| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹6.4 L+₹11,485 (1.84%)Rejected-AOC | L2 | Rejected-AOC Higher rate hence not accepted |
Tender Value
₹5.7 L
EMD Value
₹14,335
Closing Date
11 Sept 2023, 5:00 pmClosed
Sangeetha S S
Office of the AEE, MI Sub Division Adoor
GENERAL Annual Maintanance 2023 24 Annual Maintanance of Various L I Stations Under M I Section Adoor Civil works General Civil Work
2023_Irrig_598677_1
IRR/IA/TR/3456/2023_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
180 days
Pandalam Municipality and Thumpamon Panchayath
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,265
Yes
₹14,335
Yes
12 Oct 2023
25 Aug 2023
14 Sept 2023
25 Aug 2023
11 Sept 2023
25 Aug 2023
Amount
Kakkathuruth L.I.Station
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD5825/2023-2024:Earth work excavation by mechanical meqans (Hydraulic excavator /mannual means)including getting out and depositing of excavated earth lead upto 50m and lift upto 3mas directed by the engineer in charge
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Erattady L.I.Station.
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD5826/2023-2024:Earth work excavation by mechanical meqans (Hydraulic excavator /mannual means)including getting out and depositing of excavated earth lead upto 50m and lift upto 3mas directed by the engineer in charge
Muttar L.I.Station
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD5823/2023-2024:Earthwork excavation by mechanical means (Hydraulic excavator/ manual means) including getting out and depositing of excavated earth lead up to 50m and lift up to 3.00 m as directed by the Engineer in charge.
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Iranikkudy L.I.Station
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD5824/2023-2024:Earth work excavation by mechanical meqans (Hydraulic excavator /mannual means)including getting out and depositing of excavated earth lead upto 50m and lift upto 3mas directed by the engineer in charge
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Manjanakulam L.I.Station
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD5827/2023-2024:Earth work excavation by mechanical meqans (Hydraulic excavator /mannual means)including getting out and depositing of excavated earth lead upto 50m and lift upto 3mas directed by the engineer in charge
2.31:Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared
Thumpamon L.I.Station
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD5828/2023-2024:Earth work excavation by mechanical meqans (Hydraulic excavator /mannual means)including getting out and depositing of excavated earth lead upto 50m and lift upto 3mas directed by the engineer in charge
Kadakkad L.I.Station
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
OD5829/2023-2024:Earth work excavation by mechanical meqans (Hydraulic excavator /mannual means)including getting out and depositing of excavated earth lead upto 50m and lift upto 3mas directed by the engineer in charge
Devarajan P K
Bidder Name
Devarajan P K
SUMA T P
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_888747.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .