| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.2 LAccepted-AOC | ₹35.2 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹41.1 L+₹5.9 L (16.7%)Rejected-AOC | ₹41.1 L+₹5.9 L (16.7%) | L2 | Rejected-AOC L2 bidder |
| 3 | Rejected-Technical | - | - | Rejected-Technical L3 bidder |
| Sl No | Description | Qty | Unit | Subilesh KM L1 | VINCENT V J L3 | AMEER ALI V M L2 |
|---|---|---|---|---|---|---|
| 1.00Building construction | ||||||
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 109.25 | cum | 250 ₹27,313.25 Lowest | 305.52 ₹33,378.98 | 325 ₹35,507.23 |
| 1.00 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 27.31 | cum | 250 ₹6,828.25 | 122.28 ₹3,339.83 | 118 ₹3,222.93 Lowest |
| 1.00 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 10.81 | cum | 6,500 ₹70,245.5 Lowest | 7,404.03 ₹80,015.35 | 7,181.88 ₹77,614.58 |
| 1.00 | OD310007/2025-2026:Providing and laying in position machine batched and machine mixed design mix M- 25 grade
cement concrete for reinforced cement concrete work, using cement content as per approved
design mix, including pumping of concrete to site of laying but excluding the cost of centering,
shuttering, finishing and reinforcement, including admixtures in recommended proportions as
per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing
strength and durability as per direction of Engineer-in-charge. Note: Cement content considered
in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is not payable or
recoverable separately. All work up to plinth level | 37.83 | cum | 9,000 ₹3,40,452 Lowest | 10,163.59 ₹3,84,468.28 | 9,858 ₹3,72,908.42 |
| 1.00 | OD77563/2026-2027:Dry rubble masonry with hard stone in foundation and plinth up to plinth level .Including cost of all material ,labour charges etc .Based on 60.7.1 | 28.72 | cum | 3,500 ₹1,00,523.5 Lowest | 3,727.23 ₹1,07,049.77 | 3,615 ₹1,03,826.42 |
| 1.01 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 2.17 | cum | 9,000 ₹19,494 Lowest | 9,789.52 ₹21,204.1 | 9,495.33 ₹20,566.88 |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 3,935.34 | kilogram | 95 ₹3,73,857.3 Lowest | 104.93 ₹4,12,935.23 | 101.75 ₹4,00,420.85 |
| 1.01 | OD310008/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. Note:- Cement content considered in this item is @ 330 kg/cum. Excess or less cement used as per design mix is not payable or recoverable separately. All work above plinth level upto floor V level | 52.91 | cum | 9,000 ₹4,76,226 Lowest | 12,062.45 ₹6,38,272.48 | 11,700 ₹6,19,093.8 |
| 1.01 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | 6,396.47 | kg | 95 ₹6,07,664.65 Lowest | 104.93 ₹6,71,181.6 | 101.75 ₹6,50,840.82 |
Tender Value
₹42.4 L
EMD Value
₹50,000
Closing Date
1 Aug 2026, 4:00 pmClosed
Executive Engineer
PWD Buildiings Division Kalpetta wayanad
LAC-ADS-MLA ADF-2024-25 Construction of Padichira Model village office
2026_PWD_862197_1
PWD/BLDG/4605/2026-2027
Open Tender
Civil Works - Buildings
Item Rate
360 days
Pulpally
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
14 Sept 2026
24 Jul 2026
3 Aug 2026
24 Jul 2026
1 Aug 2026
24 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Building construction | |||||
| 1.001 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 0.2 | cum | - | - |
| 1.002 | 2.26.1:Extra for every additional lift 1.5 m or part there of in excavation / banking excavated or stacked materials.All kinds of soil | 1 | cum | - | - |
| 1.003 | 4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | - | cum | - | - |
| 1.004 | OD310007/2025-2026:Providing and laying in position machine batched and machine mixed design mix M- 25 grade
cement concrete for reinforced cement concrete work, using cement content as per approved
design mix, including pumping of concrete to site of laying but excluding the cost of centering,
shuttering, finishing and reinforcement, including admixtures in recommended proportions as
per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing
strength and durability as per direction of Engineer-in-charge. Note: Cement content considered
in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is not payable or
recoverable separately. All work up to plinth level | - | cum | - | - |
| 1.005 | OD77563/2026-2027:Dry rubble masonry with hard stone in foundation and plinth up to plinth level .Including cost of all material ,labour charges etc .Based on 60.7.1 | - | cum | - | - |
| 1.006 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1 | cum | - | - |
| 1.007 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | - | kilogram | - | - |
| 1.008 | OD310008/2025-2026:Providing and laying in position machine batched and machine mixed design mix M-25grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. Note:- Cement content considered in this item is @ 330 kg/cum. Excess or less cement used as per design mix is not payable or recoverable separately. All work above plinth level upto floor V level | - | cum | - | - |
| 1.009 | 5.22A.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more | - | kg | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1458395.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
viewsbd.pdf
Tender Documents • 1.64 MB
BOQ_1458395.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .