Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹18.0 LAccepted-AOC | 1 | Accepted-AOC L1 | |
| 2 | 2₹19.3 L+₹25,001 (1.32%)Rejected-Finance GOVT ELECTRICAL CONTRACTOR C VILLAGE HAT PO BAJAURA TEHSIL BHUNTAR DISTRICT KULLU HP 175125 | KULLU | HIMACHAL PRADESH | 175125 | 2 | Rejected-Finance 2 | |
| 3 | 3₹19.3 L+₹28,001 (1.47%)Rejected-Finance | 3 | Rejected-Finance 3 | |
| 4 | Rejected-Technical | - | Rejected-Technical Reject | |
| 5 | Rejected-Technical VILLAGE CHAMYANA P O KAMLA NAGER BHATTA KUFER DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | - | Rejected-Technical Reject |
Tender Value
₹18.3 L
EMD Value
₹36,450
Closing Date
20 Sept 2024, 11:00 amClosed
Executive Engineer
Jal Shkati Division Bilaspur
A/R and M/O LWSS Talwara Datoh Jole Plakhin in Tehsil Sadar District Bilaspur (SH Operation for pumping machinery and distribution system for water supply scheme from sector storage tank to different habitations for one year).
2024_HPIPH_92904_1
BLP-BLP-00736 NIT No. 8530-8631 dated 09/09/2024
Open Tender
Civil Works
Item Rate
365 days
Sub Division Kandrour Section Kuthera
Please refer Tender documents.
8 documents required · 8 mandatory
₹400
Yes
EE JSV Division Bilaspur
₹36,450
Yes
29 Oct 2024
10 Sept 2024
20 Sept 2024
10 Sept 2024
20 Sept 2024
10 Sept 2024
Amount
Operation of pumping machinery and distribution system of water supply from different Sector storage tank, to different habitations being feeded from LWSS Talwara Datoh Jole Plakhin whose line plan and technical data sheet is attached with, by the contractor through skilled / unskilled manpower i.e Pump Operator/Beldar/ Helper for running, maintenance and operation of pumping machinery and distribution system contigent to the work, watch and ward of all structures, machinery including rising main, operation of wheels from various tanks at different locations for distribution of water through the laid distribution network and maintaining all records regarding distribution of water to consumers at consumers ends as per the direction of the Engineer-in-charge.
Description of main components of the scheme is as under:-
Civil works: 4 Nos pump house. Rising main: 1st stage: 200mmdia 4650 rmt, 2nd stage 100mmdia=1200Rmt, 3rd stage 80mm dia=3200 Rmt, 1st phase to Bhulsai 80mm dia=2400 Rmt. Distribution system: 45000 Rmt. Pumping machinery: 1st stage: 2x170=340 HP, 2nd stage 2x30=60 HP, 3rd stage 230=60HP, 1st phase to Bhulsai 225=50 HP. No of storage tanks: 4 Nos, 8 No sub storage tank, Total working hours 70 per day : through , 10 Nos persons. Indicators to be mentioned:Average per day 3 Nos of complaints received thorugh differnt mode such as C.M Sanklap E-Samadhan, complaint register and toll free No. Quantity of water lifted per day:776000 ). Pumping hours per day ( 18,14,7 and 14 ) and energy consumptoin per day 906 Unit.
VINOD KUMAR
vishal thakur govt contractor
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .