Loading…
Loading…
Tender Value
₹15 L
EMD Value
₹15,000
Closing Date
10 Sept 2026, 6:00 pm
DGVCL - Raipipla Division office
ARC for Maintenance of various capacity of transformer at various location of Rajpipla-2 Sub division under jurisdiction of Rajpipla Division
337162
79/2026-27
Open
Electrical and Maintenance Works
Works
Narmada
2 documents required · 2 mandatory
₹1,180
DGVCL
₹15,000
20 Aug 2026
20 Aug 2026
20 Aug 2026
10 Sept 2026
20 Aug 2026
Name of work: Maintenance of various capacity of transformer at various location of Rajpipla-1 and Rajpipla-2
sub division under the juridictional of Rajpipla Division and any Sub Division under Rajpipla Division.
Sr. No. Description Unit Material Charge Total
1 Labour charge for providing of HT/LT bushing goti if required No. 100
1.1 Replacement of LT bushing goti/ Rubber washer No. 40
1.2 Replacement of HT bushing goti/ Rubber washer No. 40
Providing of half stud (Including 2nos Nut & 2nos Washer) on LT side up to
KVA TR if required
3 Providing of AL. Patta on LT side up to 200 KVA TR if required No. 140 5
4 Providing of AL. Patta on LT side up to 500 KVA TR if required No. 165 10
5 Check and tight earth connection, if required provide lugs & nut-bolt to the LS 0 50
neutral terminal of TRF and to the body terminal of TRF and dist box earth
Replacement of damage LT cable with new one of right capacity (cable provide
Providing of new termination in form of R,Y,B and N core including PVC tape
7.1 Termination of 25/50/70 Sq.mm cable No. 8 20
7.2 Termination of 300 Sq.mm cable No. 45 20
7.3 Termination of 95/120/150 Sq.mm cable No. 16 20
7.4 Termination of 185 Sq.mm cable No. 23 20
7.5 Termination of 240 Sq.mm cable No. 32 20
Measurement of voltage and ampere during maximum load period minimum
nos. of T/C per day
Check oil leakage from drain off valve/gasket/tank leak etc. and if leakage found
at attend by providing adhasive material, m-seal and give detail of leakage and
topping of oil to maintain proper oil level (oil provide by DGVCL)
10 Checking and replacement of LT Dist box if required
Fixing of new dist. Box with complete wiring including clamps, nut bolts etc.
Replacement of detoriarated/providing LT dist. Box with new up to 100 KVA
capacity & crediting it to store.
Replacement of detoriarated/providing LT dist. Box with new above 100 KVA
capacity & crediting it to store.
Checking and replacement of kit- kat fuse if required (kit- kat fuse base provide
11.1 up to 100 amp kit-kat fuse No. 850 20
11.2 200 amp kit-kat fuse No. 950 20
Checking and replacement of HRC fuse base if required (HRC fuse base provide
12.1 630 amp HRC fuse base No. 682 50
12.2 400 amp HRC fuse base No. 525 50
12.3 250 amp HRC fuse base No. 370 50
Checking and replacement of HRC fuse bridge if required (HRC fuse provide by
13.1 630 amp HRC fuse No. 690
13.2 400 amp HRC fuse No. 490
13.3 250 amp HRC fuse No. 352
Sr. No. Description Unit Material Charge Total
Providing of proper size of fuse element on HT side (on D.O. fuse with cleaning
Providing and replacement of sundry items like nut,bolt,washer etc. of
appropriate size
16 General condition
Clean off all dirt etc from the body of the transformer and tighten all nut-bolt
16.2 Clamping of LT cable as per instruction of incharge supervisor
Cleaning of surronding area nearby transformer center, treeming of tree
branches, removing of crimpers etc.
16.4 Submission of the all activity done at location wise in prescribed proforma
format with signature of incharge of supervisor and contractor
Providing of breather if not available with transformer (breather to be provided
Providing of insulated jumper at HT side from D.O. fuse out side to TC. All three
nos. (Jumper wire will be provided by DGVCL)
Supply, Installation, testing and commissioning of maintenance free, ready
17 capsule, pipe-in-cage (PIC) type earth pit with 3 Mtr Electrode as per the teder No. 5450
specification and drawing attached with tender
Supply, Installation, testing and commissioning of maintenance free, ready
18 capsule, pipe-in-cage (PIC) type earth pit with 2 Mtr Electrode as per the teder No. 4150
specification and drawing attached with tender
Supply and installation of 25 X 3 mm GI Strip having hot dip- galvanized-zinc
coating of 80-100 microns without any joints or welding. Both the end of the GI
strip should be connected with GI nut bolts and required fabrication work for
giving separate earthing connections to
19 (1) Neutral of the transformer Mtr 45
(2) MS structures of the transformer center (Approximately 25 meter GI strip per
transformer centre
- as per requirement and instruction of Engineer in- charge)
Supply and installation of uPVC standard make Pipe of 1.25" diameter for
covering GI strip with UV protected Cable Ties of 550 X 7.6 mm size to bind with
20 pole face(Approximately 25 meter uPVC pipe for GI strip covering per Mtr 85
transformer centre -as per requirement and
instruction of Engineer in-charge)
21.1 LT Side Brass half stud with 2 no brass nut & washer of size 12 mm No. 158 18
21.2 LT Side Brass half stud with 2 no brass nut & washer of size 20 mm No. 300 18
22 LT Side Brass Nuts and washer
22.1 12 mm Brass LT side nuts No. 16 12
22.2 20 mm Brass LT side nuts No. 41 12
22.3 30 mm Brass LT side nuts No. 68 12
22.4 12 mm Brass LT side washer No. 10 12
22.5 20 mm Brass LT side washer No. 18 12
22.6 30 mm Brass LT side washer No. 20 12
Breather plastic transparent body cast metal cap and bottom, 1/2'' thread
pipe,250 grams.( Dry gel weight 250 gm)
Breather plastic transparent body cast metal cap and bottom, 1/2'' thread
pipe,500 grams.( Dry gel weight 500 gm)
Supply and Installation of 11/22 kV Distribution Transformers HT Terminal
protector (UV Resistance) with using 95/120/150 sq.mm long barrel aluminum
24 Per Set 1700
lug. (1Set = 3 Nos i.e. on R, Y, B Terminal Protector(Uv Resistance) With using
120 , 150 Sq mm Long Barrel Aluminum Lug
Supply & Installation of HT EPR Tap on 11/22 kV Distribution Transformer with
replacement of bare conductor by HT ABC conductor (DO bottom side to
25 transformer) after removal of semi conductor by HT ABC (6 inch both side). HT Per Set 1800
ABC to be supplied by DGVCL. (1Set = 3 Nos i.e. on R, Y, B)
Sr. No. Description Unit Material Charge Total
Supply & fixing of upto 33 kV Conducotr sleev for Busbar to Drop out Fuse and
26 Drop out fuse to Transformer H.T. including Busbar (12 mm sleev) as per Mtr 850
technical specification. (All Materials will be supplied by Agency)
Supply & fixing of Disc type Red Color FRP(Non-flammable) material with
Weather resistant, Non-conductive bird guard OD=300 MM, ID=33 MM, Width
=1.25 MM, one side cut from ID to OD. (All Materials will be supplied by Agency)
Total Amount 1500000/-
Total Amount 1500000/-
in words: FIFTEEN LAKH ONLY
Note :- 1) All necessary testing certificates of material supplied by the
contractor shall be submit to this office as per NABL Laboratory.
2) The rates are inclusive of PF and work contract tax and Exclusive of
3) TDS GST will be applicable as per Govt. Rules.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
E-2 schedule-A.pdf
Revised Schedule B TC MAINTAINANCE - 15 LAC.pdf
Tender Copy TC Maintanfinal.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].