Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.3 LAccepted-AOC BISHALGARH SEPAHIJALA 799102 | SEPAHIJALA | TRIPURA | 799102 | L1 | Accepted-AOC 1st Lowest Bidder and fulfil all the Terms and condition | |
| 2 | L2₹14.9 L+₹58,537.73 (4.09%)Rejected-AOC | L2 | Rejected-AOC Not lowest Bidder | |
| 3 | L3₹18.8 L+₹4.5 L (31.3%)Rejected-AOC TOWN PRATAPGARH CENTRAL ROAD EXTN AGARTALA | AGARTALA | TRIPURA | L3 | Rejected-AOC Not lowest Bidder | |
| 4 | L4₹16.8 L+₹2.5 L (17.3%)Rejected-AOC DHARMANAGAR TELIAMURA KHOWAI TRIPURA | TELIAMURA | KHOWAI | TRIPURA | L4 | Rejected-AOC Not lowest Bidder |
Tender Value
₹18.1 L
EMD Value
₹36,134
Closing Date
13 Mar 2025, 3:00 pmClosed
the Executive Engineer, RD Teliamura Division, Tel
O/o the Executive Engineer, RD Teliamura Division, Teliamura, Khowai District
02(Two) nos Electrification works for the office of the Executive Engineer, RD Teliamura Division namely i) Maintenance of Internal Electrical work as per PWD SoR I/E- 2021 ii) Installation and Commissioning of 35KVA 3 phase Generator
2025_CERDD_59193_1
76/IE-35KVA/3P-G/CF/RD/TLM 3/3/25
Open Tender
Electrical Works
Percentage
45 days
As per DNIT
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,000
₹36,134
3 Apr 2025
5 Mar 2025
13 Mar 2025
5 Mar 2025
13 Mar 2025
5 Mar 2025
eProcurement System of Government of Tripura Created By: Sushmita Sen Created Date/Time: 17-Mar-2025 03:22 PM Tender Title: 02(Two) nos Electrification works for the office of the Executive Engineer, RD Teliamura Division namely i) Maintenance of Internal Electrical work as per PWD SoR I/E- 2021 ii) Installation and Commissioning of 35KVA 3 phase Generator Tender ID: 2025_CERDD_59193_1
Tender Inviting Authority: Executive Engineer, RD Teliamura Division
Name of Work: 02(Two) nos Electrification works for the office of the Executive Engineer, RD Teliamura Division namely i) Maintenance of Internal Electrical work as per PWD SoR I/Electrification- 2021 & ii) Installation and Commissioning of 35KVA 3 phase Generator with RCC Base and GCI Sheet roofing.
DNIT No: e-DT-76/IE-35KVA/3P-G/CF/EE/RD/TLM- DIV/2024-25, Dt.03/03/2025.
SCHEDULE OF WORK / ITEM(S)
Sl.No Bidder Name Estimated Rate Quoted Percentage Quoted Rate in Figures and Words (Iteration 0)
1.00 TAPASH DEBNATH (GSTN-16AGXPD1104B1ZZ) BID ID -169301 1806720.00 -20.79 1431102.91 Fourteen Lakh Thirty One Thousand One Hundred and Two
2.00 BAPI BARDHAN (GSTN-16AHPPB8509F1ZC) BID ID -169665 1806720.00 3.99 1878808.13 Eighteen Lakh Seventy Eight Thousand Eight Hundred and Eight
3.00 GANESH CHANDRA DEY (GSTN-NA) BID ID -169901 1806720.00 -17.55 1489640.64 Fourteen Lakh Eighty Nine Thousand Six Hundred and Fourty
4.00 Nayan Debnath (GSTN-NA) BID ID -169971 1806720.00 -7.11 1678262.21 Sixteen Lakh Seventy Eight Thousand Two Hundred and Sixty Two
Lowest Amount Quoted BY: TAPASH DEBNATH(1431102.91)
BOQ Summary Details Tender Title: 02(Two) nos Electrification works for the office of the Executive Engineer, RD Teliamura Division namely i) Maintenance of Internal Electrical work as per PWD SoR I/E- 2021 ii) Installation and Commissioning of 35KVA 3 phase Generator Tender ID: 2025_CERDD_59193_1
Sheet Name Sl.No Bidder Name Amount Bid Rank
BoQ1 1 TAPASH DEBNATH (BID ID -169301) 1431102.91 L1
2 GANESH CHANDRA DEY (BID ID -169901) 1489640.64 L2
3 Nayan Debnath (BID ID -169971) 1678262.21 L3
4 BAPI BARDHAN (BID ID -169665) 1878808.13 L4
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .