Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.2 CrAdmitted-Finance 16 13 VINAY KUMAR JAIN SHAKTI NAGAR MALKA GANJ NORTH DELHI DELHI 110007 | NORTH DELHI | DELHI | 110007 | L1 | Admitted-Finance | ||
| 2 | L2₹1.3 Cr+₹10.2 L (8.58%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹1.3 Cr+₹10.9 L (9.20%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹1.5 Cr
EMD Value
₹3.1 L
Closing Date
15 Jul 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
xen south
jda jodhpur
park development with tree maintenance for three years of sector L , M, N and O vivek vihar yojna
2024_JDAJO_402555_3
JoDA/Nit-04/South/2024-25
Open Tender
Civil Works
Percentage
1320 days
jda jodhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
Secretary jda 2000 and md risl jaipur 2000
₹3.1 L
Yes
16 Jul 2024
6 Jul 2024
16 Jul 2024
6 Jul 2024
15 Jul 2024
6 Jul 2024
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared. | 12,925 | Sqm. | 5 | ₹64,625 |
| 2 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 112 | Sqm. | 178 | ₹19,936 |
| 3 | Providing and laying in position cement concrete including curing, compaction etc. complete in specified grade excluding the cost of centering and shuttering - All work up to plinth level. 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size). | 205 | Cum. | 3,302 | ₹6,76,910 |
| 4 | Random Rubble stone masonry for with hard stone in foundation and plinth in Cement Sand mortar above 30 CM thick wall in: Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 105 | Cum. | 2,838 | ₹2,97,990 |
| 5 | Random Rubble stone masonry with hard stone in superstructure above plinth level and upto five level above 30cm. thick walls in : Cement Mortar 1:6 ( 1-Cement : 6-Sand). | 504 | Cum. | 3,479 | ₹17,53,416 |
| 6 | Add extra for facing as per design and detailed specifications including additional cost of stones Course rubble facing First sort. | 1,187 | Sqm. | 618 | ₹7,33,566 |
| 7 | Add extra for facing as per design and detailed specifications including additional cost of stones Course rubble facing Second sort | 1,187 | Sqm. | 491 | ₹5,82,817 |
| 8 | Add extra for rock facing using Jodhpur white sand stone with porper projection and chiesel dressing of edges of stone 2 line dressing for building corners,jambs including uniform joints. | 1,187 | Sqm. | 290 | ₹3,44,230 |
| 9 | Providing and laying in position specified grade of cement concrete for all RCC structural elements upto plinth level including curing, compaction, finishing with rendering in cement sand mortar 1:3 (1 cement: 3 coarse sand) and making good the joints and cost of plastizers( if required) excluding the cost of centering, shuttering and reinforcement. M20 grade Nominal Mix / Design Mix | 62 | Cum. | 4,934 | ₹3,05,908 |
| 10 | Centering and Shuttering with plywood or steel sheets including strutting, propping bracing both ways and removal of formwork for foundation , footings, strap beam, raft , bases of columns etc. | 273 | Cum. | 157 | ₹42,861 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.23 MB
Binder2.pdf
Tender Document • 1.84 MB
Tendernotice_1.pdf
Tender Document • 2.23 MB
BOQ_725584.xls
BOQ • 0.31 MB
Binder2.pdf
Tender Documents • 1.84 MB
BOQ_725584.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .