Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.8 L+₹1.3 L (54.5%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹3.9 L+₹1.4 L (57.5%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹98.0 L+₹95.5 L (3859.0%)Rejected-AOC IX 526 527 HILL PALACE ROAD KARINGACHIRA IRUMPANAM P O TRIPUNITHURA ERNAKULAM KERALA 682309 | ERNAKULAM | KERALA | 682309 | L4 | Rejected-AOC L4 |
Tender Value
Refer Docs
EMD Value
₹5,000
Closing Date
27 Oct 2022, 2:00 pmClosed
Varghese P O
SM P AND P FACT LTD
Handling Dummies,Slip Plates etc. of Various vessels/ Equipments/ Pipelines in PA and PC Plants, FACT-CD.
2022_FACT_717386_1
04098/2022-2023/E26246
Limited
Miscellaneous Works
Item Rate
365 days
AMBALAMEDU
This tender is issued on limited tender basis from the registered bidders of FACT (CD) (list CDM105B).
4 documents required · 4 mandatory
₹0
₹5,000
Yes
10 Nov 2022
12 Oct 2022
28 Oct 2022
12 Oct 2022
27 Oct 2022
12 Oct 2022
Handling Dummies,Slip Plates etc. of Various vessels/ Equipments/ Pipelines in PA and PC Plants, FACT-CD.
Handling Dummy Plates from Size 50 NB to 300 NB: Arranging tools for the work. Dismantling, removing of drain dummies, end dummies, inspection covers, manhole covers, drain valves, flange joints, slip plates etc. of various equipments/pipelines in PA and PC plants for cleaning/repair/inspection, fixing back the same with new gasket and servicing without leak for size varying from 50 NB to 300 NB.
Handling Dummy Plates from Size 350 NB to 1000 NB: Arranging tools for the work. Dismantling, removing of drain dummies, end dummies, inspection covers, manhole covers, drain valves, flange joints, slip plates etc. of various equipments/pipelines in PA and PC plants for cleaning/repair/inspection, fixing back the same with new gasket and servicing without leak for size varying from 350 NB to 1000 NB.
Replacement of Clariflocculator Wheel: The required site arrangement to replace clariflocculator wheel shall be done. Tools and tackles shall be arranged. Lifting the running frame of clariflocculator in Pollution Control plant by hydraulic jack, supporting it and remove the wheel with shaft, removing sprocket/bearing etc., replace the damaged bearing, damaged wheel etc, assembling and erecting at site and take trial run of clariflocculator, site cleaning and transporting the damaged parts to workshed/area earmarked for scrap/scrapyard as instructed by Shift-in-Charge.
Replacement of Drive Chains in Pollution Control: Repairing/Replacement of drive chain of clariflocculators, elevators etc. Arrange the required tools and tackles for the work. Collect the spare chain from store/workshed. Dismantle the damaged chain from the sporket. Assemble and erect the spare chain after inspection of sprocket. Lubricate the chain. Site cleaning and shift the damaged chain to workshed/area earmarked for scrap/scrapyard.
Replacement of Drive Sprockets in Pollution Control: Replacement of sprockets of clariflocculators/elevators etc. Arrange the required tools and tackles for the work. Collect the spare sprocket from store/workshed. Dismantle the drive chain. Dismantle/pull out the damaged sprocket from the shaft. Assemble the spare sprocket on the shaft. Assemble the drive chain. Lubricate the sporcket and chain. Site cleaning and shift the damaged sprocket to workshed/area earmarked for scrap/scrapyard.
Easing of Stuck Up Valves: Easing of stuck up valves at site as instructed by Engineer-in-Charge.
Fabrication and Erection of Chain Guard and Coupling Guard: Collect the materials and consumables for the work. Arrange necessary tools and tackles. Take measurement from the site. Fabricate chain guard and coupling guards to suit the site condition. Proper welding and grinding shall be done. Erect the chain guard/coupling guard at site. Necessary modification/providing structural support at site during erection shall be done. Clean the site and transport the scarp material to scrapyard.
Replacement of Gearbox/Motors in Pollution Control : The required site arrangements shall be done for the replacement of gearbox/motor at pollution control area. Arrangement of necessary tools and tackles for the work shall be done. Coupling guard/chain guards shall be removed. The gearbox/motor shall be decoupled. Foundation bolts of the existing gearbox/motor shall be loosened/removed and lead/ transport the damaged gearbox/motor to mechanical/electrical work shop. Collect the new/spare gearbox/motor from mechanical/electrical workshop and shall be transported to site. The gearbox/motor shall be kept in position and insert the foundation bolts, after cleaning the base plate.Check and correct the alignment of the gearbox/motor at the drive side and driven side (for gearbox). Jackbolts, foundation bolts, base plates etc. shall be adjusted/modified according to site condition. Jack bolts/foundation bolts if damaged shall be replaced. Full tighten the foundation bolts. Couple the gearbox/motor after inspection of alignment by Engineer-in-Charge. Provide chain guards/coupling guards. Site cleaning shall be done. Cleaning of damaged gearbox transported to mechanical workshop shall be done.
BABY B
Sivadasan K
S K BOILERS PVT LTD
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_754590.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .