Loading…
Loading…
Tender Value
₹84,184
EMD Value
₹2,105
Closing Date
7 Oct 2026, 6:00 pm7d left
AE
LID EW SECTION MUNDAKKAYAM GP
Annual Plan-Project no 552/25-26,Kulampadi public pond maintenance ward 13-MGPGeneral Civil Work
2026_LSGD_830700_40
07/2025-26/AE/LIDEW/MKM
Open Tender
Civil Works - Others
Percentage
180 days
MUNDAKKAYAM
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹2,105
Yes
30 Sept 2026
30 Sept 2026
9 Oct 2026
30 Sept 2026
7 Oct 2026
30 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Pond Maintenance work | |||||
| 1.001 | 50.10.1:Steel work in built up G I tubular ( round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 89.97 | kg | 230.93 | ₹20,776.54 |
| 1.002 | OD391260/2025-2026:Providing and fixing GI welded mesh 25x25 mm having 3.20 mm wire dia,including welding to existing frame complete as per the direction of Engineer- in - charge. | 16.67 | sqm | 1,011.11 | ₹16,858.24 |
| 1.003 | 13.52.2:Finishing with Epoxy paint (two or more coats) at all locations prepared and applied as per manufacturer's specifications including appropriate priming coat, preparation of surface, etc. complete.On concrete work | 16.67 | sqm | 248.82 | ₹4,148.58 |
| 1.004 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 3.91 | cum | 9,235.97 | ₹36,140.35 |
| 1.005 | 50.2.3.1:Pumping or Bailing out water and removing slush etc by using pump set including cost of labour, oil hire charges of pumpset, etc complete | 4 | hour | 345.54 | ₹1,382.16 |
| 1.006 | 4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 5.81 | sqm | 839.6 | ₹4,878.08 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.75 MB
viewnit.pdf
Tender Documents • 0.02 MB
viewsbd.pdf
Tender Documents • 1.78 MB
BOQ_1485322.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .