) For non-submission or part submission of above information, an additional 5%
amount of the respective RA bill shall be withheld and shall only be released at the time
(g) Any outstanding recoveries of GETCO for any other than this transaction or anywhere done in
GETCO can be recovered from this contractor’s/ supplier’s payment which is authentically
approved by competent authority.
62. PROTECTION OF PROPERTY AND CONTRACTOR’S LIABILITY
The Contractor shall be responsible for any damage resulting from his operations. He shall also be
responsible for protection of all persons including members of public and employees of the Owner and
the employees of other Contractors and Sub-Contractors and all public and private property.
Seal & Signature of Bidder - 26 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
63. Quantities given in the Schedule of erection in price Bid are to be executed by the contractor at the rates
accepted by the Board in the A/T. In case of any deviation in tower quantity / type of tower / length of
line, excavation / concreting resulting into an increase in which event the field officer shall obtain prior
approval of the Head Office and excess quantity shall be paid only at the accepted rate of the A / T. No
any Excess work / amount to be executed without prior approval of competent authority.
64. The erection work beyond contractual ceiling amount shall be done only after approval from the GETCO
65. CONTRACTOR’S SITE ESTABLISHMENT
The Contractor shall at all times keep posted an authorized representative for the purpose of the
Contract. Any written order or instruction of the Engineer or his duly authorized representative shall be
communicated to the said authorized resident representative of the Contractor and the representative
shall be available at a stated address for this purpose.
66. CO-OPERATION WITH OTHER CONTRACTORS
Contractor shall co-operate with all other Contractors or tradesmen of the Owner, who may be
performing other works on behalf of the Owner and the workmen who may be employed by the Owner
and doing work in the vicinity of the Works under the Contract. The Contractor shall also so arrange to
perform his work as to minimize, to the maximum extent possible, interference with the work of other
Contractors and their workmen. Any injury or damage that may be sustained by the employees of the
other Contractors and the Owner, due to the Contractor’s work shall promptly be made good at the
Contractor’s own expense.
67. PROTECTION OF WORK
The Contractor shall have total responsibility for protecting his works till it is finally taken over by the
Engineer. No claim will be entertained by the Owner or by the Engineer for any damage or loss to the
Contractor’s works and the Contractor shall be responsible for complete restoration of the damaged
works to original conditions to comply with the specification and drawings.
SPECIAL COMMERCIAL CONDITION FOR TENDERER
1. TAKING DELIVARY AND INSURANCE: -
1.1 The contractor has keep S/S materials in safe custody and transport to the respective sites and will be
responsible for any damages to or loss of all materials at any stage during transportation or erection or
taking over of the line by GETCO.
1.2 The Contractor has to open site store and ensure for safe custody of all the stored materials at his own
1.3 The Contractor shall have total responsibility for the entire materials stored loose, semi assembled
and/or erected by him at site in his custody. The Contractor shall make suitable security arrangements
is at own cost to ensure the protection of all materials, equipments and works from theft, fire pilferage
and any other damages and loss, it shall be the responsibility of the contractor to arrange for security till
the works are finally taken over by the Corporation.
2 STORAGE-CUM-ERECTION-INSURANCE: -
2.1 The contractor shall take suitable storage-cum-erection insurance cover at his cost to the extent of 100%
cost of sub-station/line materials, which are required to complete the sub-station /line. Bidder shall have to
Seal & Signature of Bidder - 27 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
take the comprehensive Marine cum Erection (MCE) insurance policy against any loss, damage, theft,
pilferage, fire etc. for the complete period of storage, fire etc. for the complete period of storage, erection
and commissioning up to the time of taking cover of the sub-station/line by GETCO. The contractor shall
deal directly and pursue the claim with the Insurance Company and shall be responsible in regard to
maintenance of all insurance coverage as well as for settlement of claim. The proof of insurance policy
taken by the successful contractor shall be furnished/submitted to Engineer-in-charge of GETCO.
No material shall be issued to bidder/erection agency in absence of such insurance policy. The risk
shall be covered for lifting of materials from store to final handing over to GETCO. Further in
absence of the above insurance policy, R.A. bill payment will be withheld.
2.2 In the event of any damage, theft, loss, pilferage, fire etc, Contractor will be responsible to lodge, pursue and
settle all the claims with the insurance company for all items, materials and the corporation shall be kept
informed about it. Contractor shall replace the lost/damaged materials/items promptly irrespective of the
settlement of the claims by underwriter and ensure that the work progress is as per agreed schedule. The
loss, if any, such replacement will have to be borne by the contractor and GETCO will not entertain any
claim/representation in this regard. However it will be contractor’s responsibility to insure the entire
project till the line / sub-station or any other project / works is taken over by the GETCO.
2.3 The estimated cost of line material for insurance is Rs. 10 lacs or (As per instruction of EIC)
3.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may be pertinent to the
Works and obligatory in terms of law to protect his interest and interests of the Owner against all perils
detailed herein. The form and the limit of such insurance as defined herein together with the under-
writer in each case shall be acceptable to the Owner. However, irrespective of such acceptance, the
responsibility to maintain adequate insurance coverage at all time during the period of Contract shall be
of Contractor alone. The Contractor’s failure in this regard shall not relieve him of any of his contractual
responsibilities and obligations. The insurance covers to be taken by the Contractor shall be in the joint
name of the Owner and the Contractor. The Contractor shall, however, be authorized to deal directly
with Insurance Company or Companies and shall be responsible in regard to maintenance of all
insurance covers. Further the insurance should be in freely convertible currency.
3.2 Any loss or damage to the material during handling, transportation, storage, erection, and all activities to
be performed till the successful completion of commissioning of the line shall be to the account of the
Contractor. The Contractor shall be responsible for preference of all claims and make good the damages
or loss by way of repairs and/or replacement of the equipment, damaged or lost. The transfer of title
shall not in any way relieve the Contractor of the above responsibilities during the period of Contract.
The Contractor shall provide the Owner with copy of all insurance policies and documents taken out by
him in pursuance of the Contract. Such copies of documents shall be submitted to the Owner
immediately after such insurance coverage. The Contractor shall also inform the Owner in writing at
least sixty (60) days in advance regarding the expiry/cancellation and/or change in any of such
documents and ensure revalidation, renewal etc., as may be necessary well in time.
3.3 The perils required to be covered under the insurance shall include, but not be limited to fire and allied
risks, miscellaneous accidents (erection risks) workman compensation risks, loss or damage in transit,
theft, pilferage, riot and strikes and malicious damages, civil commotion, weather conditions, accidents
of all kinds, etc. The scope of such insurance shall be adequate to cover the replacement/reinstatement
cost of the equipment for all risks up to and including delivery of goods and other costs till the
equipment is delivered at Site. The insurance policies to be taken should be on replacement value basis
and/or incorporating escalation clause. Notwithstanding the extent of insurance cover and the amount
of claim available from the underwriters, the Contractor shall be liable to make good the full
Seal & Signature of Bidder - 28 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
replacement/rectification value of all equipment/materials and to ensure their availability as per
project requirements.
3.4 Workmen’s Compensation Insurance
This insurance shall protect the Contractor against all claims applicable under the Workmen’s
Compensation Act, 1948 (Government of India). This policy shall also cover the Contractor against
claims for injury, disability, disease or death of his or his SubContractor’s employee, which for any
reason are not covered under the Workmen’s Compensation Act, 1948. The liabilities shall not be less
Workmen’s Compensation : As per statutory Provisions
Employee’s liability : As per statutory Provisions
3.5 Comprehensive General Liability Insurance
The insurance shall protect the Contractor against all claims arising from injuries, disabilities, disease or
death of members of public or damage to property of others, due to any act of omission on the part of
the Contractor, his agents, his employees, his representatives and Sub-Contractors or from riots, strikes
and civil commotion.
3.6 The hazards to be covered will pertain to all the works and areas where the Contractor, his agents and his
employees have to perform work pursuant to the Contract.
3.7 The above are only illustrative list of insurance covers normally required and it will be the responsibility of
the Contractors to maintain all necessary insurance coverage to the extent both in time and amount to
take care of all his liabilities either direct or indirect, in pursuance of the Contract.
4 PENALTY FOR DELAY:-
1. The bidder should note that the completion time allowed for carrying out the work should be strictly
observed. Any delay that may take place in supply and erection beyond contractual cutoff date stated as
per stipulated delivery period shall be subject to the penalty ½% per week or part thereof plus GST as
applicable on delayed portion of work and / or supply value subject to ceiling of 10% of the total
contract value plus GST as applicable will be imposed.
2. In event of failure of the Contractor to pay the amount of Penalty as demanded, the Owner shall be entitled to
deduct the amount of Penalty for delay from the amounts payable to the Contractors under any bills raised
under this contract or any other contract with the GUVNL and its Subsidiary Companies i.e. GETCO, GUVNL,
GSECL, MGVCL, DGVCL, PGVCL UGVCL. It is permissible for the Owner to adjust the amount of Penalty of delay
against any Bank Guarantee furnished by the Contractor under this contract or any other contract with GUVNL
and/or its subsidiary companies.
3. If it is found that the work is unsatisfactory or not progressing as per the program / BARCHART
/ Target period, any action taken by the GETCO, as may be deemed fit, to see that work is
completed as required by the GETCO, would be at the risk and cost of the contractor..
4. Any delay causing extension of outages shall be contractor’s responsibility and appropriate
amount (in term of Rupees) as decided by Ex. Engineer (TR),KIM shall be recovered from
Contractor’s bill as a penalty.
Seal & Signature of Bidder - 29 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
Taxes and Duties:
3.5.1 As regards the income Tax, surcharge on income tax and any other corporate tax, Excluding GST
and excluding welfare cess at prevailing rate the owner shall not bear any tax liability whatsoever. The bidder
shall be liable and responsible for payment of such taxes as attracted under the provisions of the law.
3.5.2 Not withstanding the tax liabilities as per the sub-clause14.1 above the owner shall have the right to
make deduction at source from the amounts payable to the contractor in respect of Income Tax (on the cost
of items of supply included in the works contract) as may be mandatory in terms of the law. The owner shall
not bear any liability in this regard but shall issue necessary certificate in respect of such deduction made.
3.5.3 In case any tax or duty is newly introduced by the Government applicable for this contract with
effect from the next day of the date submission of the bid and if the contractor is required to pay
additional tax or duty, then the owner shall reimburse the contractor the additional tax or duty so paid
by the contractor against submission by the contractor of documentary evidence to the satisfaction of
the owner. This provision will not be applicable to transaction between the contractor and his sub-
contractors. Besides the said statutory variation, no other statutory variation shall be payable by the owner.
3.5.4 The owner’s liability for all taxes and duties under the contract shall be limited to those indicated by
the Bidder in the Sign & Seal of Contractor Page 8 Bid Proposal Sheets, subject to the statutory variations
and variations as per Clause No. 14.3. If the cost to the Contractor during the performance of the ‘Contract’
shall be increased or reduced by reasons of the making, passing or promulgation of any law after the date
of submission of bid or by any order, regulation or bye-law having the force of law the amount of such
increase or reduction shall be added to or deducted from the “Contract Price” as the case may be for direct
transactions between contactor & owner, and not for bought out items. It is the Bidders responsibility to
furnish details of taxes, duties, levies etc. applicable as on the date of submission of the bid.
3.5.5 No claim for any increase towards the statutory variation regarding enhancement of existing tax
or duty or introduction of a new tax or duty applicable shall be entertained by the Owner during the
extended period of contract, if any, provided the extension of the contract is required by causes attributable
to the contractor.
35.6 The provision of statutory variation regarding enhancement of existing tax or duty or introduction of
a new tax or duty will be applicable only to the direct transaction between the contractor and the owner.
3.5.7 Before quoting, the bidder may ascertain from the concerned tax authorities of Government of Gujarat
the applicability of Work Contract Tax. Entry Tax, GST etc. in respect of this work and include the same
in the quoted price. No separate claim in this regard will be entertained by the Owner, as it is the
responsibility of the Bidder to pay all these taxes.
In case, GOVT. revise the rate of GST rate /code during the tenure of the contract the provision of statutory
variation clause shall apply.”
"RIGHTS OF THE OWNER:
Whenever any claim or claims for payment of a sum of money arises out of or under the contract against the
Contractor, the Owner shall be entitled to withhold and also have a lien to retain such sum or sums in whole or
in port from the security, If any, deposited by the Contractor and for the purpose aforesaid, the Owner shall be
Seal & Signature of Bidder - 30 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
entitled to encash and withhold the amount of Performance Bank Guarantee or other security, if any, furnished
as the case may be. The Owner shall also have a lien over the same pending finalization or adjudication of any
such claim. In the event Of the security is insufficient to cover the claimed amount or amounts, the Owner shall
be entitled to withhold and have lien to retain to the extent of the such claimed amount or amounts referred to
above, from any sum or sums found payable or which at any time thereafter may become payable to the
Contractor under the same contract or any other contract with the Owner or GUVNL or its subsidiary companies
pending finalization or adjudication of any such claim.
Line in respect of Claims in other Contracts:
a) Any sum of money due and payable, to the Contractor (Including the security deposit) under
the contract may be withheld or retained by way of lien by the Owner against any of its claim in respect of
payment of a sum of money arising out of or under any other contract made by the Contractor with the Owner
or GUVNL or any of its subsidiary companies.
b) It is on agreed that the sum of money so withheld or retained under this clause by the Owner will be kept
withheld or retained as such by the Owner till its claim arising out of the same contract or any other contract is
either mutually settled or determined by the arbitrator or competent court, as the case may be, and the
Contractor shall have no claim for interest or damages whatsoever on this account or on any other ground in
respect of any sum of money withheld or retained under this clause and as may be duly notified to the
This is put up herewith for perusal and approval so that above stated enabling clauses may be incorporated in
the terms and conditions of Tender / Contracts by our Procurement Department. Project Department,
Transmission Department, R&M Department and Civil department. Further, we may ask CE (Project) to instruct
the field offices for incorporating the above clauses in field tenders.
TERMS & CONDITIONS REGARDING INDUSTRIALLAWS AND OTHER RELATED MATTERS
1) Wages to be paid at time of payment etc. by the contractor.
a. The contractor shall pay minimum prevailing rates per day or as may be specified hereafter or rates
fixed under the minimum wages Act. Whichever is higher. The wages or very contract labour employed
by him under this contact shall be paid by him before the expiry of 7th day of the month in respective of
which the wages are payable ( i.e. wages of a month have to be paid by him in the first week of the next
month). The payment shall be disbursed in the presence of management representative during the
working hours in factory premises and the contractor shall get the entries certified in the register of
wages by the representative of the GETCO. Any default will result in cancellation of contract forthwith or
also the contractor shall be paid punishable to the extent of Rs.100/- fine per each day.
b. The contractor shall give his telephone number and address to the GETCO so that in case of labour
troubles etc. the contractor can be contacted. The contractor shall arrange to have his office outside the
factory premises and the contractor shall keep himself present throughout the working hours.
Seal & Signature of Bidder - 31 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
(A) Person below the age of 18 years shall not be employed for the work.
(B) No. female worker shall be employed in the night shift between 7 p.m. to 6 a.m.
(C) Contractor shall maintain a valid labor license under the contract labour (Regulation and Abolition) Act
for employing necessary manpower to be required by him. In the absence of such license the contract
shall be liable to be terminated without assigning any reason thereof.
(D) The contractor shall at his own expenses comply with all labour laws and keep the GETCO indemnified
in respective thereof. Some of the major liabilities under various labour and industrial laws which the
contractor shall comply with areas under :-
(i) Payment of contribution by way of employer’s contribution towards provident fund, family pension
scheme, Deposit linked insurance scheme, Administrative charge etc. at the rates make applicable
from time to time by Government of Gujarat/Government of India or other statutory authority.
(ii) Payment of deposit in respect of each contract labour at the rate as per admissible with the office of
commissioner of Labour as per the contract Labour (Regulation and abolition Act.).
(iii) License fee as prescribed under the contract labour (Regulation and abolition Act) and rules framed
there under depending upon the number of workmen employed by the contractor.
(iv) Paid leave facility and wages as per the provision of the factories Act at the rate of one day for every
20 days of working.
(v) Identify cards as prescribed under the factories Act with photo at fixe there to the same
identification. Liabilities as per industrial Disputes Act any payment to the contractor’s employees
arising out of any claim or disputes under the industrial Disputes Act, 1947 or any other labour laws.
(vi) Payment of compensation in case accidental inury.
(vii) Maternity leave as per the provisions of the maternity Benefit Act. The above are some of the
major liabilities of the contractor in addition to other liabilities. Prescribed under the various labour
laws in force from time to time from statutory authorities like State Government/ Government of
India which the contractor shall have to comply with.
3) Provident fund & Family pension Scheme:-
The contractor shall submit along with his bill (month wise) a statement regarding deduction against
employees provident fund and family pension scheme in respective of each concerned employee,
provident fund and family pension scheme at the rate at admissible ( or at the rate made applicable
by the Government from time to time ) of the wages. The contractor’s contribution and his workers
contribution towards provident fund and family pension scheme shall be deposited by the contractor
with concern regional Provident Fund Commissioner office.
4) Deposit Linked Insurance Scheme :-
The contractor shall have to deposit ½ % of the wage in respect of employees who is a member of the
Provident Fund as the contribution to the deposit.
Linked insurance Scheme with concern Regional Provident Fund Commissioner office.
(5) Administrative Charges:-
Administrative charges for maintaining provident fund A/C shall be deposited by the contractor with
concern Regional Provident Fund Commissioner office at the rates applicable.
(6) Paid Leave Facility:-
Paid leave facility at the rate of one day for every twenty days worked by the contract labour shall be
provided by the contractor to his workers. He shall maintain leave Records/leave cards for individual
labourer which shall be duly verified and approved/certified by the authorized officer of the GETCO.
(7) Workmen’s compensation fund & Employer’s Liability Insurance:-
The contractor shall cover all his employees under workmen’s compensation fund and under the
liability insurance. Insurance shall be affected for the entire contractor’s employee engaged in the
Seal & Signature of Bidder - 32 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
performance of this contract. If any of the work is subject the contractor shall require the sub-
contractor to provide workmen’s compensation and employer’s liability insurance for the latter’s
employees unless such employees are covered under the contractor’s insurance.
(8) The contractor shall employ adequate number of experienced staff at site for dial supervision and for
maintenance of various register and records required under the law and contract No. payment for
supervision shall be admissible.
(9) Contractor to Identify the GETCO:-
The contractor shall indemnify the GETCO and every member officer and employees of the GETCO
also, engineering in charge and his staff against all actions, proceeding, claims demands, costs and
expenses which may be made against the GETCO or Government for or in respective of formance of
his obligation under the contract documents. The GETCO shall not liable for or in respective of or in
consequence of any accident or injury to any workman or other person in the employment of the
contractor or his sub-contractor and the contractor shall indemnify and keep indemnified the GETCO
against all such damage and compensation and against all claims, demands, proceedings costs,
charges and expenses whatever in respective thereof in relation thereto.
(10) The GETCO reserves the right to terminate this rate contract at any time during its tendency without
giving notice of termination or any reasons thereof.
(11) The GETCO will be entitled to deduct directly from the bills, to be paid to the contractor any sum or
payable by you and which sum/sums the GETCO is required to pay as principal employer on account
of your default in respect of all liabilities referred to in above clauses.
(12) The erection work should be carried out according to the specification and as per instructions
and programmed laid out by the Engineer in-charge of the work.
(13) The contractor should employee as Supervisor with sufficient qualification and experience who can
supervise the execution of work throughout. He should always be present on the site.
(14) Cutting, bending, welding, brazing, wherever necessary is to be done by the contractor.
(15) The contractor has to carry out all the works in accordance with revised and latest provision under
I.E. Rules Act made there under and as per instruction of Engineer in charge.
(16) Contractor has to co-ordinate E.I.C. for planning of outage and work schedule thereof, so as to
complete all the planned work in outage. Contractor has to deploy adequate manpower accordingly.
(17) In addition to the general of the construction particular, attention shall be paid to the final finish and
every effort shall be made to have the entire work contented with standard of workmanship by the
(18) Electricity Rules: -All the works shall be carried out in accordance with latest rules under Electricity
(19) Testing: - Complete installation shall be put to the necessary test as required and shall be got approved
by Government Electrical Inspector.
(20) CONTRACTOR’S MATERIALS BROUGHT TO SITE
a) The Contractor shall bring to Site all materials, including construction equipment, tools and tackles
for the purpose of the works under intimation to the Engineer. All such goods shall, from the time of
their being brought vest in the Owner, but may be used for the purpose of the works only and shall
not on any account be removed or taken away by the Contractor without the written permission of
the Engineer. The Contractor shall nevertheless be solely liable and responsible for any loss or
destruction thereof and damage thereto.
b) After the completion of the Works, the Contractor shall remove from the Site under the direction of
the Engineer the materials such as construction equipment, erection tools and tackles, scaffolding etc.
with the written permission of the Engineer.
(21) FIELD OFFICE RECORDS
Seal & Signature of Bidder - 33 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
The Contractor shall maintain up to date copies of all drawings, specifications and other Contract
Documents and any other supplementary data complete with all the latest revisions thereto. The
Contractor shall also maintain in addition the continuous record of all changes to the above Contract
Documents, drawings, specifications, and supplementary data, etc. effected at the field and on
completion of his total assignment under the Contract shall incorporate all such changes on the
drawings and other Engineering data to indicate as installed conditions of the equipment furnished and
erected under the Contract. Such drawings and Engineering data shall be submitted to the Engineer in
required number of copies.
(22) Contractor shall purchase all brought out items as per schedule-B with taking prior approval from
Executive Engineer (TR), Bharuch. Any item without approval shall not be permitted and GETCO
shall not be responsible for accept such items.
(23) DISCIPLINE OF WORKMEN
The Contractor shall adhere to the disciplinary procedure set by the Engineer in respect of his employees
and workmen at Site. The Engineer shall be at liberty to object to the presence of any representative or
employee of the Contractor at the Site, if in the opinion of the Engineer such employee has misconduct
himself or is incompetent or negligent or otherwise undesirable and then the Contractor shall remove
such a person objected to and provide in his place a competent replacement.
(24) CONTRACTOR’S FIELD OPERATION
1 The Contractor shall keep the Engineer informed in advance regarding his field activity plans and
schedules for carrying-out each part of the works. Any review of such plan or schedule or method of
work by the Engineer shall not relieve the Contractor of any of his responsibilities towards the field
activities. Such reviews shall also not be considered as an assumption of any risk or liability by the
Engineer or the Owner or any of his representatives and no claim of the Contractor will be entertained
because of the failure or inefficiency of any such plan or schedule or method of work reviewed. The
Contractor shall be solely responsible for the safety, adequacy and efficiency of plant and equipment and
his erection methods.
2 The Contractor shall have the complete responsibility for the conditions of the Work-site including the
safety of all persons employed by him or his Sub–Contractor and all the properties under his custody
during the performance of the work. This requirement shall apply continuously till the completion of the
Contract and shall not be limited to normal working hours.
(25) PROGRESS REPORT
The Contractor shall furnish three (3) copies each to the Engineer of progress including if any,
photographs of the work done at Site. The monthly progress report detailing-out the progress achieved
on all erection activities shall highlight comparison to the schedules. The report shall also indicate the
reasons for the variance between the scheduled and actual progress and the action proposed for
corrective measures, wherever necessary.
(26) MAN-POWER REPORT
The Contractor shall submit to the Engineer, on the first day of every month, a man hours schedule for
the month, detailing the man hours scheduled for the month, skill-wise and area-wise.
(27) Contract Quality assurance:
The Bidder shall include in his proposal the Quality Assurance Program containing the overall quality
management and procedures which he proposes to follow in the performance of the Works during
various phases. At the time of Award of Contract, the detailed Quality Assurance Program to be followed
Seal & Signature of Bidder - 34 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
for the execution of the Contract will be mutually discussed and agreed and such agreed Program
shall form a part of the Contract.
GENERAL CONDITIONS OF CONTRACT
(C) GENERALTERMS &CONDITIONS OF CONTRACT
A. INTRODUCTION
1.0 DEFINITION OF TERMS
1.1 The ‘Contract’ means the agreement entered into between the Owner and the Contractor as per the Contract
Agreement signed by the parties, including all attachments and appendices thereto and all documents
incorporated by reference therein.
1.2 ‘Owner’ shall mean the Gujarat Energy Transmission Corporation Ltd, Vadodara or any of its group
companies i.e GUVNL, GSECL, MGVCL, DGVCL, PGVCL, UGVCL and shall include its legal
representatives, successors and assigns.
1.3 ‘Contractor’ shall mean the Bidder whose bid is accepted by the Owner for the award of the Works and shall
include such successful Bidder’s legal representatives, successors and permitted assigns.
1.4 ‘Engineer’ shall mean the officer appointed in writing by the Owner to act as Engineer from time to time for
the purpose of the Contract.
1.5 The terms ‘Stores’ and ‘Materials’ shall mean and include equipment, stores and materials to be issued to the
Contractor under the Contract.
1.6 ‘Works’ shall mean and include taking delivery of line materials labour and services, as per the Specifications
and complete erection, testing and putting into satisfactory operation including all transportation, handling,
unloading and storage at the Site as defined in the Contract.
1.7 ‘Specifications’ shall mean the Specifications and Bidding Document forming a part of the Contract and such
other schedules and drawings as may be mutually agreed upon.
1.8 Site’ shall mean and include the land and other places on, into or through which the works and the related
facilities are to be erected or installed and any adjacent land, paths, street or reservoir which may be allocated
or used by the Owner or Contractor in the performance of the Contract.
1.9 The term ‘Contract Price’ shall mean the lump-sum price quoted by the Contractor in his bid with additions
and/or deletions as may be agreed and incorporated in the Letter of Award and the contract agreement for the
entire scope of the works.
1.10 The term “Erection portion” of the contract price shall mean the value of field activities of the works including
erection, testing, and putting into satisfactory operation including successful completion of performance and
guarantee test to be performed at site by the contractor including cost of insurances.
Seal & Signature of Bidder - 35 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
1.11 Site Engineer ‘Inspector’ shall mean the owner’s Engineers or any person nominated by the time to inspect the
equipment; stores or Works under the Contract and/or the duly authorized representative of the Owner.
1.12 ‘Notice of Award of Contract’/’Letter of Award’/’Telex of Award’ shall mean the official notice issued by the
Owner notifying the Contractor that his bid has been accepted.
1.13 ‘Order’ shall mean the official letter issued by the Owner informing the acceptance of the bid.
1.14 Date of Contract’ shall mean the date on which letter of commencement of work issued by the respective sub
division deputy engineer.
1.15 ‘Month’ shall mean the calendar month. ‘Day’ or ‘Days’ unless herein otherwise expressly defined shall mean
calendar day or days of 24 hours each.
A ‘Week’ shall mean continuous period of seven (7) days.
1.16 Writing’ shall include any manuscript, type written or printed statement, under or over signature and/or seal as
the case may be.
1.17 When the words ‘Approved’, ‘Subject to Approval’, ‘Satisfactory’, ‘Equal to’, ‘Proper’, ‘Requested’, ‘As
Directed’, ‘Where Directed’, ‘When Directed’, ‘Determined by’, ‘Accepted’, ‘Permitted’, or words and
phrases of like importance are used the approval, judgment, direction etc. is understood to be a function of the
Owner/Engineer.
1.18 Test on completion shall mean such tests as prescribed in the Contract to be performed by the Contractor
before the work is taken over by the Owner.
1.19 ‘Performance and Guarantee Tests’, shall mean all operational checks and tests required to determine and
demonstrate capacity, efficiency, and operating characteristics as specified in the Contract Documents.
1.20 The term ‘Final Acceptance’/‘Taking Over’ shall mean the Owner’s written acceptance of the Works
performed under the Contract, after successful commissioning/completion of Performance and Guarantee
Tests, as specified in the accompanying Technical Specifications or otherwise agreed in the Contract.
1.21 ‘Latent Defects’ shall mean such defects caused by faulty designs, material or work-man- ship which cannot be
detected during inspection, testing etc, based on the technology available for carrying out such tests.
1.22 ‘Codes’ shall mean the following including the latest amendments and/or replacements, if any:
a) Indian Electricity Act, 1905 and Rules and Regulations made there under.
b) Electricity Act 2003 and Rules & Regulations made there under.
c) Indian Factory Act, 1948 and Rules and Regulations made there under.
d) Indian Explosives Act, 1884 and Rules and Regulations made there under.
e) Indian Petroleum Act, 1934 and Rules and Regulations made there under.
f) A.S.M.E. Test Codes.
g) A.I.E.E. Test Codes.
h) American Society of Materials Testing Codes.
Seal & Signature of Bidder - 36 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
i) Standards of the Indian Standards Institution.
j) Other Internationally approved standards and/or rules and regulations touching the subject matter of the
1.23 Words imparting the singular only shall also include the plural and vice –versa where the context so requires.
1.24 Words imparting ‘Person’ shall include firms, companies, corporations and associations or bodies of
individuals, whether incorporated or not.
1.25 Terms and expressions not herein defined shall have the same meaning as are assigned to them in the Indian
Sale of Goods Act (1930), failing that in the Indian Contract Act (1872) and failing that in the General Clauses
Act (1897) including amendments thereof, if any.
1.26 In addition to the above the following definitions shall also apply.
a) ‘All equipment and materials’ to be supplied shall also mean ‘Goods’.
b) ‘Constructed’ shall also mean ‘erected and installed’.
c) ‘Contract Performance Guarantee’ shall also mean ‘Contract Performance Security’.
2.0 APPLICATION
These General Conditions shall apply to the extent that they are not superseded by provisions in other parts of
The works carried out under this Contract shall conform to the all statutory regulation and provisions the acts,
mentioned in the Technical Specifications, and, when no regulations or standard is mentioned, to the
authoritative regulations or standards/ Act, appropriate to the works and such stipulations shall be the latest
issued by the concerned institution.
4.0 LANGUAGE AND MEASURES
All documents pertaining to the Contract including specifications, schedules, notices, correspondences,
operating and maintenance instructions, drawings or any other writing shall be written in English language.
The Metric System of measurement shall be used exclusively in the Contract.
5.0 CONTRACT DOCUMENTS
5.1 The term Contract Documents shall mean and include the following which shall be deemed to form an integral
part of the Contract:
a) Invitation to Bid including letter forwarding the Bidding Documents, Instructions to Bidders, General
Terms and Conditions of Contract and all other documents included under Volume- I and the Special
Conditions of Contract.
b) Specifications of the erection of the equipments and other technical services to be provided under the
Contract as brought out in the accompanying Technical Specifications.
c) Contractor’s Bid Proposal and the documents attached there to including the letters of clarifications
thereto between the Contractor and the Owner prior to the Award of Contract except to the extent of
Seal & Signature of Bidder - 37 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
d) All the materials, literature, data and information of any sort given by the Contractor along with his bid,
subject to the approval of the Owner /Consultant.
e) Letter of Award and any agreed variations of the conditions of the documents and special terms and
conditions of Contract, if any.
5.2 In the event of any conflict between the above mentioned documents the matter shall be referred to the
Engineer whose decision shall be considered as final and binding upon the parties.
6.0 USE OF CONTRACT DOCUMENTS AND INFORMATION
6.1 The Contractor shall not, without the Owner’s prior written consent, disclose the Contract, or any provision
thereof, or any specification, plan, drawing, pattern, sample or information furnished by or on behalf of the
Owner in connection therewith, to any person other than a person employed by the Contractor in the
performance of the Contract. Disclosure to any such employed person shall be made in confidence and shall
extend only so far as may be necessary for the purpose of such performance.
6.2 The Contractor shall not, without the Owner’s prior written consent, make use of any document or information
enumerated in various Contract documents except for the purpose of performing the Contract.
6.3 The Contractor shall not communicate or us in advertising, publicity, sales releases or in any other medium,
photographs or other reproduction of the Works under this Contract, or descriptions of the site, dimensions,
quantity, quality or other information, concerning the works unless prior written permission has been obtained
from the Owner.
6.4 Any document, other than the Contract itself, enumerated in various Contract documents shall remain the
property of the Owner and shall be returned (in all copies) to the Owner on completion of the Contractor’s
performance under the Contract if so required by the Owner.
7.0 CONSTRUCTION OF THE CONTRACT
7.1 Notwithstanding anything stated elsewhere in the bid documents, the Contract to be entered into will be treated
as a single Contract.
Award shall be placed on the successful Bidder as follows:
For providing services like inland transportation, insurance for delivery at site, unloading, storage, handling at
site, installation, testing and commissioning including performance testing in respect of all the equipment
material equipment/materials given by the owner after observing standard store procedures for transport from
owner’s stores, insurance, unloading storage handling at site installation testing & commissioning.
7.2 In case erection Contract, or where the Owner hands over his equipment to the Contractor for executing, then
the Contractor shall at the time of taking delivery of the equipment/dispatch documents be required to execute
an Indemnity Bond in favor of the Owner in the form acceptable to the SE(TR) GETCO Bharuch for keeping
the equipment in safe custody and to utilize the same exclusively for the purpose of the said Contract. Samples
of Performa for the Indemnity Bond will be furnished during award of Contract.
7.3 The Contract shall in all respects be construed and governed according to Indian Laws.
Seal & Signature of Bidder - 38 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
7.4 It is clearly understood that the total consideration for the Contract(s) has been broken up into various
components only for the convenience of payment under the Contract(s) and for the measurement of deviations
or modifications under the Contract(s).
8.0 JURISDICTION OF CONTRACT
8.1 The laws applicable to the Contract shall be the laws in force in India. The Courts of Bharuch shall have
exclusive jurisdiction in all matters arising under this Contract.
9.0 EXECUTION OF CONTRACT:
9.1 The Owner, after the issue of the Letter of Award to the Contractor, will send one copy of the final agreement
to the Contractor for his scrutiny and approval.
9.2 The Agreement, unless otherwise agreed to, shall be signed within 10 days of the acceptance of the Letter of
Award, at the office the Owner at Bharuch on a date and time to be mutually agreed. The Contractor shall
provide for signing of the Contract, Performance Guarantee, appropriate power of attorney and other requisite
materials. In case the Contract is to be signed beyond the stipulated time, the Bid Guarantee submitted with the
Proposal will have to be extended accordingly.
9.3 The Agreement will be signed in copies to be specified and the Contractor shall be provided with one signed
original and the rest will be retained by the Owner.
9.4 The Contractor shall provide free of cost to the Owner all the Engineering data, drawings, and descriptive
materials submitted with the bid, to form a part of the Contract immediately after issue of Letter of Award
9.5 Subsequent to signing of the Contract, the Contractor at his own cost shall provide the Owner with copies of
agreement within fifteen (15) days after the signing of the Contractor.
10.0 ENFORCEMENT OF TERMS
10.1 The failure of either party to enforce at any time any of the provisions of this Contract or any rights in respect
thereto or to exercise any option therein provided, shall in no way be construed to be a waiver of such
provisions, rights or options or in any way to affect the validity of the Contract. The exercise by either party of
any of its rights herein shall not preclude or prejudice either party from exercising the same or any other right
it may have under the Contract.
11.0 COMPLETION OF CONTRACT
11.1 Unless otherwise terminated under the provisions of any other relevant clause, this Contract shall be deemed to
have been completed on the expiry of the guarantee period as provided for under the clause entitled
‘Guarantee’ in this section of the Volume-I.
B. GUARANTEES & LIABILITIES
12.0 TIME – THE ESSENCE OF CONTRACT
12.1 The time and the date of completion of the Contract as stipulated in the Contract by the Owner without or with
modifications, if any, and so incorporated in the Letter of Award, shall be deemed to be the essence of the
Contract. The Contractor shall so organize his resources and perform his work as to complete it not later than
the date agreed to.
Seal & Signature of Bidder - 39 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
12.2 The Contractor shall submit a detailed bar chart within the time frame agreed consisting of adequate number of
activities covering various key phases of the work such as field erection activities within five (5) days of the
date of Notification of Award. This network shall also indicate the interface facilities to be provided by the
Owner and the dates by which such facilities are needed. The Contractor shall discuss the network so
submitted with the Owner and the agreed network shall form part of the Contract documents. During the
performance of the Contract, if in the opinion of the Engineer, proper progress is not maintained, suitable
changes shall be made in the Contractor’s operations to ensure proper progress without any cost implication to
the Owner. The interface facilities to be provided by the Owner in accordance with the agreed network shall
also be reviewed while reviewing the progress of the Contractor.
12.3 Based on the above agreed network/bar chart fortnightly reports shall be submitted by the Contractor as
directed by the Engineer.
12.4 Subsequent to the finalization of the network, the Contractor shall make available to the Engineer a detailed
program in line with the agreed Contract network.
Such program shall be reviewed, updated and submitted to the Engineer every month thereafter.
12.5 The above bar charts/ program shall be compatible with the Owner’s computer environment and furnished to
the Owner on such media as may be desired by the Owner.
13.0 EFFECTIVENESS OF CONTRACT
The Contract shall be considered as having come into force from the date of the commencement given by the
respective construction sub division unless otherwise provided in the notification of award.
14.0 PENALTY FOR DELAY
14.1 The total amount of penalty for delay under the Contract will be ½ % per week plus applicable tax if any on
14.1 The total amount of penalty for delay under the Contract will be ½ % per week plus applicable tax if any on
delayed work amount subject to a maximum of 10% plus applicable tax if any of the Contract prices detailed
in the Special Conditions of Contract (SCC).
15.1 In the event of any emergency where in the judgment of the Engineer, delay would cause serious loss or
damages, repairs or adjustment may be made by the Engineer or a third party chosen by the Engineer without
advance notice to the Contractor and the cost of such work shall be paid by the Contractor. In the event such
action is taken by the Engineer, the Contractor will be notified promptly and he shall assist wherever possible
in making necessary corrections. This shall not relieve the Contractor of his liabilities under the terms and
conditions of the Contract.
15.3 If it becomes necessary for the Contractor to rectify or renew any defective portions of the works the provision
of this clause shall apply to portion of the works so rectified or corrected until the expiry of six (6) months
from the date of such rectification or correction. If any defects are not rectified within a reasonable time, the
Engineer may proceed to do the work at the Contractor’s risk and cost but without prejudice to any other rights
which the Owner may have against the Contractor in respect of such defects.
15.4 The rectification or correction of the work will be carried out free of cost by the Contractor. If any rectification
or correction is carried out on his behalf at the site, the Contractor shall bear the cost of such rectification or
Seal & Signature of Bidder - 40 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
15.5 The acceptance of the works by the Engineer shall in no way relieve the Contractor of his obligations under
15.6 At the end of the guarantee period, the Contractor’s liability ceases except for latent defects. For latent defects,
the Contractor’s liability as mentioned in Clause Nos. 15.1 through 15.5 above, shall remain till the end of
months from the date of completion of guarantee period.
16.0 TAXES, PERMITS & LICENCES
The Contractor shall be liable and pay all non-Indian taxes, duties, levies lawfully assessed against the Owner
or the Contractor in pursuance of the Contract. In addition to this the Contractor shall be responsible for
payment of all Indian duties, levies and taxes lawfully assessed against the Contractor for his personal income
& property only.
18.0 DEFENCE OF SUITS
If any action in court is brought against the Owner or Engineer or an officer or agent of the Owner, for the
failure, omission or neglect on the part of the Contractor to perform any acts, matters, covenants or things
under the Contract, or for damage or injury caused by the alleged omission or negligence on the part of the
Contractor, his agents, representatives or his Sub-Contractors, or in connection with any claim based on lawful
demands of Sub-Contractors, workmen, suppliers or employees, the Contractor shall in all such cases
indemnify and keep the Owner, and the Engineer and/or his representative, harmless from all losses, damages,
expenses or decrees arising of such action.
20.0 LIMITATION OF LIABILITIES
The final payment by the Owner in pursuance of the Contract shall mean the release of the Contractor from all
his liabilities under the Contract. Such final payment shall be made only at the end of the Guarantee/Warranty
period or after finalization of material account and final bill and till such time as the Contractual liabilities and
responsibilities of the Contractor, shall prevail. All other payments made under the Contract shall be treated as
on-account payments.
21.0 ENGINEER’S DECISION
21.1 In respect of all matters which are left to the decision of the Engineer including the granting or with-holding of
the certificates, the Engineer shall, if required to do so by the Contractor, give in writing a decision thereon.
21.2 If, in the opinion of the Contractor, a decision made by the Engineer is not in accordance with the meaning and
intent of the Contract, the Contractor may file with the Engineer, within fifteen (15) days after receipt of the
decision, a written objection to the decision.
Failure to file an objection within the allotted time will be considered as an acceptance of the Engineer’s
decision and the decision shall become final and binding.
21.3 The Engineer’s decision and the filing of the written objection thereto shall be a condition precedent to the
right to request arbitration. It is the intent of the Agreement that there shall be no delay in the execution of the
works and the decision of the Engineer as rendered shall be promptly observed.
22.0 POWER TO VARY OR OMIT WORK
22.1 No alterations, amendments, omissions, suspensions or variations of the Works (hereinafter referred to as
‘variation’) under the Contract as detailed in the Contract Documents, shall be made by the Contractor except
as directed in writing by the Engineer, but the Engineer shall have full powers subject to the provisions
Seal & Signature of Bidder - 41 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
hereinafter contained, from time to time during the execution of the Contract, by notice in writing to instruct
the Contractor to make such variation without prejudice to the Contract. The Contractor shall carry out such
variation and be bound by the same conditions as far as applicable as though the said variations occurred in the
Contract Documents. If any suggested variations would, in the opinion of the Contractor, if carried out,
prevent him from fulfilling any of his obligations or guarantees under the Contract, he shall notify the Engineer
thereof in writing and the Engineer shall decide forthwith whether or not, the same shall be carried out and if
the Engineer confirms his instructions, the Contractor’s obligations and guarantees shall be modified to such
an extent as may be mutually agreed. Any agreed difference in cost occasioned by any such variation shall be
added to or deducted from the Contract Price as the case may be.
22.2 In the event of Engineer requiring any variation, a reasonable and proper notice shall be given to the
Contractor to enable him to work his arrangement accordingly, and in cases where goods or materials are
already prepared or any design, drawings or pattern made or work done as per the contract requires to be
altered, a reasonable and agreed sum in respect thereof shall be paid to the Contractor.
22.3 In any case in which the Contractor has received instructions from the Engineer as to the requirement of
carrying out the alterations or additional or substituted work which either then or later on, will in the opinion of
the Contractor, involve a claim for additional payment, the Contractor shall immediately and in no case later
than thirty (30) days, after receipt of the instructions aforesaid and before carrying out the instructions, advise
the Engineer to that effect. But the Engineer shall not become liable for payment of any charges in respect of
any such variations, unless the instructions for the performance of the same shall be confirmed in writing by
22.4 If any variation in the Works results in reduction of Contract Price, the parties shall agree, in writing, so to the
extent of any change in the price, before the Contractor proceeds with the change.
22.5 In all the above cases, in the event of a disagreement as to the reasonableness of the said sum, the decision of
the Engineer shall prevail.
22.6 Notwithstanding anything stated above in this clause, the Engineer shall have the full power to instruct the
Contractor, in writing, during the execution of the Contract to vary the quantities of the items or groups of
items in accordance with the provisions of clause entitled ‘Change of Quantity’ in section GCC of this
Volume-I. The Contractor shall carry out such variations and be bound by the same conditions as though the
said variations occurred in the Contract Documents. However, the Contract Price shall be adjusted at the rates
and the prices provided for the original quantities in the Contract.
23.0 ASSIGNMENT AND SUB-LE TTING OF CONTRACT:
No subletting of contract is allowed. Contractor should carry out work on his own under his or his authorized
supervisor and by labours employed by him.
24.0 CHANGE OF QUANTITY
24.1 During the execution of the Contract, the Owner reserves the right to increase or decrease the quantities of
items under the Contract but without any change in unit price or other terms & conditions. Such variations
unless otherwise specified in the accompanying Special Conditions of Contract and/or Technical
Specifications, shall not be subjected to any limitation for the individual items but the total variations in all
such items under the Contract shall be limited to a percentage of the Contract price as specified in the Special
Conditions of Contract.
Seal & Signature of Bidder - 42 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
24.2 The Contract price shall accordingly be adjusted based on the unit rates available in the Contract for the
change in quantities as above. The base unit rates, as identified in the Contract shall however remain constant
during the currency of the Contract, except as provided for in Clause 33.0 below. In case the unit rates are not
available for the change in quantity, the same shall be subjected to mutual agreement.
26.0 COOPERATION WITH OTHER CONTRACTORS AND CONSULTING ENGINEERS
The Contractor shall agree to cooperate with the Owner’s other Contractors and Consulting Engineers and
freely exchange with them such technical information as is necessary to obtain the most efficient and
economical design and to avoid unnecessary duplication of efforts. The Engineer shall be provided with three
copies of all correspondence addressed by the Contractor to other Contractors and Consulting Engineers of the
Owner in respect of such exchange of technical information, wherever needed.
27.0 NO WAIVER OF RIGHTS
Neither the inspection by the Owner or the Engineer or any of their officials, employees, or agents nor any
order by the Owner or the Engineer for payment of money or any payment for or acceptance of, the whole or
any part of the Works by the Owner or the Engineer, nor any extension of time, nor any possession taken by
the Engineer shall operate as a waiver of any provision of the Contract, or of any power herein reserved to the
Owner or any right to damages herein provided nor shall any waiver of any breach in the Contract be held to
be a waiver of any other or subsequent breach.
28.0 CERTIFICATE NOT TO AFFECT RIGHT OF OWNER AND LIABILITY OF THE CONTRACTOR.
No interim payment certificate of the Engineer, nor any sum paid on account by the Owner, nor any extension
of time for execution of the Works granted by the Engineer shall affect or prejudice the rights of the Owner
against the Contractor or relieve the Contractor of his obligation for the due performance of the Contract, or be
interpreted as approval of the Works done or of the equipment furnished and no certificate shall create liability
for the Owner to pay for alterations, amendments, variations or additional works not ordered, in writing , by
the Engineer or discharge the liability of the Contractor for the payment of damages whether due, ascertained,
or certified or not or any sum against the payment of which he is bound to indemnify the Owner, nor shall any
such certificate nor the acceptance by him of any sum paid on account or otherwise affect or prejudice the
rights of the Owner against the Contractor.
29.0 PROGRESS REPORTS
During the various stages of the work in pursuance of the Contract, the Contractor shall at his own cost submit
periodic progress reports as may be reasonably required by the Engineer with such materials as, charts, net-
works, photographs, test certificates, etc. Such progress reports shall be in the form and size as may be
required by the Engineer.
30.0 TAKING OVER
Upon successful completion of work of erection of tower line by the Contractor, the Engineer shall issue to the
Contractor a completion Certificate as a proof of the final acceptance of the erected line. Such certificate shall
not unreasonably be withheld nor will the Engineer delay the issuance thereof on account of minor omissions
or defects which do not affect the commercial operation and/or cause any serious risk to the erected line. Such
certificate shall not relieve the Contractor of any of his obligations which otherwise survive, by the terms and
conditions of the Contract after issue of such certificate.
C. CONTRACT SECURITY AND PAYMENTS
31.0 CONTRACT PERFORMANCE GUARANTEE
Seal & Signature of Bidder - 43 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
The Contractor shall furnish Contract Performance Guarantee(s) for the proper fulfillment of the
Contract in the prescribed form within fifteen (15) days of “Notice of Award of Contract”. The
performance guarantee(s) shall be as per terms prescribed.
32.1 The payment to the Contractor for the performance of the works under the Contract will be made by the Owner
as per the guidelines and conditions specified herein. All payments made during the Contract shall be on
account payments only. The final payment will be made on completion of all Works and on fulfillment by the
Contractor of all his liabilities under the Contract.
32.2 Currency of Payment
All payments under the Contract shall be in Indian Rupees only.
Payment terms will be as prescribed in the special conditions of contract and on fulfillment of conditions
specified thereof.
33.1 Application for Payment
33.2 The Contractor shall submit application for the payment in the prescribed proforma of the Owner. Performa for
application for payment will be as prescribed.
34.1 Each such application shall state the amount claimed and shall set forth in detail, in the order of the Payment
Schedule, particulars of the Works including the Works executed at Site and of the equipment shipped/brought
on to the site pursuant to the Contract upto the date mentioned in the application and for the period covered
since the last preceding certificate, if any.
34.2 Every interim payment certificate shall certify the Contract value of the Works executed upto the date
mentioned in the application for the payment certificate, provided that no sum shall be included in any interim
payment certificate in respect of the works that, according to the decision of the Engineer, does not comply
with the Contract.
34.3 Mode of Payment
34.4 Payment due on completion of work shall be made by the Owner through Owner’s Bank or directly to the
Contractor as per the payment schedule.
34.5.1 All payments under the Contract shall be made as stipulated in the Special Conditions of Contract after signing
the Contract Agreement.
Progressive payments linked with erection shall only be made after the issue of certificates by the Engineer,
one for the quantum of work completed and the other for the successful completion of quality check points
involved in the quantum of work billed.
35.0 DEDUCTIONS FROM CONTRACT PRICE
All costs, damages or expenses which the Owner may have paid, for which under the Contract the Contractor
is liable, or any other retention award will be claimed by the Owner. All such claims shall be billed by the
Seal & Signature of Bidder - 44 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
Owner to the Contractor regularly as and when they fall due. Such bills shall be supported by appropriate and
certified vouchers or explanations, to enable the Contractor to properly identify such claims. Such claims shall
be paid by the Contractor within thirty (30) days of the receipt of the corresponding bills and if not paid by the
Contractor within the said period, the Owner may then deduct the amount, from any monies due or becoming
due by him to the Contractor under the Contract or may be recovered by sections of Law or otherwise.
D. RISK DISTRIBUTION
37.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may be pertinent to the Works
and obligatory in terms of law to protect his interest and interests of the Owner against all perils detailed
herein. The form and the limit of such insurance as defined herein together with the under-writer in each case
shall be acceptable to the Owner. However, irrespective of such acceptance, the responsibility to maintain
adequate insurance coverage at all time during the period of Contract shall be of Contractor alone. The
Contractor’s failure in this regard shall not relieve him of any of his contractual responsibilities and
obligations. The insurance covers to be taken by the Contractor shall be in the joint name of the Owner and
the Contractor. The Contractor shall, however, be authorized to deal directly with Insurance Company or
Companies and shall be responsible in regard to maintenance of all insurance covers. Further the insurance
should be in freely convertible currency.
37.2 Any loss or damage to the material during handling, transportation, storage, erection, and all activities to be
performed till the successful completion of commissioning of the line shall be to the account of the Contractor.
The Contractor shall be responsible for preference of all claims and make good the damages or loss by way of
repairs and/or replacement of the equipment, damaged or lost. The transfer of title shall not in any way relieve
the Contractor of the above responsibilities during the period of Contract. The Contractor shall provide the
Owner with copy of all insurance policies and documents taken out by him in pursuance of the Contract. Such
copies of documents shall be submitted to the Owner immediately after such insurance coverage. The
Contractor shall also inform the Owner in writing at least sixty (60) days in advance regarding the
expiry/cancellation and/or change in any of such documents and ensure revalidation, renewal etc., as may be
necessary well in time.
37.3 The perils required to be covered under the insurance shall include, but not be limited to fire and allied risks,
miscellaneous accidents (erection risks) workman compensation risks, loss or damage in transit, theft,
pilferage, riot and strikes and malicious damages, civil commotion, weather conditions, accidents of all kinds,
etc. The scope of such insurance shall be adequate to cover the replacement/reinstatement cost of the
equipment for all risks up to and including delivery of goods and other costs till the equipment is delivered at
Site. The insurance policies to be taken should be on replacement value basis and/or incorporating escalation
clause. Notwithstanding the extent of insurance cover and the amount of claim available from the
underwriters, the Contractor shall be liable to make good the full replacement/rectification value of all
equipment/materials and to ensure their availability as per project requirements.
37.4 All costs on account of insurance liabilities covered under the Contract will be on Contractor’s account and
will be included in Contract Price, However, the Owner may from time to time, during the pendency of the
Contract, ask the Contractor in writing to limit the insurance coverage, risks and in such a case, the parties to
the Contract will agree for a mutual settlement, for reduction in Contract price to the extent of reduced
premium amount. The Contractor, while arranging the insurance shall ensure to obtain all discounts on
premium which may be available for higher volume or for reason of financing arrangement of the project.
Seal & Signature of Bidder - 45 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
37.5 The clause entitled ‘Insurance’ under the section ECC of this Volume-I, covers the additional insurance
requirements for the portion of the works to be performed at the Site.
37.6 Special Conditions of Contract details out the various insurance liabilities.
38.0 LIABILITY FOR ACCIDENTS AND DAMAGES
Under the Contract, the Contractor shall be responsible for loss or damage to the plant until the successful
completion of commissioning as defined elsewhere in the Bid document.
39.0 DELAYS BY OWNER OR HIS AUTHORISED AGENTS
39.1 In case the Contractor’s performance is delayed due to any act of omission on the part of the Owner or his
authorized agents, then the Contractor shall be given due extension of time for the completion of the Works, to
the extent such omission on the part of the Owner has caused delay in the Contractor’s performance of the
Regarding reasonableness or otherwise of the extension of time, the decision of the Engineer shall be final.
39.2 In addition, the Contractor shall be entitled to claim demonstrable and reasonable compensation if such delays
have resulted in any increase in cost. The Owner shall examine the justification for such a request for claim
and if satisfied, the extent of compensation shall be mutually agreed depending upon the circumstances at the
time of such an occurrence.
40.0 DEMURRAGE, WHARFAGE, ETC.
All demurrage, warfare and other expenses incurred due to delayed clearance of the material or any other
reason shall be to the account of the Contractor.
41.0 FORCE MAJEURE
41.1 Force majeure is herein defined as anycausewhich is beyond the control of the Contractor or the Owner as the
case may be, which they could not foresee or with a reasonable amount of diligence could not have foreseen
and which substantially affects the performance of the Contract, such as:
a. Natural phenomena, including but not limited to floods, droughts, earthquakes and epidemics;
b. Acts of any Government, domestic or foreign, including but not limited to war, declared or undeclared,
priorities, guarantees, and embargoes.
Provided either party shall within fifteen (15) days from the occurrence of such a cause notify the other in
writing of such causes.
41.2 The Contractor or the Owner shall not be liable for delays in performing his obligations resulting from any force
majeure cause as referred to and/or defined above:
The date of completion will, subject to hereinafter provided, be extended by a reasonable time even though
such cause may occur after Contractor’s performance of obligation has been delayed due to other causes.
42.0 SUSPENSION OF WORK
42.1 The Owner reserves the right to suspend and reinstate execution of the whole or any part of the Works without
invalidating the provisions of the Contract. Orders for suspension or reinstatement of the Works will be issued
Seal & Signature of Bidder - 46 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
by the Engineer to the Contractor in writing. The time for completion of the works will be extended for a
period equal to duration of the suspension.
42.2 Any necessary and demonstrable cost incurred by the Contractor as a result of such suspension of the works
will be paid by the Owner, provided such costs are substantiated to the satisfaction of the Engineer. The
Owner shall not be responsible for any liabilities if suspension or delay is due to some default on the part of the
Contractor or his Sub-Contractor.
43.0 CONTRACTOR`S DEFAULT
43.1 If the Contractor shall neglect to execute the works with due diligence and expedition or shall refuse or neglect
to comply with any reasonable order given to him, in writing by the Engineer in connection with the works or
shall contravene the provisions of the Contract, the Owner may give notice in writing to the Contractor to
make good the failure, neglect or contravention complained of. Should the Contractor fail to comply with the
notice within thirty (30) days from the date of serving the notice, then and in such case the Owner shall be at
liberty to employ other workmen and forthwith execute such part of the works as the Contractor may have
neglected to do or if the Owner shall think fit, without prejudice to any other right he may have under the
Contract to take the work wholly or in part out of the Contractor’s hands and re-contract with any other person
or persons to complete the works or any part thereof and in that event the Owner shall have free use of all
Contractor’s equipment that may have been at the time on the Site in connection with the works without being
responsible to the Contractor for fair wear and tear thereof and to the exclusion of any right of the Contractor
over the same, If the sum that the contractor is entitled to be paid plus the costs incurred by the Owner in
completing the works, exceeds the Contract Price or the entire works if entire works have been completed or
the price for part of the work if part of the works have been completed, the Contractor shall be liable for such
If such excess is greater than the sums due to the Contractor, the Contractor shall pay the balance to the Owner
and if such excess is less than the sums due to the Contractor, Owner shall pay the balance to the Contractor.
For facilitating such payment, Owner shall pay the balance to the contractor. For facilitating such payment,
Owner shall encash the Bank Guarantees of Contactor available with Owner/s and retain such other payment
due to the Contractor under the Contract in question or any other Contract that the Owner/s may have with the
Contractor. Such payment of excess amount shall be independent of the liquidated damages for delay which
the Contractor shall have to pay if the completion of works is delayed.
43.2 In addition, such action by the Owner as aforesaid shall not relieve the Contractor of his liability to pay
liquidated damages for delay in completion of Works as defined in Clause 14.0 of this Section.
43.3 Such action by the Owner as aforesaid the termination of the Contract under this clause shall not entitle the
Contractor to reduce the value of the Contract Performance Guarantee nor the time thereof. The Contract
Performance Guarantee shall be valid for the full value and for the full period of the Contract including
guarantee period.
44.0 TERMINATION OF CONTRACT ON OWNER`S INITIATIVE
44.1 The Owner reserves the right to terminate the Contract either in part or in full due to reasons other than those
mentioned under clause entitled ‘Contractor’s Default’. The Owner shall in such an event give fifteen (15)
days notice in writing to the Contractor of his decision to do so.
Seal & Signature of Bidder - 47 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
44.2 The Contractor upon receipt of such notice shall discontinue the work on the date and to the extent specified in
the notice, make all reasonable efforts to obtain cancellation of all orders and Contracts to the extent they are
related to the work terminated and terms satisfactory to the Owner, stop all further sub-contracting or
purchasing activity related to the work terminated, and assist Owner in maintenance, protection, and
disposition of the works acquired under the Contract by the Owner.
In the event of such a termination the Contractor shall be paid compensation, equitable and reasonable,
dictated by the circumstances prevalent at the time of termination.
44.3 If the Contractor is an individual or a proprietary concern and the individual or the proprietor dies and if the
Contractor is a partnership concern and one of the partners dies then unless the Owner is satisfied that the legal
representatives of the individual Contractor or of the proprietor of the propriety concern and in the case of
partnership, the surviving partners, are capable of carrying out and completing the Contract the Owner shall be
entitled to cancel the Contract as to its incomplete part without being in any way liable to payment of any
compensation to the estate of deceased Contractor and/or to the surviving partners of the Contractor’s firm on
account of the cancellation of the Contract. The decision of the Owner that the legal representatives of the
deceased Contractor or surviving partners of the Contractor’s firm cannot carry out and complete the Contract
shall be final and binding on the parties. In the event of such cancellation the Owner shall not hold the estate of
the deceased Contractor and/or the surviving partners of the estate of the deceased Contractor and/or the
surviving partners of the Contractor’s firm liable to damages for not completing the Contract.
45.0 FRUSTRATION OF CONTRACT
45.1 In the event of frustration of the Contract because of supervening impossibility in terms of Section 56 of the
Indian Contract Act, parties shall be absolved of their responsibility to perform the balance portion of the
Contract, subject to provisions contained in sub-clause 45.3 below.
45.2 In the event of non-availability or suspension of funds for any reasons, whatsoever (except for reason of willful
or flagrant breach by the Owner) and/or Contractor then the works under the Contract shall be suspended.
Furthermore, if the Owner is unable to make satisfactory alternative arrangements for financing to the
Contractor in accordance with the terms of the Contract within three months of the event, the parties hereto
shall be relieved from carrying out further obligations under the Contract treating it as frustration of the
45.3 In the event referred to in sub-clauses 45.1 & 45.2 above the parties shall mutually discuss to arrive at
reasonable settlement on all issues including amounts due to either party for the work already done on quantum
merit_ basis which shall be determined by mutual agreement between the parties.
46.0 GRAFTS AND COMMISSIONS ETC.
Any graft, commission, gift or advantage given, promised or offered by or on behalf of the Contractor or his
partner(s), agent(s), officer(s), director(s), employee(s) or servant(s) or any one on his or their behalf in
relation to the obtaining or to the execution of this or any other Contract with the Owner, shall in addition to
any criminal liability which it may incur, subject the Contractor to the cancellation of this and all other
Contracts and also to payment of any loss or damage to the Owner resulting from any cancellation. The
Owner shall then be entitled to deduct the amount so payable from any monies otherwise due to Contractor
under the Contract.
Seal & Signature of Bidder - 48 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
E. RESOLUTION OF DISPUTES
47.0 SETTLEMENT OF DISPUTES
47.1 Any dispute(s) or difference(s) arising out of or in connection with the Contract shall, to the extent possible, be
settled amicably between the parties.
47.2 If any dispute or difference of any kind, whatsoever, shall arise between the Owner and the Contractor, arising
out of the Contract for the performance of the Works whether during the progress of the Works or after its
completion or whether before or after the termination, abandonment or breach of the Contract, it shall, in the
first place, be referred to and settled by the Engineer, who, within a period of thirty (30) days after being
requested by either party to do so, shall give written notice of his decision to the Owner and the Contractor.
47.3 Save as hereinafter provided, such decision in respect of every matters so referred shall be final and binding
upon the parties until the completion of the Works and shall forthwith be given effect to by the Contractor who
shall proceed with the Works with all due diligence, whether he or the Owner requires arbitration as
hereinafter provided or not.
47.4 If after the Engineer has given written notice of his decision to the parties, no claim to arbitration has been
communicated to him by either party within thirty (30) days from the receipt of such notice, the said decision
shall become final and binding on the parties.
47.5 In the event of the Engineer failing to notify his decision as aforesaid within thirty (30) days after being
requested as aforesaid, or in the event of either the Owner or the Contractor being dissatisfied with any such
decision, or within thirty (30) days after the expiry of the first mentioned period of thirty days, as the case may
be, either party may require that the matters in dispute be referred to arbitration as hereinafter provided.
48.0 ARBITRATION
48.1 All disputes or differences in respect of which the decision, if any, of the Engineer has not become final or
binding as aforesaid shall be settled by arbitration in the manner hereinafter provided.
48.1.1 The arbitration shall be conducted by three arbitrators, one each to be nominated by the Contractor and the
Owner and the third to be appointed as an umpire by both the arbitrators in accordance with the Indian
Arbitration Act. If either of the parties fails to appoint its arbitrator within sixty (60) days after receipt of a
notice from the other party invoking the Arbitration clause, the arbitrator appointed by the party invoking the
arbitration clause shall become the sole arbitrator to conduct the arbitration.
48.1.2 The arbitration shall be conducted in accordance with the provisions of the Indian Arbitration Act, 1940 or any
statutory modification thereof. The venue of arbitration shall be Vadodara.
48.2 The decision of the majority of the arbitrators shall be final and binding upon the parties.
The arbitrators may, from time to time with the consent of all the parties enlarge the time for making the
award. In the event of any of the aforesaid arbitrators dying, neglecting, resigning or being unable to act for
any reason, it will be lawful for the party concerned to nominate another arbitrator in place of the outgoing
48.3 The arbitrator shall have full powers to review and/or revise any decision, opinion, direction, certification or
valuation of the Engineer in accordance with the Contract, and neither party shall be limited in the proceedings
Seal & Signature of Bidder - 49 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
before such arbitrators to the evidence or arguments put before the Engineer for the purpose of obtaining the
48.4 No decision given by the Engineer in accordance with the foregoing provisions shall disqualify him as being
called as a witness or giving evidence before the arbitrators on any matter whatsoever relevant to the dispute or
difference referred to the arbitrators as aforesaid.
48.5 During settlement of disputes and arbitration proceedings, both parties shall be obliged to carry out their
respective obligations under the Contract.
49.0 RECONCILIATION OF ACCOUNTS
The Contractor shall prepare and submit every two months, a statement covering payments claimed and the
payments received vis-a-vis the works executed, for reconciliation of accounts with the Owner. The
Contractor shall also prepare and submit a detailed account of Owner Issue materials received and utilized by
him for reconciliation purpose in a format to be discussed & finalized with the Owner before the award of
Date: Superintending Engineer
(Signature of Contractor) GETCO,C.O., Bharuch
GENERAL CONDITION
A. GENERAL TERMS :-
1. The Gujarat Energy Transmission Corporation Limited does not bind itself to accept the lowest or any tender. The
Superintending Engineer (TR), Bharuch reserves the right to reject any or all tender without signing any reasons
whatsoever and decision of the The Superintending Engineer (TR), Bharuch will be final and unchallengeable.
2. In case of any dispute / doubt, the decision of The Superintending Engineer (TR), Bharuch, shall be
unchallengeable, final and binding to the Contractor.
3. Tender offer without payment of E.M.D/Tender Fee, required Certificate, Documents, bar chart list of Tools,
Tackles, Equipments, blank tender etc. required for execution of job will be out rightly rejected. The tenderer
should furnish details of past experience of such job of similar nature completed by him satisfactorily within the
time limit in GETCO without this certificate offer shall be rejected out rightly.
4. The competent authority can delete any items in schedule of the tender, if he feels that the rate quoted by
contractor act. That item is abnormally high completed to the estimated rates. Specification in any items
mentioned in tender are subject to change without any prior notice and binding to the Contractor.
B. GENERAL TERMS FOR CONTRACTOR :-
1. The erection work should be carried out according to the specification and as per Instructions & programmed laid
out by the DE / Executive Engineer-in-charge of the work. Contractor has to co-ordinate E.I.C. of planning of
outage & work schedule thereof, so as to complete all the planned work in outage. Contractor has to deploy
adequate manpower accordingly.
2. The contractor should appoint supervisor with sufficient qualification and experience who could supervise the
execution of work throughout. He should always be present on the site as far as possible. Qualification &
experience certificate of deputed supervisor to be submitted to GETCO.
3. The erection work should be commenced immediately from the date of receipt of instructions from office and
should be completed within thereafter. Prior intimation in writing for starting the job will be given by GETCO for
Seal & Signature of Bidder - 50 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
4. Cutting, bending, welding, brazing, wherever necessary is to be done by the contractor.
5. The Contractor has to follow all IE rules, Insurance rules, GETCO rules labours laws, safety rules and regulations
at his risk & cost. The GETCO does not take any responsibility in case of accident or injury to the workers. The
safety / security of men, materials & equipments shall be sole responsibility of the contractor. Contractor will
abide by and fulfill all the terms and conditions and general terms and condition of the contract for works available
in the office. All other general terms and conditions as prevailing in the GETCO shall be applicable to this
contract. The contractor will be governed by the GETCO’s general conditions of works contract. The Booklet will
be available in the concerned office in any working days. In the event of placing order, the contractor will have to
sign this booklet along with other documents and agreement. All the usual terms and conditions of the GETCO,
though the same might have not been mentioned in this specification or contractor booklet will applicable to this
contract, and the decision of the Executive Engineer (TR), KIM shall be binding on the contractor.
6. It will be bidder sole responsibility for erection of complete work in all respect, accordance with latest rules under
Electricity Act and approved by Electrical Inspector.
7. The Contractors has to engage required strength of skilled persons for Transportation, Loading & unloading work
and proper Supervisor to avoid complication & unnecessary delay to complete work timely. The Contractor will
be totally responsible for labour claims arising out of the labour employed for this job.
8. The detailed drawings of work can be seen from concern GETCO office during any working day and the material
which are to be erected can also be seen physically at Bharuch/Haldarwa store during any working day and
9. Contractor has to ensure safe shifting and erection of all accessories / equipments as per standard norms.
10. The Contractor has to arrange for minor fabrication (if required) at free cost. The tender includes all minor
accessories and items of work which may not have been specifically mentioned in the specification schedule etc.
but are essential for completion of work. The contractor will not be eligible for any extra payment in respect of
such minor accessories and items of work.
11. The Contractor has to remain in contact in close days with Engineer in charge of work who in turn shall issue
detailed instruction for the commencement of the work.
12. The Contractor will be solely and responsible for any accident / damage either to equipments or any human being
during the time of execution of work.
13. Either you or your authorized person should contact our concern Div office daily, for the availability of material
required for this work, failing to which this work order shall be terminated without giving any notice.
14. The Contractor will have to give indemnity bond to GETCO against any possible claim of compensation for
damage to contractor’s equipments or staff or any of third party during the execution of work.
15. The Contractor will have to complete entire job as per directive and instruction of Engineer in charge. If he fails to
do so entire work will be carried out at Contractor’s risk and cost.
16. The contractor has the experience of survey work and produces the list of survey instrument and bio-data of
Supervisor / Surveyor / Engineer / Technician to be engaged for the job.
17. If the work is required to be carried out during specified outage then the contractor has to deploy adequate man
power, material, tools etc. well advance and has to complete the entire work during this specific outage period
only, failing to which GETCO shall be at liberally to deduct the amount of revenue loss due to prolong outage.
Contractor has to co-ordinate E.I.C. of planning of outage & work schedule thereof, so as to complete all the
planned work in outage.
18. If required by GETCO you shall have to provide free to & for traveling facility to our field Engineer or Surveyor
19. The Contractor shall not refuse to execute the work order at any time and it will be his sole responsibility to
execute and complete this work as per the instruction of Engineer - in - charge.
20. The tender shall invariably furnish a monthly average erection capacity (in km. and rating) along with list of
available machinery, tools and tackles etc. for erection of line.
21. The tenderer shall not submit offer for erection or foundation work.
22. No subcontractor, Power of Attorney shall be allowed.
Seal & Signature of Bidder - 51 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
23. Any excess work done beyond specification and drawing shall be at Contractor’s risk and cost.
24. The bidder shall specifically note that GETCO will not pay any extra amount to wards any type of claim except
for the description indicated in Schedule “B’. The party has to carry out all other / additional required activities /
work as directed by Engineer in charge which is not mentioned in Schedule but required to be completed as per
the site condition and for this work no extra Payment shall be made by GETCO.
25. In addition to the general of the construction particular attention shall be paid to the final finish and every effort
shall be made to have the entire work contented wish standard of workmanship by the Contractor.
26. No any idling / gang mobilization charge will be paid by GETCO in any circumstances.
27. No part rate or reduces rate shall be allowed in final bill.
28. The interpretation of specification doubts etc: - In case of any doubts about what is mentioned in specification
or schedule or elsewhere, the tenderer should get all doubts cleared from the Department in writing and in advance
of filling in the tender. In case of difference of opinion about interpretation of specification etc. the decision of Ex.
Engineer (TR). Bharuch/SE(TR) Bharuch will be final and shall be binding to the contractor to the tenderer.
29. Power supply should be arranged by contractor at his own cost. For that temporary connection to be obtain by
contractor from PGVCL for the said work.
C. SIGNING AGREEMENT:- The Contractor will have to sign an agreement as per GETCO’s rules in the
prescribed form of the GETCO. The cost Rs. 300/- of the Stamp Paper will have to be borne by the Contractor.
D. WORKING DAYS: In case, it is not possible for the contractor to continue, the work either due to heavy rains or
other reasonable causes, such facts should be immediate reasons to the notice of the Executive Engineer in writing.
If the reasons for stopping the work are genuine, the Engineer may ask the contractor in writing to stop work be
cases (for such stoppage) are overcome and the Engineer will ask the Contractor to start the work again in written,
the period of such stoppage will not be considered as a part of working month moreover the contractor cannot
claim compensation for such work. Contractor will not allow to work after working hours except in special case, if
E. TERMS OF PAYMENT:
1. Normally, one R.A. Bills will be paid every month, however, looking to the progress of the work it will be
reviewed mutually and 90% of the cost of work done will be paid to the Contractor on his presentation of R.A. Bill
giving the material account thereof. Remaining 10% Payment will be made after the entire work is completed
satisfactorily in all respect. The Bill should be submitted to concern GETCO’s Executive Engineer (TR),
Bharuch with a copy to Concern SE(TR), Bharuch. Final bill will be prepared by Concern Field Executive
Engineer (TR), KIM within about fortnight from the date of completion of the work by the Contractor.
2. The GETCO will be untitled to deduct directly from the bills to be paid to the contractor any sum or sums payable
by you and which sum/sums the GETCO is required to pay as principle employers on account of your default in
respect of all liabilities referred to in above clauses.
3. In case of any farmer's objection / ROW, contractor has to mobilize his all efforts to clear the objection in
consultation with GETCO authority. No extra Charge will be paid for such effort.
4. The contactor shall co-operative with the GETCO in recording measurement etc. as expeditiously as possible and
he shall fulfill all the requirement which are necessary to finalizes the accounts on the basic of its records and pay
him such amounts as if found due to him, together with the amount of security deposit if any remaining payable to
him after deduction there from the amount due by him to the GETCO. The GETCO shall not entertain further
claim from thereafter.
5. THE GETCO shall deduct the Income - Tax & Taxes as per prevailing rules from each and every bill.
6. All the bills for erection, separately for each line should be presented with the following information on each bill.
(i) 90% bills for erection should be serially numbered giving the work done under each item up to period of billing,
work done for which the claim is made in the bill and up to date work so for done. Items in erection bill should
correspond to items mentioned in schedule of A/T.
(ii) Balance payment bills should be prepared at the end of the job for each section under the jurisdiction of the
concerned Deputy Engineer which should give the complete information of work carried out, total payment due,
Seal & Signature of Bidder - 52 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
actual payment received up to date and the balance amount claimed, It should also accompany a statement of
reconciled material account tower wise and line wise.
7. 10% retention money will be deducted from each R.A. bill.
8. No higher rate or revised rate will be applicable for the work, if work is held-up / closed due to whatever so
9. R.A. Bill shall be paid if GETCO satisfy with the output of works otherwise only final bill shall be paid.
10. The cost of damages, if any will be recovered from the Contractor’s bill. The assessment of which will be done by
field Engineer at his sole discretion and his decision shall be binding to the contractor and shall be considered as
final and unchallengeable.
11. The contractor shall co-operate with the GETCO in recording measurement etc. as expeditiously as possible and
he shall fulfill all the requirements which are necessary to finalize the accounts on the basis of its records and pay
him such amount as if found due to him together with the amount of security deposit. If any remaining payable to
him after deduction there from the amount due by him to the GETCO.
12. The contractor will not be eligible for any extra payment in respect of minor accessories and items of work.
F. AVAILABILITY OF MATERIALS AND IDLE LABOUR CHARGE: Materials are readily available and
arrangement made to procure the rest. However, the Contractor should be carrying out the work as and when the
materials are received. No idle labour charges will be bourned by the GETCO in case such occasion of idle labour
arises, due to want of any materials. However, this idle period will be counted for the period of assessing the time
limit for completion of work as mentioned in the work order. Contractor has to collect the material as and when
available and should be keeping in his safe custody.
G. PROGRESS OF WORK & REPORTING :
1. Contractor has to submit their working schedule along with tender to complete the line in view of time limit given
in tender Bar chart is also to be submitted.
2. PROGRESS REPORT: Fortnightly progress reports in DUPLICATE shall be regularly submitted to the
Executive Engineer (TR), Bharuch and the concern Engineer-in-charge with a copy to SE,(TR) Bharuch. Bar
chart duly signed by contractor shall be submitted at the time of commencement of work.
H. MATERIAL, DELIARY & HANDLING :
1. All material / equipment required for this work as per schedule shall be delivered at any store center of GETCO
jurisdiction & contractor has to take delivery from these stores at his own cost only.
2. The contractor shall be responsible for breakages, losses & thefts of material during transit or erection after the
materials are issued from stores will, the completed work is taken over by the GETCO.
3. The contractor will be responsible for loss, distribution or deterioration of the materials, stores or articles supplied
to him by the GETCO, even if such a less distribution of deterioration has occurred under any circumstances
whatsoever beyond his control as if the materials, stores or articles so supplied were his property.
4. STORAGE-CUM-INSURANCE:- The contractor shall take suitable storage-cum-erection insurance cover at his
cost to the extent of 100% cost of s/s or line materials, which are required to complete the s/s or line. Contractor
shall have to take Marine cum Erection (MCE) insurance policy against any loss, damage, theft, pilferage, fire etc.
for the complete period of storage, erection and commissioning up to the time of taking over of the transmission
line or S/S by the Board. The contractor shall deal directly and pursue the claim with the insurance company and
shall be responsible in regard to maintenance of all insurance coverage as well as for settlement of claim. The
proof of insurance policy taken by the successful contractor shall be furnished to Engineer-In-Charge.
No material shall be issued to bidder/erection agency in absence of such insurance policy. The risk shall be
covered for lifting of material from store to final handling over to GETCO. Further In absence of the above
insurance policy, R. A. Bill payment will be with held.
5. RETURN OF EMPTY CONDUCTOR DRUMS: The empty wooden drum of earth wire and conductor as well
as insulator crates will not be required to be returned back by the contractor to the GETCO stores.
6. ACCOUNTING OF GETCO MATERIALS: - The contractor will be fully answerable and responsible for all
the material issued to him for the work by the GETCO for any theft, loss of pilferage and shall have to furnish
account for the same after completion of the work and before preparation of final bill, If the loss referred to above
Seal & Signature of Bidder - 53 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
is not made good before final bill as per rules of the GETCO. Contractor has to maintain Site Register Material
Account Register regularly.
7. The structure & equipment required for line erection work shall be delivered at central store by GETCO at free of
cost and it must be shifted to site without damaging the equipment must be kept in position as per instruction of In
charge Engineer and Manufacturer’s manual. The M.S. Girder required for line erection work will be provided at
one end of the line by GETCO. The trip of Girder should be of minimum 20 Girders.
8. The Contract has to shift the material at site with packing case and it should open carefully without damaging the
equipment. The packing case must be returned to the store in good condition and stacked as directed by Engineer-
9. The equipments must be cleaned, washed if required before erection. The initial testing wherever required should
be carried out first with the help of Engineer-in-charge before erection, such as measuring continuity test or any
other test found necessary.
10. THE GUJARAT ENERGY TRANSMISSION CORPORATION LTD. shall supply Steel Section required, for
earth mesh / structure / G.I. / M.S. strip for earthings the equipments structures with nut and bolts, power cable,
control cable, L.T. cable, Clamps connectors and C.I. Plate for small pit etc. at free of cost subject to condition
mentioned in schedule-B.
11. Wooden charcoal, salt, black cotton soil, G.I. pipe, G.I. strip, G.I. wire, nut & bolts lugs etc. required for earthing
shall be procured by the contractor as per specification given is Schedule B.
12. Contractor will fully and solely responsible for any shortage, damage, leakages to the equipments or any it’s
accessories that may occur during transportation dragging, draining of oil, erection work etc.
13. In case of non - availability of some items / materials you will have to collect the same from other nearly store
center for which you shall be paid as per GETCO’s rules and S.O.R. rate.
14. After completion of the work, all the surplus materials issued by the GETCO shall be returned by you to the
respective center of the GETCO as per instruction of Engineer in charge at your cost.
15. For shortages of any materials issued by the GETCO for the work, recovery shall be made from you, on the basis
or prices of the materials (prevailing the date of settlement of materials Account) plus 15% supervision charges.
16. All the materials issued by GETCO shall be transported to the work site on same day and to be preserved in safe
custody failing to which GETCO shall initiate Police actions, similarly as per instruction of Engineer-in-charge,
you have to credit the material at GETCO store without any loss of time failing to which GETCO shall initiate
17. Accounts of Materials issued :- The contractor shall have to maintain accurate day to day and item wise account
of use of issued materials which shall be got checked from time to time by the representative of the GETCO. The
contractor will be responsible for custody and preserving the issued materials till the work is handover by the
Contractor after completion.
18. The contractor has to maintain site Register, covering all the daily details of Material receipt & utilization,
progress of work etc. This register shall be checked and signed by Engineer in charge, Executive Engineer (AM),
KIM & SE (TR), Bharuch during the site visit. Any bill without site register shall not be passed. The GETCO
shall not entertain further claim from thereafter.
1. No tools, tackles, manpower, crane facilities etc. will be provided by the GETCO.
2. No special tools and tackles such as compression joint machine, jointing dies, come along clamps, dynamo meter
etc. shall be given by GETCO.
3. Erection tools required during construction of lines shall be arranged by the contractor at his own cost. Adjustable
stub templates will however be supplied by the GETCO which shall be returned by the contractor in Good
condition on completion of the works.
4. Contractor will have to make his own arrangement for all tools, tackles, wire ropes etc. for the work.
5. The contractor has to submit the list of tools, tackles, equipments with him along with his tender offer. The tender
without this list and other required documents (as mentioned above herein the tender) should be rejected out
Seal & Signature of Bidder - 54 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
J. ELECTRICITY RULES : All works shall be carried out in accordance with the revised and latest providing
under Indian Electricity Act and Rules made the rounder.
K. INSPECTION BY GETCO REPRESENTATIVES:
The Engineer-in-charge, higher authority of GETCO or his representatives will be free to visit the contractor’s
work, their stores site and erection sites and also verify the GETCO’s materials in the custody of the contractor as
and when required.
L. FORCE MAJEURE :-
1. Force majored is defined as “Any cause which is beyond control of contractor or the GETCO as the case may be,
natural phenomena like floods, draught, - earthquake, epidemics etc. acts of any Government Authorize domestic
or foreign including but not limited to war, declare or undeclared, priorities quarantine, embargoes Licensing
control or production or distribution restrictions accidents like Fire, Explosions, Break-Downs etc.”.
2. All legal complication or disputes are subject to Bharuch jurisdiction only.
3. As the case may be, which they could not foresee or with a reasonable amount of diligence could not have
foreseen and which substantially affects the performance of the contract such as:
4. Natural phenomena including but not limited to floods, droughts, earthquakes and epidemics;
5. Acts of any Government, domestic or foreign including but not limited to war, declared or undeclared, priorities,
guarantees and embargoes.
6. Provided either party shall within fifteen (15) days from the occurrence of such a cause notify the other in writing
of such causes.
7. The contractor or the owner shall not be liable for delays in performing his obligations resulting from any force
majeure cause as referred to and/or defined above.
M. QUANTITY OF WORK : The quantities of various items of erection indicated in Schedule-B are tentative, final
quantities shall be determined after completion of the details route surveys. The contractor has to carry out the
work according to quantities as determined at site for which the rates quoted in the Tender shall be valid. The
department reserves the rights for revising or omitting any of the quantities. The quantities actually executed by
the contractor will be calculated at the rate given in the contract schedule of the rates. The payment shall be made
only on actual work executed or order quantity whichever is less.
N. TAKING DELIVERY AND INSURANCE:
1. As regard damage the materials, equipment and worker of the contractor, he himself will be responsible. If there
is any compensation to be paid in respect of “WORKMAN” compensation act of any other statutory provisions,
the same will have to be paid by the contractor direct. If he thinks fit he may take necessary insurance cover, at
2. The contractor has to keep ‘H’ frame materials & line materials in safe custody and transport to the respective sites
and will be fully responsible for any damage to or loss of all materials at any stage during transportation or
erection or taking over of the line by GETCO.
3. The Contractor has to open site store near by the route of the line and ensure for safe custody of all the stored
materials at his own cost.
4. The contractor shall have total responsibility for the entire materials stored, loose, semi assembled and/or erected
by him at site in his custody. The contractor shall make suitable security arrangement at his own cost to ensure the
protection of all materials, equipment and works from theft, fire pilferage and any other damages and loss. It shall
be the responsibility of the contractor to arrange for security till the works are finally taken over by the
5. EQUIPMENT INSURANCE: - Contractor shall have to take comprehensive insurance policy against any loss,
damage, theft, pilferage, fire etc. to the material for the complete period of erection and commissioning up to the time
of taking over of the Sub Station / transmission line by the Board. The contractor shall deal directly and pursue the
claim with the insurance company and shall be responsible in regard to maintenance of all insurance coverage as well
as for settlement of claim. The proof of insurance policy taken by the successful contractor shall be furnished to
Engineer-In-Charge. In absence of the above insurance policy, R. A. Bill payment will be with held.
Seal & Signature of Bidder - 55 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
6. In the event of any damage, theft, loss, pilferage, fire etc. contractor will be responsible to lodge, pursue and settle
all the claims with the insurance company for all items, materials and the corporation shall be kept informed about
it. Contractor shall replace the lost/damaged materials/items promptly irrespective of the settlement of the claims
by underwriter and ensure that the work progress is as per agreed schedule. The loss, if any, such replacement will
have to be borne by the contractor and Board will not entertain any claim/representation in this regard. However it
will be contractor’s responsibility to insure the entire project till the line is taken over by the Board.
O. DEPARTURE FROM SPECIFICATION AND DRAWINGS:- Should the tenderer wish to depart from the
specification in any respect, they should draw attention to such departure giving his reasons thereof and should get
approved the same before doing any further work, unless this is done this specification shall held good. The
working drawings are attached with the tenders. However in case of any clarification the decision of Engineer in
charge will be final & binding to the Contractor.
P. TESTING AND COMMISSIONING :
1. The contractor after completion of erection work will ensure that all works connected with line have been
completed correctly as per Indian Electricity Rule and procedure, any extra cost involved due to incompleteness of
work or bad workmanship found out subsequently shall be set right forth with by the contractor at his cost. The
clearances at major crossing & earthing resistance value of H-frame / tower footing to be taken & data to be
handed over to EIC.
2. After the erection is completed in all respects, the line should be thoroughly patrolled and checked for continuity
and clearances. The line should be meggered to check its insulating level. Afterwards, a line clear should be given
to the Engineer-in-charge that the line is clear and free of men and materials and is fit to be charged. If on charging
the line is found not to hold, the contractor should arrange to patrol the line and find out the causes for the tripping
and rectify the defects.
Q. TECHNICAL PARTICULARS : The general technical details of the type of towers to be erected conductors
and earth wire to be strung and relevant loading particulars for the same are given in section of the specification.
R. PROTECTION OF WORK
The Contractor shall have total responsibility for protecting his works till it is finally taken over by the
Engineer. No claim will be entertained by the Owner or by the Engineer for any damage or loss to the
Contractor’s works and the Contractor shall be responsible for complete restoration of the damaged works to
original conditions to comply with the specification and drawings.
V. EMPLOYMENT OF LABOUR
1. The Contractor will be expected to employ on the work only his regular skilled employees with experience of his
particular work. No person below the age of eighteen years shall be employed.
2. All traveling expenses including provisions of necessary transport to and from Site, lodging, allowances and other
payments to the Contractor’s employees shall be the sole responsibility of the Contractor.
3. In case the Owner becomes liable to pay any wages or dues to Labour or any Government agency under any of the
provisions of the Minimum Wages Act, Workmen Compensation Act, Contract Labour Regulation Abolition Act
or any other law due to act of omission of the Contractor, the Owner may make such payment and shall recover
the same from the Contractor’s bills.
W. FACILITIES TO BE PROVIDED BY THE OWNER
1. Space : Land for Contractor’s Store, Workshop etc.
a) The Engineer shall at his discretion and for the duration of execution of the Contract make available at site, land for
construction of Contractor’s field office, workshop, stores, etc. required for execution of the Contract. Any such
temporary construction shall be done by the Contractor at his cost. b) On completion of work the Contractor shall
hand over the land duly cleaned to the Engineer. Until and unless the Contractor has handed over the vacant
possession of land allotted to him for the above purpose, the payment of his final bill shall not be made.
2. Tools, tackles and scaffoldings
The Contractor shall provide all the construction equipments; tools, tackles and scaffoldings required for pre-
assembly, erection, testing and commissioning of the equipment covered under the Contract. He shall submit a
Seal & Signature of Bidder - 56 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
list of all such materials to the Engineer before the commencement of work at Site. These tools and tackles shall
not be removed from the Site without the written permission of the Engineer.
The Contractor shall provide necessary first-aid facilities for all his employees, representatives and workmen
working at the Site. Enough number of Contractor’s personals shall be trained in administering first-aid.
4.Cleanliness The Contractor shall be responsible for keeping the entire area allotted to him clean and free from
rubbish, debris etc. during the period of Contract. The Contractor shall employ enough number of personnel to
keep the work area clean. Materials and stores shall be so arranged to permit easy cleaning of the area. In areas
where equipment might drip oil and cause damage to the floor surface, a suitable protective cover of a flame
resistant, oil proof sheet shall be provided to protect the floor from such damage.
5. LINES AND GRADES All the works shall be performed to the lines, grades and elevations indicated on the
drawings. The Contractor shall be responsible to locate and lay-out the works. Basic horizontal and vertical
control points will be established and marked by the Engineer at site at suitable points. These points shall be used
as datum for the works under the Contract. The Contractor shall inform the Engineer well in advance of the times
and places at which he wishes to do work in the area allotted to him so that suitable datum points may be
established and checked by the Engineer to enable the Contractor to proceed with his works. Any work done
without being properly located may be removed and/or dismantled by the Engineer at Contractor’s expense.
6. FIRE PROTECTION The work procedures that are to be used during the erection shall be those, which
minimize fire hazards to the extent practicable. Combustible materials, combustible waste and rubbish shall be
collected and removed from the Site at least once each day. Fuels, oils and volatile or inflammable materials shall
be stored away from the construction and equipment and materials storage areas.
7. All the Contractor’s supervisory personnel and select number of workers shall be trained for firefighting. Enough
of such trained personnel must be available at the Site during the entire period of the Contract.
The Contractor shall have total responsibility for all equipment and materials in his custody/stores,
loose, semi-assembled and/or erected by him at Site. The Contractor shall make suitable security
arrangements ensure the protection of all materials, equipment and works from theft, fire, pilferage and any
other damages and loss.
9.PRE-COMMISSIONING TRIALS AND INITIAL OPERATIONS
The pre-commissioning trials and initial operations of the equipment furnished and erected by the Contractor
shall be the responsibility of the Contractor as detailed in relevant clauses of Technical Specifications. The
Contractor shall provide, in addition, test instruments, calibrating devices, etc and labour required for successful
performance of these trials. If it is anticipated that the above test may prolong for a long time, the Contractor’s
workmen required for the above test shall always be present at Site during such trials.
SIGNATURE OF CONTRACTOR
WITH SEAL/STAMP
SPECIAL TECHNICAL CONDITION:_
1. All erection work is to be carried out as per the manual of OEM (Original equipment manufacturer), FQP,
approved drawing, specification and instruction of E.I.C.
Seal & Signature of Bidder - 57 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
2. All erection work includes erection insurance to be arranged by the contractor at his cost.
3. All the required tools and tackles like compression jointing machine for conductor, earth wire, cutting
machine, welding set, drill machine, etc are to be arranged by the contractor at his cost.
4. All the work related to the transmission line like detailed survey, check survey, tower/DP foundations,
material testing, tower/DP erection, stringing, final testing, etc should be carried out as per GETCO'S
standard FQP for transmission line.
5. Successful bidder has to appoint site engineer to maintain site register and FQP as per ISO
6. All work should be done according to ISO & FQP and all required documents including filled FQP, testing
results, etc should be submitted while handing over the line.
7. While calculating the weight of stub-setting, the weight of stub, cleat & templetes shall also be added in stub
8. The rates are with supply of cement by the contractor.
9. Red oxide & zinc rich paint shall be applied after tack welding of nuts.
10. The rate indicated includes taking delivery of all stringing material Board's stock at destination keeping
them in safe custody and transporting the same to erection site
11. Contractor has to ensure safe shifting dragging erection of all equipments to comply with labour laws I.E.
12. Earthing pit activities should be done in such a way in presence of GETCO supervisor that final earthing pit
resistance should be record as per standard. All expenditure like sufficient watering to maintain earth
resistance up to the mark should be born by contractor.
13. Contractor has to make arrangement for skill labours for assisting to commissioning engineer as an when
require as per instruction of Engineer in charge.
14. After completion of project successful bidder has to submit all the records like Final as build check survey,
profile, clearance, foundation register, soil classification record, stringing chart, material inventory sheet etc
in hard and soft copy for handing over the project.
15. All items / materials shall be installed / erected in accordance with specified manuals /technical guide lines
of the manufacturer and as per instruction of EIC.
16. Successful bidder has to appoint site engineer to maintain site register and FQP as per ISO.
17. All work should be done according to ISO & FQP and all require documents including filled FQP, testing
results, etc should be submitted while handing over the project.
18. Contractor has to submit the planning bar chart before starting the work in kickoff meeting.
19. Contractor has to complete all the work related to this title in stipulated outage period as per instruction of
Technical Specification
1. Laying of MS round bar in switch yard and fixing to the structure to be in line level and in plumb as per
instruction of Engineer-in-charge.
2. If any damaged to equipment due to bad workman ship (Loose connection of earth strip/MS round bar) then
it is responsibilities of Contractor to bet replace damaged equipment at his cost.
3. After taking delivery of the structures from GETCO stores than contractor is fully responsible for safe custody
and theft, which will be at, Contractor’s cost till completion.
4. During erection due care is to be taken for any damage to any equipment inside the S/S yard and any damage
to the equipment is at Contractor’s Cost.
5. Required tools, tackles, ropes, spanners and skilled labors etc. are to be arranged by the Contractor at his cost.
Seal & Signature of Bidder - 58 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
6. If any minor fabrication / modification is required during erection to the structure i.e. holes, cutting, which is
to be carried out by the Contractor at free of cost.
7. Any loose materials which an obstacle during the erection is to be shifted by the contractor for which no extra
charge is to be paid.
8. Earthing pits are to be excavated as per standard drawing and as per instruction of Engineer-in-charge of s/s.
9. Generally in rocky / soft rock strata mesh type earthing are to be provided from scrap / flat which will be
given to the contractor at free of cost for which account to be submitted and necessary fabrication welding,
joining with pipe is to be done by the contractor.
10. Back filling and watering of earthing pits is to be done in the presence of GETCO Supervisor only.
11. Contractor has to arrange watering in such way that resistivity of each pit should come to the required limit.
12. For laying of MS round bar inside the sub-station yard for equipment and s/s structure contractor has to
carried out as per specification is to be laid properly by making welding joint and bolted where ever
13. structure contractor has to be carried out as per the specification is to be laid properly by making welding
joint and bolted wherever is required.
14. In case of hard strata contractor has to fill-up earthing trench after laying of strip by black cotton soil.
15. All earthing joints are to be welded with structure of equipment by means of proper welding and Not-bolt
with structure and with the earthing pits. All the welded joints are to be painted with Zinc rich paint.
16. All earthing joints including the earthing trench are to be made over lapped with earthing strip.
17. The earthing mat laying should be done as per drawing No: GETCO/E/1S-095/P-010.
18. Arrangement of maintenance free treated earth pit as per drawing No: GETCO/E/STD/P-021 (1 of 2) R-2 dtd
19. Equipment earthing should be done as per drawing No: GETCO/E/06S/STD/P-012 (sheet 1 to 24).
General conditions for Erection of 66kv Mesh Earthing Grid
1. The erection work should be carried out according to the specification and as per instructions and
programmed laid out by the Executive Engineer-in-charge of the work.
2. The erection work should be commenced immediately from the date of receipt of instructions from office and
should be completed within thereafter.
3. The tenders shall remain open for acceptance at least for a period of four months from the date of opening of
4. The Gujarat Energy Transmission Corporation Limited does not bind itself to accept the lowest or any tender.
The Superintending Engineer (TR), Gondal reserves the right to reject any or all tender without signing any
reasons whatsoever.
5. The contractor should employee as Supervisor with sufficient qualification and experience who could
supervise the execution of work thought. He should always be present on the site.
6. The erection work should be commenced immediately from the date of receipt of instructions from office and
should be completed within thereafter.
7. The Contractor shall take all requisite & necessary care to observe that no damage is occurred to the Existing
structures, if any. For any damage to the Existing structures of Gujarat Energy Transmission Corporation
Ltd. The Contractor shall be held responsible.
8. As regard damage the materials, equipment and worker of the contractor, he himself will be responsible. If
there is any compensation to be paid in respect of “WORKMAN” compensation act of any other statutory
provisions, the same will have to be paid by the contractor direct. If he thinks fit he may take necessary
insurance cover, at his cost.
Seal & Signature of Bidder - 59 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
9. The tender includes all minor accessories and items of work which are not have been specifically mentioned
in the specification schedule etc. but are essential for completion of work. The contractor will not be eligible
for any extra payment in respect of such minor accessories and items of work.
10. SITE VISIT:- The bidder is advised to visit the site and examine the site condition. Where in the work is
proposed to be carried out and to get himself fully acquainted at his own responsibility for all information
that may be necessary for quoting the tender bind and entering in to contract. All cost and liabilities arising
out of the site visit shall be at bidder account.
11. Tenderer should be qualified only who have submitted all the required documents as mentioned in tender
12. The contractor has to remain in close day to day contact with Engineer in charge of work who will issue
detailed instruction for the commencement of the work.
13. All the safety regarding human life and as per I.E. rules is to be observed by contractor and regarding any
violation of these GETCO will not take any responsibility.
14. The GETCO will not be liable for the infringement of rules described under work man compensation due to
injuries and accident to the work man etc. contractors have to observe and comply with various provisions
under above Act etc.
15. The contractor will have to complete entire job as per directive and instruction of Engineer in charge. If he
fails to do so entire work will be carried out at contractor’s risk and cost.
16. After completion of the work, all the surplus materials issued by the GETCO shall be returned by you to the
respective center of the GETCO as per instruction of Engineer in charge at your cost.
17. Specification in any items mentioned in tender are subject to change without any prior notice and binding to
the contractor.
18. The contractor shall co-operate with the GETCO in recording measurement etc. as expeditiously as possible
and he shall fulfill all the requirements which are necessary to finalize the accounts on the basis of its
records and pay him such amount as if found due to him together with the amount of security deposit. If any
remaining payable to him after deduction, there from the amount due by him to the GETCO. The GETCO shall
not entertain further claim from thereafter
19. The contractor shall not refuse to execute this work order at any time and it will be his sole responsibility to
execute and complete this work as per the instruction of Engineer in charge.
20. The tender includes all minor accessories and items of work which may not have been specifically
mentioned in the specification schedule etc. but are essential for completion of work. The contractor will not
be eligible for any extra payment in respect of such minor accessories and items of work.
21. Laying of MS Round bar of various size in trench as per specification and instruction of EIC.
22. Cutting, bending, welding, brazing, wherever necessary is to be done by the contractor as per instruction of
23. All other general terms and conditions as prevailing in the GETCO shall be applicable to the contract.
24. The cost of damages, if any will be recovered from the Contractor’s bill. The assessment of which will be
done by filed Engineer at his sole discretion and his decision shall be binding to the contractor and shall be
considered as final and unchallengeable.
25. The contractor has to carry out the work as per specification, instruction & direction of Engineer In charge.
26. Any damage to the existing cable trenches, foundations, walls, water pipe line, etc. should be rectified by the
concern contractor at his own cost & should be made as per original.
27. SUPPLY OF MATERIALS BY GETCO:-
Material of GI strips of 50x 6mm, Round bar will be provided by GETCO. For Earthing GETCO will supply
only G. I. Strip & Scrap for mesh, remaining materials such as salt-cock pipe etc. is to be supplied by the
28. MATERIALS TO BE SUPPLIED BY THE CONTRACTOR:
Seal & Signature of Bidder - 60 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
All GI/ MS nut bolts, welding rods, Earthing pit’s cover, block cotton soil, wood charcoal, salt, cement, sand,
Bentonite powder, Aluminum paint, anti-corrosive zinc rich paint, Cast iron pipe of inner Dia-
100mm,thickness-13mm,length-3000mm and other which is required for complete whole job.
29. The Contractor will be governed by The GETCO’s general conditions of works contract. The Booklet will be
available in the concerned office in any working days. In the event of placing order, the contractor will have
to sign this booklet along with other document and agreement. All the usual terms and conditions of the
GETCO, through the same might have not been mentioned in this specification or contractor booklet will
applicable to this contract, and the decision of the Superintending Engineer shall be binding on the
30. After completion of the work, all the surplus materials issued by the GETCO shall be returned by you to the
respective center of the GETCO as per instruction of Engineer in charge at your cost.
31. If the work is required to be carried out during fix outage then the contractor has to deploy adequate man
power, material, tools etc. well in advance and has to complete the entire work during this specific outage
period only, failing to which GETCO shall be at liberally to deduct the amount of revenue loss due to prolong
32. If required by GETCO you shall have to provide free to and fro traveling facility to our Junior Engineer or
Technical staff for the work.
33. The tender include all minor accessories and items of work which may not have been specifically mentioned
in the specification/ Schedule etc but are essential for completion of work. The contractor will not be
eligible for any extra payment in respect of such minor accessories and item of work.
34. The contractor shall not refuse to execute the work order at any time and it will be his sole responsibility to
execute and complete this work as per the instruction of Engineer in charge.
35. The contractor has to carry out all the works in accordance with revised and latest provision under I.E. Rules
Act made there under and as per instruction of Engineer in charge.
36. Contractor has to co-ordinate E.I.C. for planning of outage and work schedule thereof, so as to complete all
the planned work in outage. Contractor has to deploy adequate manpower accordingly.
37. No tools, tackles, manpower, crane facilities etc will be provided by the GETCO.
38. The contractor has to follow all labour laws, safety rules and regulations. The GETCO does not take any
responsibility in case of accident or injury to the workers. The safety/ security of men, materials and
equipments shall be sole responsibility of the contractor.
39. The contractor has to submit the list of tools, tackles, equipments with him along with his tender offer. The
tender without this list and other required documents (as mentioned above herein the tender) should be
rejected out rightly.
40. Drawings: Drawings issued with the tender are indicative and for tender purpose only. Bidders shall have to
execute the work as per approved construction drawings released from time to time by GETCO and Based
on drawings submitted by GETCO to contractor.
41. It will be bidder’s sole responsibility for erection off complete line/ equipment in all respect as per the
provision of I.E. Rules and procedures and as per the instruction of Engineer in charge.
42. In addition to the general of the construction particular, attention shall be paid to the final finish and every
effort shall be made to have the entire work contented with standard of workmanship by the contractor.
(a)Electricity Rules:- All the works shall be carried out in accordance with latest rules Under Electricity Act.
(b)Testing:- Complete installation shall be put to the necessary test as required and should be approved by
Government Electricity Inspector.
(c)The interpretation of specifications doubts etc.:- In case of any doubts about what is mentioned in
specification or schedule or elsewhere, the tenderer should get All doubts cleared from the Department in
writing and in advance of filling in the Tender. In case of difference of opinion about interpretation of
specification etc the decision of Superintending Engineer will be final and shall be binding to the contractor.
Seal & Signature of Bidder - 61 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
(d)The contractor has to maintain site register, covering all the daily details of Material receipt and utilization,
progress of work etc. This register shall be checked and signed by engineer in charge and Executive
Engineer during the site visit. Any bill without site register shall not be passed.
44. The erection work should be carried out according to the specification and as per instruction and
programme laid out by the Executive Engineer in charge of the work.
45. The contractor shall be responsible for breakages, losses and thefts of material during transit or erection
after the materials issued from the stores till the completion of work and are taken over by the GETCO. The
erection work should be commenced within seven days from the date of receipt of instruction from the
office of the GETCO and should be completed within the time limit thereafter.
46.The contractor will be responsible for the loss, distribution of deterioration of the materials, stores or
articles supplied to him by the GETCO, even if such a loss distribution or deterioration has occurred under
any circumstances whatsoever beyond his control as if the materials, stores or articles so supplied were his
47. The contractor shall co-operate with the GETCO in recording measurement etc as expeditiously as possible
and he shall fulfill all the requirements which are necessary to finalize the accounts on the basis of its
records and pay him such amount as if found due to him together with the amount of security deposit. If any
remaining payable to him after deduction there from the amount due by him to the GETCO. The GETCO shall
not entertain further claim from thereafter.
48. The competent authority can delete any item in schedule of the tender, if he feels that the rate quoted by the
contractor for that item is abnormally high when compared to the estimated rates.
49. The contractor shall not refuse to execute this work order at any time and it will be his sole responsibility to
execute and complete this work as per the instruction of Engineer in charge.
50. Notice for unsatisfactory progress:
If the progress or a particular portion of the work is unsatisfactory the Executive Engineer Whose decision
shall be final, shall notwithstanding that the general progress of work is satisfactory be entitled to take
action under Clause 4(c) after giving the contractor 10 days notice in writing and the contractor will have
no claim for compensation for any loss sustained by him owing to such actions.
51. Alteration in Specifications and Designs not to invalidate Contracts.
The Executive Engineer shall have powers to make any alteration, or addition to the Original specification
designs, and instructions that may appear to him to be necessary or advisable during the progress of the
work and the contractor shall be bound to carry out the work in accordance with any instructions in this
connection which may be given to him in writing, signed by the Engineer-incharge and such alterations shall
not invalidate the contract. Any additional work which the contractor may be directed to do in the manner
above specified as part of the work shall be carried out by the contractor on the same conditions in all
respect on which he agreed to do the main works, and at the same rates as are specified in the tender for the
main work. Where, however, the works is to be executed according to the designs, drawing and specifications
recommended by the contractor and accepted by the competent authority, the alteration above referred to
shall be within the scope of such designs, drawings, and specifications appended to the tender.
52. Contractor not to dispose off soil etc.:
The contractor shall not sell or otherwise dispose off or remove except for the purpose of this contract the
sand, ballast, earth, rock or other substances or materials that may be obtained from any execution made for
the purpose of this contract or produce upon the site at the time of delivery of the possession of the land but
also such substances materials & produce shall be the property of the GETCO & shall be disposed off in the
manner & place as directed by the GETCO‟s Engineers.
53. Cleaning up:
The contractor shall at all time keep the construction areas & his labour colony & storage areas free from
accumulation of waste, or rejected materials. 17.0.2 Prior to the completion of the work the contractor shall
remove all rubbish from & about the premises, & tools, tackles, machinery, left out materials consumable,
Seal & Signature of Bidder - 62 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
rejected materials, scaffolding etc. which are not the part of the permanent work/structure. The premises
will be left fully satisfactorily to the GETCO‟s Engineers/representatives; thereafter only the completion
certificate will be issued.
54. You will ensure that completion of erection work i.e. all works connected with earthing having been
completed correctly as per Indian Electricity Rules & procedure. Any extra cost involved due to
incompleteness of work or bad workmanship found out subsequently shall be set right forth with by you at
Superintending Engineer (TR),
Transmission Circle Bharuch
Bay materials will be issued from following Store Centers:
Sr. Store Centers for issue of line
1 Work of Providing Maintenance free treated earth Bharuch Const Store /Haldarwa
Electrodes at various substation under KIM AM Store
Division under Bharuch TR Circle
Note: Generally, all required materials will be issued form above store centre. In case of non-availability of some items,
contractor shall have to collect from other nearby store centers without extra cost to the GETCO.
Scope of work to be included:
Bidder shall be note that material/equipment shall be issued from Above store and Bidder shall arrange loading,
unloading, transportation from Above store to work site.
Seal & Signature of Bidder - 63 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
(Non Judicial Stamp Paper of Rs. 300/-)
KNOW ALL MEN BY THESE PRESENTS that we, Messer’s ___________________
_____________________________________________________ (hereinafter called “the Contractor” which
expression shall, where the context so admits, include their heirs, executors, administrators and legal representatives,
successors and permitted assigns) are hereby held and firmly bind unto the Gujarat Energy Transmission Corporation
Ltd (hereinafter called “the GETCO” which expression shall, where the context so admits, include its successors and
assigns) to refund the full amount of materials supplied by the GETCO under the terms and conditions of A/T No.
damage or deterioration of whatsoever nature occurs to said materials supplied by the GETCO and which are in the
custody of the contractor at their works site, on behalf of the GETCO, at (name of line)
_________________________________________________ , and / or if any of the said materials, when inspected by
any officer authorized by the GETCO in this behalf, is found to be damaged, lost, deteriorated in quality or quantity,
the contractor hereby agrees to bind himself to indemnity and at all times keep indemnified the GETCO against all
loss, damage and deterioration to the any material supplied by the GETCO during his custody and shall pay in cash
on demand from the GETCO within 30 days the market value of such materials which is lost, damaged or deteriorated
in full to the GETCO and shall also hereby authorize the GETCO to deduct the said sum from any sum due to the
contractor or any sum which may at any time become due to the contractor under the above referred contract or any
other contract entered into by the contractor with the GETCO.
AND WHEREAS the contractors do hereby agree to be responsible for the safe custody and protection and
preservation of the said materials against all risks, excluding war risks and against loss, damage and deterioration of
whatsoever nature in respect of the said materials while it remains in the custody and possession of the contractor.
AND WHEREAS the said materials shall at all times be open for inspection by any officer authorized by the GETCO
Now the conditions of the above written bond are such that the contractor shall pay the full amount forthwith to the
GETCO in the event of loss, damage or deterioration or whatsoever except due to circumstances arising out of war in
respect of the materials supplied by the GETCO and shall fully and effectually indemnify and keep indemnified to the
GETCO against such loss, damage and deterioration.
The contractor shall keep the said materials open at all times for inspection by the officers authorized by the GETCO
and produce at any time when demanded.
THE WITNESS WHERE OF: We the
(Signature of contractor)
hereto signed at ___________________
In the presence of
____________address ______________ (Signature)
Seal & Signature of Bidder - 64 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
_____________address ______________ (Signature)
Seal & Signature of Bidder - 65 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
PROFORMA FOR CONTRACT AGREEMENT
(Non Judicial Stamp Paper of Rs. 300/-)
This Agreement is made at BHARUCH the_____________ day of ___________ in the Christian
Year Two thousand ______between M/s. _____________________________________ (address of
office) ________________ (hereinafter referred to as “THE CONTRACTOR” which expression
shall unless excluded by or repugnant to the contract include its
successors or permitted assigns) of the ONE PART and the Gujarat Energy Transmission
Corporation Ltd, having their Head office at Vidyut Bhavan, Race Course, Baroda
(hereinafter called “The GETCO” which expression shall unless excluded by or repugnant to
the context include its successors or assigns) of the other part.
WHEREAS the aforesaid GETCO has accepted the tender of the aforesaid contractors for
____________________________________ hereinafter called “the works” and more particularly
described and enumerated or referred to in the specification, terms and conditions
prescribed in the order letter, covering letter and other letters and schedule of price
which for the purpose of identification have been signed by Shri ________________________
on behalf of the contractors and by Supt. Engineer (Trans), Gujarat Energy Transmission
Corporation Ltd, , Bharuch on behalf of the GETCO, a list whereof is made out in the
Schedule hereunder written and all of which said documents are deemed to form part of
this contract and included in the expression “The works” wherever herein used, upon
the terms and subject to the conditions hereinafter mentioned.
AND WHEREAS THE GETCO has accepted the tender of contractors for the construction of the
said works for the sum of Rs. __________ Rupees
(_______________________________________________) upon the terms and subject to the
conditions herein mentioned.
NOW THIS AGREEMENT WITNESSESS AND IT IS HEREBY AGREED AND DECLARED THAT.
1. The contractors shall do and perform all works and things in this contract
mentioned and described or which are implied therein or there from respectively
or are reasonably necessary for the completion of the works as mentioned and at
the times, in the manner and subject to the terms and conditions and stipulations
contained in this contract, and in consideration of the due provision,
executions, supply and completion of the works agreed to by the contractor as
aforesaid the GETCO do hereby covenant with the contractor to pay all the sums of
moneys as and when they become due and payable to the contractors under the
provisions of the contract. Such payment to be made at such times and in such
manner as is provided by the contract.
2. The conditions and covenants stipulated here-in-before in this contract are
subject to and without prejudice to the rights of the GETCO to enforce penalty
for delays and / or any other rights whatsoever including the right to reject and
cancel on default or breach by the contractor of the conditions and the covenants
as stipulated in the general conditions, specifications, forms or tender schedule
etc. attached with GETCO’s Order No. ___________________________.
Seal & Signature of Bidder - 66 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
The contract value, extent of supply & erection works, delivery dates,
specifications and other relevant matters may be altered by mutual agreement and
if so altered shall not be deemed or construed to mean or apply to affect or
alter other terms and conditions of the contract and the general conditions and
the contract so altered or revised shall be and shall always be deemed to have
been subject to and without prejudice to said stipulation.
List of documents forming part of the contract:
1. GETCO’s Tender Specification No. ____________ and contractor’s offer opened on
2. GETCO order No. Dtd. ___ / ___/
3. Contractor’s acceptance of order vide letter No. _______________.
4. Contractor’s Partnership Deed dtd. ________________.
5. Contractor’s Power of Attorney / GETCO Resolution authorising person to sign on
behalf of Firm.
In witness whereof the parties hereto have set their hands and seals this day and
month, year first above written.
1) Signed, sealed and delivered by
(Signature with name, Designation and official seal)
For and behalf of M/s. __________________ (Signature)
In the presence of (Full Name, Address and Signatures)
2) Signed, sealed and delivered by
(Signature with name, Designation and official seal)
for and on behalf of Gujarat Energy Transmission Corporation Ltd Transmission
Circle, BHARUCH.
In the presence of name, full addressed and Signature:
Seal & Signature of Bidder - 67 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
Seal & Signature of Bidder - 68 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
SAFETY CUM INDEMNITY BOND
(On Non-Judicial Stamp paper of value not less than Rs. 300.00)
KNOW ALL MEN BY THESE PRESENTS that we, ______ by this SAFETY CUM INDEMNITY BOND
Executed on this _____________ Day of _________ 2022. We Having Registered Office
_______________________________(herein after called “THE CONTRACTOR” which expression shall
mean and includes my /our heirs, executors, administrators and legal representatives, successors and
permitted assigns) do hereby binds myself/ourselves and also our company/firms after having the power to
bind by this promise and undertaking in favor of the Gujarat Energy Transmission Corporation
Limited (GETCO), Vadodara a State Transmission Utility under The Electricity Act, 2003 having its
registered office at Sardar Patel Vidyut Bhavan, Race course, Vadodara.( hereinafter called as GETCO,
which expression shall mean and
include its legal representative, administrator’s assigns) has agreed under the terms and conditions of the
contract no.______ dated_______made between __________ and ___________for the contract of the
____________value of Rs. ________ interalia on production of Safety Cum Indemnity Bond.
We do hereby undertake and agree to Indemnify and keep Indemnified GETCO from time to time to the
extent of Rs.______ Rupees________only against any losses or damages, costs, charges and
expenses caused to or suffered by reason of the CONTRACTOR while Project, R&M, O&M work
including work carried out by outsourcing agency, failing to take proper care or not complying the
guidelines given hereunder as per Annexure-A and instructions which may be given from time to time during
the continuance of the contract and we further undertake to unconditionally pay the amount claimed
by the GETCO on demand and without demur to the extent aforesaid.
Whereas the CONTRACTOR has/have been awarded to execute the job/works under order
no._____, dated ______ for _________ issued by the GETCO after having observing necessary
formalities, the details of which is described in the order no.______ dated ______ and whereas the
said job/works will be /likely to be done in places covered under Employees’ State Insurance
Act,1948 (ESI) and /or the Workmen Compensation Act,1923 and /or other laws relating to the
Labour Management and Welfare Act. (Respective Amendments)
And whereas according to the condition of the Contract the CONTRACTOR is under obligation to execute
this Safety cum Indemnity Bond before the commencement of actual execution of work.
Now the indenture witnesses that I/We the CONTRACTOR do hereby undertake to follow the guidelines as
per Annexure-A prepared by the GETCO.
Further we the CONTRACTOR agree that the GETCO shall be sole judge of and as to whether there has
been any breach of the guidelines as per Annexure-A of this bond and as to the extent of the loss,
damages, costs, charges and expenses caused to or suffered by the GETCO.
We the CONTRACTOR further agree that our liability under this bond shall not be discharged
because of the change in the constitution of the GETCO or for the extension of the time limit or for
any other reason.
We the CONTRACTOR further agrees to the given terms and conditions:
a. That the CONTRACTOR undertakes /undertake to indemnify and keep harmless the GETCO
from all claims, actions, proceedings and risk, damage danger to any person whether belonging or not
belonging to the. CONTRACTOR.
b. That the CONTRACTOR shall keep harmless the GETCO from all claims, compensation,
damages any proceedings in respect of any of its employee / workmen under the Workmen
Compensation Act or any other laws for the time being in force.
Seal & Signature of Bidder - 69 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
c. That, if during the course of execution of work as stated in the contract order mentioned
hereinabove issued by the OBLIGEE, it is found that the CONTRACTOR has not complied with
guidelines as per Annexure-A or terms and conditions / formalities within the meaning of
Employees’ State Insurance Act,1948 (ESI) or Workmen Compensation Act 1923 or any other laws
relating to the Labour Welfare for the time being in force, and also has not observed the safety
norms in accordance with the law prevailing at the place of work/job to the satisfaction of the
GETCO, the GETCO shall have the right to stop the execution of work/job and the period of such stoppage
shall not be taken into account for the calculation of the total period of completion of work for which
the CONTRACTOR is responsible to complete the work/job and it will be deemed that
discontinuance was due to default of the CONTRACTOR .
d. That, if any time, due to exigency, GETCO as the Principle Employer, becomes liable to pay any
such compensation mentioned hereinabove, whether on failure of the CONTRACTOR or for any other
reason, the GETCO shall have the right to recover the said amount from any amount receivable
by GETCO or any bank guarantee deposited or anything payable whether in connection with this
contract \ or other contract by the CONTRACTOR to the OBLIGEE.
e. That the CONTRACTOR is/are aware and accept that for the persistent or repeated violation of any
guidelines as per Annexure-A and terms and conditions mentioned in this Safety cum Indemnity Bond,
GETCO shall have right to terminate the contract of work issued to the CONTRACTOR .
f. In case if any safety related fatal Electrical / Mechanical accident occurred to any employee of
agency or outsider due to negligence or non-compliance of GETCO safety norms then in addition
to the compensation and liability as per statutory requirement, contractor / agency is hereby agreed
to pay the penalty amount as given below:
Sr. no Amount of Contract in Rs. Penalty amount
1 Up to 1 Lac Rs. 5000/-+GST as applicable
2 Above 1 Lac to 10 Lacs Rs. 40,000/+GST as applicable
3 10 Lacs to 100 Lacs Rs. 1,00,000/+GST as applicable
4 More than 100 Lacs 1.0 % of contract value.+ GST as applicable.
g. I/We the CONTRACTOR hereby confirm that in case of any dispute/difference for settlement of claims
under this Safety Cum Indemnity bond the courts in Gujarat State wherever job/work is performed or as
per GETCO norms shall have the jurisdiction to decide the rights & liabilities of the parties while
adjudicating the matter of claims under this Safety Cum Indemnity Bond.
h. This Safety cum Indemnity Bond shall continue and hold good until it is released by the GETCO in
Writing on the CONTRACTOR’s application after the Contractor has discharged all his obligations
under the order mentioned hereinabove and submitted a “NO DEMAND CERTIFICATE” from the
GETCO under the said order. The Safety cum Indemnity Bond shall be valid for a CONTRACT
PERIOD and renewable thereof (Claim Period).
i. This Safety cum Indemnity Bond and the guidelines as per Annexure-A herein contained are in
addition to And not by way of limitation or substitution for any other guarantee, indemnities Hereto
before given to the GETCO by the
CONTRACTOR and this indemnity does not Revoke or limit such indemnities or guarantees. IN WITNESS
WHERE OF the Parties hereto have executed this indenture the day the year First hereinabove written.
(Signature with seal of The CONTRACTOR)
Seal & Signature of Bidder - 70 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
In the presence of:
Seal & Signature of Bidder - 71 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
ON RECENT STAMP PAPER OF RS. 300/-
The Superintending Engineer (TR) BG. No. :
Gujarat Energy Transmission Corporation Ltd Issue Date:
Transmission Circle Office, Expiry Date :
Maktampur, Amount :
FORM OF BANKER’S UNDERTAKING
[Combined Performance Guarantee (PBG) towards Execution Period and Guarantee / Warranty
Period as per Commercial Terms and Condition of Tender]
We, _______________________________________ (Name of the Bank and Address of the Branch giving
the Bank Guarantee) having our registered office at _________ (Address of Bank’s Registered office)
hereby give this Bank Guarantee Number __________ dated ________ and hereby agree unequivocally
and unconditionally to pay immediately on demand in writing from the Gujarat Energy Transmission
Corporation Limited, or any Officer authorized by it in this behalf any amount up to and not exceeding
Rs._____________ (Amount of combined Performance Guarantees towards Execution / Supply Period
and Guarantee / Warranty Period) (Rupees _______ (in words) to the said Gujarat Energy Transmission
Corporation Limited, on behalf of M/s________________________________ who have entered into a
contract for the supply/works specified below :
This agreement shall be valid and binding on this Bank upto and inclusive of ____________ (Date of
validity of the Bank Guarantee) and shall not be terminable by notice or by change in the constitution of
the Bank or the firm of Contractors / Suppliers or by any other reasons whatsoever and our liability
hereunder shall not be impaired or discharged by any extension of time or variation or alteration made,
given conceded or agreed, with or without our knowledge or consent, by or between parties to the said
within written contract.
Notwithstanding anything contrary contained in any law for the time being in force or banking practice,
this Guarantee shall not be assignable, transferable by the Gujarat Energy Transmission Corporation
Limited. Notice or invocation by any person such as assignee, transferee or agent of beneficiary shall not
be entertained by the Bank. Any invocation of the Guarantee can be made only by the beneficiary
“NOTWITHSTANDING” anything contained herein before, our liability under this guarantee is restricted
to Rs._____________. (Rupees _________________________________ only). Our guarantee shall
remain in force until ___________ (Date of validity of the Guarantee). Unless demands or claims under
this Bank Guarantee are made to us in writing on or before ___________ (Date of validity of the Bank
Seal & Signature of Bidder - 72 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
Guarantee), all rights of Beneficiary under this Bank Guarantee shall be forfeited and we shall be
released and discharged from all liabilities there under:
Please Mention here Complete Postal Address of the Bank Signature of the Bank’s Authorized
with Branch Code, Telephone and Fax Nos. Signatory with Official Round Seal
NAME OF DESIGNATED BANKS:
Note: The banks shall be the Banks recognized / notified by the Finance
Department, Government of Gujarat (GoG) from time to time
PARTY TO TAKE NOTE PLEASE BEFORE SUBMITTING THEIR BANK GUARANTEES
1. Bank Guarantee number and date to be written on every page of Bank Guarantee & its
2. If B/G amount is more than Rs. 50,000/-, kindly take sign of Two Bank Officer with their
respective Employee Code No.
3. Valid confirmation letter of the concerned Bank in an approved format should be attached with
every Bank Guarantee & its Extension.
4. Stamp paper should be valid & recent one and date of issuing of stamp paper should not be
beyond six months, in any case.
5. Round seal and signature of two Bank Officers with name & sign code should be affixed on
every B/G paper.
Seal & Signature of Bidder - 73 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
Format for LOI Letter of Acceptance
(TO BE SUBMITED ON FIRM’S LETTER HEAD)
Ref . No. Date:
The Superintending .Engineer (TR)
Gujarat Energy Transmission Corporation Ltd,
Circle Office,Bharuch
Sub: Letter of acceptance of LOI
We hereby agree, admit and acknowledge the receipt of your above referred Acceptance of Tender for the
“Tender for Work of Providing Maintenance free treated earth Electrodes at various substation under
KIM AM Division under Bharuch TR Circle.’’ We hereby further agree to all the terms and conditions
mentioned in the tender, LOI and A/T unconditionally
Yours faithfully,
(Authorized Signature)
Designation _________________
Seal & Signature of Bidder - 74 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
A/T ACCEPTANCE LETTER: -
(TO BE SUBMITED ON FIRM’S LETTER HEAD)
Superintending Engineer (TR)
Gujarat Energy Transmission Corporation Ltd
Circle Office,bharuch
Maktampur-392012
Sub: A/T acceptance letter
We hereby acknowledge, agree and accept your Tender No.____________________ and letter of intent
No._________________________ and Work order no. under reference above with terms and conditions
mentioned therein for the “Tender for Work of Providing Maintenance free treated earth Electrodes at
various substation under KIM AM Division under Bharuch TR Circle.’
Designation ___________________
Seal & Signature of Bidder - 75 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
Sub: - Application for refund of EMD
I request your good self to refund my EMD for the tender mentioned below as soon as the
price bids are opened and if I/We am/are not the L1 for the same. The details are as under.
Name of Work Sub-etc.
EMD) RTGS/NEFT No., Date & Name of
Bank detail for RTGS into
which EMD is required to be
Faithfully yours,
(Name & Seal of Bidder)
Seal & Signature of Bidder - 76 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
Seal & Signature of Bidder - 77 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
NAME OF WORK:- Work of Providing Maintenance free treated earth Electrodes at various substation under KIM AM Division
under Bharuch TR Circle
Work Description Qty UOM Rate
(a) Supply,Installation,Testing and commissioning of maintenance free
treated earth electrodes suitable for NORMAL SOIL as per drawing No.
GETCO/E/STD/P-021 (1 OF 2) R3 dated 29-05-2020 and technical
specifications GETCO/E/TS-Maintenance free earth pits/R1 dated 04-06-
15 for 66/11 kV substations with ground enhancement material/ back fill
1 / grounding compound as per IEEE 80-2000 Clause 14.5 (d) and as per 129 No 13893
part-7 of IEC-62561 Using Copper bonded earth electrode (with
micron copper coating) having 24 mm dia (min) and 3000 mm length
which shall be capable of handling STC of 25 KA-1 sec. Work also includes
Providing BB masonry inspection chamber(manhole) incl. light type CI
Installation of earthing strips / MS round bar in any kind of soil except
Rocky(HR/SR) Soil as per earthing philosophy of GETCO
1) Including digging of 600mm depth and 450mm wide trench.
2) Cutting, bending, laying and fixing of Earthing grid conductor.
3) 75x10mm / 50x6mm GI strips: Fixing of two bolt at each straight joints
and lap welding, removing oxide films formed during welding, applying
two coats of red oxide and black powder after welding and applying zinc
rich paint on welded joints.
4) 25/32/36/40MM dia MS Rod: Lap welding at each straight & cross
joints, removing oxide films formed during welding, applying two coats of
red oxide and black powder after welding and applying zinc rich paint on
5) Including supply of red oxide paint, black powder, HDGI Nuts & bolts as
per specification.
6) Back filling of the trench with yellow/ Normal soil.
Structure & Equipment earthing:
1) Including digging of 600mm depth and 450mm wide trench.
2) Cutting, bending as per required shape, laying and fixing of risers from
Grid to structures and Equipment.
3) Lap welding, removing oxide films formed during welding, applying two
coats of red oxide and black powder after welding and applying zinc rich
paint on welded joints including supply of HDGI Nuts & bolts for all
connections including suporting to structures etc as per specification.
4) Back filling of the trench with yellow/ Normal soil.
2 b) 50 x 6 mm GI strip / MS round bay up to and including 25mm 2450 Mtr 43
Sub Total (in Rs)
Total Amount (in Rs)
Total Amount (in Rs)
(1) Welfare Cess shall be reimbursed separately on production of proof of such payment made by the contractor to the
appropriate department.
(2) Work should be carried out as per GETCO’s standards by implementing FQP/ISO. Other terms & conditions as per
(3)All safety norms must be implemented
Seal & Signature of Bidder - 78 -
GUJARAT ENERGY TRANSMISSION CORPORATION LTD
TRANSMISSION CIRCLE
P. O. Maktampur, BHARUCH-392
Telephone No. (02642) 227306 Fax No. (02642)
Email: [email protected]
office:- Corporate Office, GETCO, Race course, Vadodara
SUPERINTENDING ENGINEER (TR)
GETCO, CO, Bharuch.
Seal & Signature of Bidder - 79 -
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
E-146 Tender Bharuch.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].