Loading…
Loading…
Tender ID
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical Technically Qualified |
| 2 | Accepted-Technical 14 123 DANGAPARA P O KANDI DIST MURSHIDABAD WEST BENGAL 742137 | MURSHIDABAD | WEST BENGAL | 742137 | Accepted-Technical Technically Qualified |
| 3 | Accepted-Technical PREMISES NO 02 0517 PLOT NO AAIIB 330 ACTION AREA IIB NEWTOWN NORTH 24 PGNS KOLKATA 700157 | 24 PARAGANAS NORTH | WEST BENGAL | 700157 | Accepted-Technical Technically Qualified |
Tender Value
₹43.5 L
EMD Value
₹87,062
Closing Date
12 Mar 2026, 2:00 pmClosed
General Manager (Engg)-IV
HIDCO BHABAN
Repair and Restoration of Village road from Sulanguri Colonypara Madhyamik School to Anil Biswas House in Sulanguri, Newtown, Kolkata. Under Neighbourhood Development Project Total Length 550 Mtr
2026_HIDCO_1016363_1
HIDCO/GM(E)IV/RP/NIT125/25-26
Open Tender
CIVIL WORKS
Percentage
30 days
NEW TOWN
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹87,062
14 Mar 2026
27 Feb 2026
14 Mar 2026
27 Feb 2026
12 Mar 2026
27 Feb 2026
Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (i) In ordinary soil
Compacting Original Ground A. Compacting original ground supporting subgrade Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Clause 305.3.4 of Specifications for Road & Bridge Works of MoRT&H (5th Revision).
Water Bound Macadam Base Course Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening / binding materials to fill up the interstices of coarse aggregate, watering including lighting, guarding, barricading and making necessary earthen bundh of one metre width on each side and preparing the bed by necessary cutting or filling, including cost of all materials and hire and labour charges of all men and machinery and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (ii) Grading-I Aggregate (63 mm to 45 mm) Using Stone Screening Type B (11.2 mm) A.Mechanical Means. a) Compacted Thickness 165 mm
Prime Coat Providing and applying primer coat with Cationic Bitumen Emulsion of approved grade conforming to IS: 8887-1978 and requisite quantity on prepared surface of granular base including cleaning of road surface and spraying primer using Mechanical means including cost and carriage of bitumen emulsion and all other incidental costs of work complete as per Clause 502 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For WBM / WMM Surface: (with primer @ 0.70-1.0 kg/sqm)
Bituminous Macadam using Hot Mix Plant (HMP) Providing and laying bituminous macadam with Hot Mix Plant using approved crushed aggregates of specified grading as per Table 500.7 premixed with bituminous binder, transported to site laid over a previously prepared surface at specified laying temperature with paver finisher to the required grade, level and alignment and rolled with suitable power roller for break down, inter-mediate and finished rolling as per specification to achieve the desired compaction including cost and carriage of stone materials and bitumen, hire charges of machinery and equipment, cost of fuel and lubricants and wages of operational staff, quality control complete as per Clause 504 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). B. For Grading 2 (19 mm nominal size, 50 mm thick.) (ii) Using Drum mix Type HMP of minimum capacity 60-90 TPH. For 50mm Compacted thickness
Providing & Laying 20 mm thick Mix Seal Surfacing (MSS) Providing, laying and rolling of close graded premix surfacing using materials of 20 mm thickness composed of 11.2mm to 0.09mm (For Type – A) or 13.2mm to 0.09mm ( For Type – B) aggregates using penetration grade bitumen to the required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable plant, laying and rolling with a smooth wheeled roller 8 – 10 tonne capacity and finishing to required level and grade etc. including all other incidental charges, quality control as per clause 508 of specifications for Road & Bridge Works of MoRT&H (5th Revision) complete. (a) Type – A : Using 2.2 kg bitumen per square meter surface area : i) Using Hot Mix Plant not less than 75 T / Hr.
Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars. (a) In ground floor including roof
Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes. (i) Pakur Variety
Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (f) 25 mm to 30 mm shuttering without staging in foundation.
Bailing out water by pump including all leads and lifts and including making all arrangements for disposal, where continuous flow or seepage of water is encountered and rating of pumps and hours of operation is specifically ascertained as per direction of the Engineer-in-charge.
(a) M.S.or W.I. Ornamental grill of approved design joints continuously welded with M.S, W.I. Flats and bars of windows, railing etc. fitted and fixed with necessary screws and lugs in ground floor. (Add extra @ 1% for each addl. floor upto 4th floor and @ 1.25% for each addl. floor above 4th floor) (ii) Grill weighing above 16 Kg./sq.mtr and above
Add CGST @9% of total amount to Rs.36,58,073.36
Add SGST @9% of total amount to Rs.36,58,073.36
Add Construction Cess @1% of total amount to Rs.36,58,073.36
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.45 MB
Specialtermsandcondition.pdf
Tender Documents • 0.68 MB
TENDERDOCUMENT.pdf
Tender Documents • 0.59 MB
BOQ_2496771.xls
BOQ • 0.27 MB
2911_FORM.pdf
Tender Documents • 0.16 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .