| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 CrAdmitted-Finance | ₹10.7 Cr | L1 | Admitted-Finance |
| 2 | L2₹13.2 Cr+₹2.5 Cr (23.2%)Admitted-Finance | ₹13.2 Cr+₹2.5 Cr (23.2%) | L2 | Admitted-Finance |
| 3 | L3₹13.8 Cr+₹3.1 Cr (28.5%)Admitted-Finance | ₹13.8 Cr+₹3.1 Cr (28.5%) | L3 | Admitted-Finance |
| 4 | L4₹14.0 Cr+₹3.2 Cr (30.0%)Admitted-Finance | ₹14.0 Cr+₹3.2 Cr (30.0%) | L4 | Admitted-Finance |
| 5 | L5₹14.9 Cr+₹4.2 Cr (38.9%)Admitted-Finance | ₹14.9 Cr+₹4.2 Cr (38.9%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MS TT CONSTRUCTION COMPANY L2 | M/s AGAM CONSTRUCTION L7 | M/S SONIA ENTERPRISES L5 | HARDAYAL CONSTRUCTIONS & PROJECTS LLP L8 | M/s KMP Traders L6 | M/s North East Engineering & Construction Agency L3 | M/S TSERING DHONDUP L4 | M/s A&S Associates L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Surfacing Work on Kaying -Tato Road bet Km 11.350 to Km 19.950 | |||||||||||
| 1.10 | Providing, Laying, Spreading and compacting graded stone aggregate grading as per Table -400-13 and satisfying the physical requirement as per Table No. 400-12 of MoRT&H (5th revision) specification for WMM 100 mm compacted thickness, including premixing the materials with water to OMC in mechanical mix (Pug Mill) laying in uniform layers in Sub-base/Base course on a well prepared base compacting with power vibratory roller to achieve the desired density including guarding | 78,408 | Sqm | 390 ₹3,05,79,120 | 401 ₹3,14,41,608 | 552 ₹4,32,81,216 | 371 ₹2,90,89,368 | 382 ₹2,99,51,856 | 225 ₹1,76,41,800 Lowest | 308.55 ₹2,41,92,788.4 | 315 ₹2,46,98,520 |
| 1.20 | Providing, Laying, Spreading and compacting graded stone aggregate grading as per Table -400-13 and satisfying the physical requirement as per Table No. 400-12 of MoRT&H (5th revision) specification for WMM 75 mm compacted thickness, including premixing the materials with water to OMC in mechanical mix (Pug Mill) laying in uniform layers in Sub-base/Base course on a well prepared base compacting with power vibratory roller to achieve the desired density including guarding | 1,56,816 | Sqm | 255 ₹3,99,88,080 | 291 ₹4,56,33,456 | 342 ₹5,36,31,072 | 260 ₹4,07,72,160 | 286 ₹4,48,49,376 | 176.3 ₹2,76,46,660.8 Lowest | 237.49 ₹3,72,42,231.84 | 238 ₹3,73,22,208 |
| 1.30 | Providing and laying of DBM 50 mm compacted thickness as per clause 505 of MoRT&H (5th Revision) and particular specification | 62,370 | Sqm | 432 ₹2,69,43,840 | 774 ₹4,82,74,380 | 312 ₹1,94,59,440 Lowest | 1,100 ₹6,86,07,000 | 763 ₹4,75,88,310 | 586 ₹3,65,48,820 | 585.31 ₹3,65,05,784.7 | 343 ₹2,13,92,910 |
| 1.40 | Providing and laying of BC 30 mm compacted thickness as per clause 507 of MoRT&H (5th Revision) and particular specification | 62,370 | Sqm | 421 ₹2,62,57,770 | 529 ₹3,29,93,730 | 384 ₹2,39,50,080 | 710 ₹4,42,82,700 | 529 ₹3,29,93,730 | 750 ₹4,67,77,500 | 431.03 ₹2,68,83,341.1 | 149 ₹92,93,130 Lowest |
| 1.50 | Providing and applying of Prime Coat with bitumen emulsion as per clause 502 of MoRT&H (5th Revision) and particular specification | 64,152 | Sqm | 62 ₹39,77,424 | 115 ₹73,77,480 | 78 ₹50,03,856 | 54 ₹34,64,208 Lowest | 115 ₹73,77,480 | 61 ₹39,13,272 | 82.28 ₹52,78,426.56 | 88 ₹56,45,376 |
| 1.60 | Providing and applying of Tack Coat with bitumen emulsion as per clause 503 of MoRT&H (5th Revision) and particular specification | 1,24,740 | Sqm | 19 ₹23,70,060 Lowest | 88 ₹1,09,77,120 | 28 ₹34,92,720 | 40 ₹49,89,600 | 88 ₹1,09,77,120 | 28 ₹34,92,720 | 62.64 ₹78,13,713.6 | 65 ₹81,08,100 |
| 1.70 | Edge/Centre Line road Marking (2.50 MM thick) with hot applied thermoplastic compound with reflecting glass bids on bituminous surface as per clause 803 of MoRT&H (5th Revision) and particular specification | 2,525 | Sqm | 850 ₹21,46,250 | 735 ₹18,55,875 | 152 ₹3,83,800 Lowest | 1,100 ₹27,77,500 | 735 ₹18,55,875 | 764.37 ₹19,30,034.25 | 687.22 ₹17,35,230.5 | 370 ₹9,34,250 |
Tender Value
₹14.8 Cr
EMD Value
₹10.6 L
Closing Date
30 Dec 2024, 11:00 amClosed
Chief Engineer Project Brahmank
HQ CE (P) Brahmank Pasighat, East Siang AP
Execution of Surfacing Work WMM 100/50 mm Thick, DBM 50 mm, BC 30mm thick incl edge line marking, Prime coat and Tack coat on Kaying-Tato road Km 11.350 to 19.950 in the AoR of 92 RCC/44TF/Project Brahmank
2024_BRO_687829_1
CE (P) BMK/14/2024-25
Open Tender
Civil Works - Roads
Item Rate
547 days
Kaying-Tato road
As per Tender documents
6 documents required · 6 mandatory
₹0
₹10.6 L
Yes
HQ CE (P) Brahmank Pasighat
4 Apr 2025
9 Dec 2024
31 Dec 2024
9 Dec 2024
30 Dec 2024
16 Dec 2024
10 Dec 2024 - 16 Dec 2024
16 Dec 2024
Amount
Surfacing Work on Kaying -Tato Road bet Km 11.350 to Km 19.950
Providing, Laying, Spreading and compacting graded stone aggregate grading as per Table -400-13 and satisfying the physical requirement as per Table No. 400-12 of MoRT&H (5th revision) specification for WMM 100 mm compacted thickness, including premixing the materials with water to OMC in mechanical mix (Pug Mill) laying in uniform layers in Sub-base/Base course on a well prepared base compacting with power vibratory roller to achieve the desired density including guarding
Providing, Laying, Spreading and compacting graded stone aggregate grading as per Table -400-13 and satisfying the physical requirement as per Table No. 400-12 of MoRT&H (5th revision) specification for WMM 75 mm compacted thickness, including premixing the materials with water to OMC in mechanical mix (Pug Mill) laying in uniform layers in Sub-base/Base course on a well prepared base compacting with power vibratory roller to achieve the desired density including guarding
Providing and laying of DBM 50 mm compacted thickness as per clause 505 of MoRT&H (5th Revision) and particular specification
Providing and laying of BC 30 mm compacted thickness as per clause 507 of MoRT&H (5th Revision) and particular specification
Providing and applying of Prime Coat with bitumen emulsion as per clause 502 of MoRT&H (5th Revision) and particular specification
Providing and applying of Tack Coat with bitumen emulsion as per clause 503 of MoRT&H (5th Revision) and particular specification
Edge/Centre Line road Marking (2.50 MM thick) with hot applied thermoplastic compound with reflecting glass bids on bituminous surface as per clause 803 of MoRT&H (5th Revision) and particular specification
MS TT CONSTRUCTION COMPANY (BID ID -3190876)
M/s North East Engineering & Construction Agency (BID ID -3200430)
M/S TSERING DHONDUP (BID ID -3197937)
M/S SONIA ENTERPRISES (BID ID -3201325)
M/s KMP Traders (BID ID -3198302)
M/s AGAM CONSTRUCTION (BID ID -3196001)
HARDAYAL CONSTRUCTIONS & PROJECTS LLP (BID ID -3201685)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.84 MB
BOQ_769954.xls
BOQ • 0.28 MB
80315TD.pdf
Tender Documents • 1.37 MB
IP.pdf
Additional Documents • 0.64 MB
NIT.pdf
Additional Documents • 3.82 MB
BOQ.xls
BOQ • 0.28 MB
Tenderdocument.pdf
Tender Documents • 3.82 MB
Tenderdocument_2.pdf
Tender Documents • 0.64 MB
Tenderdocument_3.pdf
Tender Documents • 1.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .