| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAdmitted-Finance | ₹1.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.3 Cr+₹4,107.66 (0.03%)Admitted-Finance | ₹1.3 Cr+₹4,107.66 (0.03%) | L2 | Admitted-Finance |
| 3 | L3₹1.3 Cr+₹17,374.90 (0.14%)Admitted-Finance POLICE LINE ROAD KUMOUR PITHORAGARH | ₹1.3 Cr+₹17,374.90 (0.14%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Saun Engineering and Construction Co P Ltd L3 | WALDIA AND SONS L2 | M/s Shahi Electricals L1 |
|---|---|---|---|---|---|---|
| 1.00Cartage of following material from store centre to Road site with loading & unloading at both points approx distance 71-100 Km | ||||||
| 2.00 | Steel pole 8.5 mtr. SP-23 (BPHD) | 608 | No | 730 ₹4,43,840 | 725 ₹4,40,800 Lowest | 730 ₹4,43,840 |
| 3.00 | Steel pole 8.5 mtr. SP-21 (BPHD) | 60 | No | 690 ₹41,400 | 680 ₹40,800 Lowest | 685 ₹41,100 |
| 4.00 | Steel pole 8.0 mtr. SP-10 (BPHD) | 60 | No | 690 ₹41,400 | 680 ₹40,800 Lowest | 685 ₹41,100 |
| 5.00 | T/F 11/0.4 KV 25 KVA | 6 | No | 4,680 ₹28,080 | 4,650 ₹27,900 | 4,600 ₹27,600 Lowest |
| 6.00 | T/F 11/0.4 KV 16 KVA | 6 | No | 4,680 ₹28,080 | 4,650 ₹27,900 | 4,600 ₹27,600 Lowest |
| 7.00 | Other material | 595.5 | Qtl | 573 ₹3,41,221.5 | 569 ₹3,38,839.5 Lowest | 571 ₹3,40,030.5 |
| 8.00Head load cartage of following material from road site to construction site approx distance 12.0 Km | ||||||
| 9.00 | Steel pole 8.5 mtr. SP-23 (BPHD) | 608 | No | 3,000 ₹18,24,000 | 2,996 ₹18,21,568 | 2,995 ₹18,20,960 Lowest |
| 10.00 | Steel pole 8.5 mtr. SP-21 (BPHD) | 60 | No | 2,950 ₹1,77,000 | 2,980 ₹1,78,800 | 2,900 ₹1,74,000 Lowest |
Tender Value
₹1.3 Cr
EMD Value
₹2.6 L
Closing Date
8 Oct 2024, 4:00 pmClosed
SUPERINTENDING ENGINEER
SE OFFICE EDC PITHORAGARH
CONSTRUCTION OF 11 KV AND LT LINE WITH INSTALLATION OF DTR TO ELECTRIFIED VILLAGE NAMIK IN NACHNI SECTION UNDER EDD DHARCHULA
2024_UPCL3_76241_1
08/EDC(P)/2024-25
Open Tender
Electrical Works
Item Rate
120 days
DHARCHULA
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
EE EDD UPCL PITHORAGARH
₹2.6 L
14 Nov 2024
24 Sept 2024
9 Oct 2024
24 Sept 2024
8 Oct 2024
24 Sept 2024
Amount
Cartage of following material from store centre to Road site with loading & unloading at both points approx distance 71-100 Km
Steel pole 8.5 mtr. SP-23 (BPHD)
Steel pole 8.5 mtr. SP-21 (BPHD)
Steel pole 8.0 mtr. SP-10 (BPHD)
T/F 11/0.4 KV 25 KVA
T/F 11/0.4 KV 16 KVA
Other material
Head load cartage of following material from road site to construction site approx distance 12.0 Km
Steel pole 8.5 mtr. SP-23 (BPHD)
Steel pole 8.5 mtr. SP-21 (BPHD)
Steel pole 8.0 mtr. SP-10 (BPHD)
T/F 11/0.4 KV 25 KVA
T/F 11/0.4 KV 16 KVA
Other material
Exavation of earth for pole pit of size 0.9x0.9x1/6 of full lenth of polestay pit size 0.6x0.6x1.2 mtrin all types of soil including proper dressing of including proper dressing of sides and ramming of bottom including getting out the excavted soil and disposelof surplus and disposel of surplus excaveted soll as directed complete work.
Steel pole 8.5 mtr. SP-23 (BPHD)
Steel pole 8.5 mtr. SP-21 (BPHD)
Steel pole 8.0 mtr. SP-10 (BPHD)
Erection of pole support as per RESSPO specification of the following types of poles in boulder mixed soil, grouting of support in CC 1:4:8 block incuding cost of ballast,cement and sand, back filling of soil and boulders in pit and ramming filling of accessories of the pole, leveling and erection of pole
SP-23 (with CC) Four Pole
SP-23 (with CC) Double Pole
SP-23 (with CC) Single Pole
SP-21 (with CC) Single Pole
SP-10 (with CC) Single Pole
Grouting of pole in size 0.45x0.45x1/6 of the supprt in cc ratio 1:4:8 block including cost of cement sand and stone ballast back filling of soil and boulders in pit and ramming and proper allignment leveling as per resspo construction manual
Steel pole 8.5 mtr. SP-23 (BPHD)
Steel pole 8.5 mtr. SP-21 (BPHD)
Steel pole 8.0 mtr. SP-10 (BPHD)
Muffing of poles with CC1;3;6 block and 45 Cm hight from ground level including cost of ballast, cement & sand
Fabriction of MS Channel, angle iron after cutting in requeired sizes with drilling of holes upto good finish for top channel, bracing and special type bracket etc as per RESSPO
Exavation of earth for stay pit size 0.6x0.6x1.2 mtrin all types of soil including proper dressing of sides and ramming of bottom including getting out the excavted soil and disposelof surplus and disposel of surplus excaveted soll as directed complete work.
Fixing,tightining and nozzaling of stay with pole and stay rod on required tension as per drawing /resspo manual for 11KV line
Fixing,tightining and nozzaling of stay with pole and stay rod on required tension as per drawing /resspo manual for LT line
Grouting of stay in size 0.6x0.6x0.3 in cc ratio 1:4:8 block including cost of cement sand and stone ballast back filling of soil and boulders in pit and ramming and proper allignment leveling as per resspo construction manual(16X0.108)
Erection & earthing of support with MS Earth rod of 2.5 Mtr long incuding exavation of pit and digging of MS rod proper depth and connecting the earth electrode with the GI wire as per instruction manual
Laying, spreading, stringing and sagging of 11 KV line in 3 P 4 W of the Rabbit conductor with GI earth wire complete including fixing of all accessories in 3 Nos conductor in parallel with binding and jupering as per profile and sagging chart
Laying, spreading, stringing and sagging of LT line of the following wire as phase wire with G.I. wire complete with binding and jumoering as per RESSPO specn
ACSR Weasel conductor 3 Phase 4 Wire
ACSR Weasel conductor 1 Phase 2 Wire
Guarding of LT/11 KV Line over (Telephone / Road / L.T. line crossing as per drawing with 6/8 SWG G.I. wire including fixing of guar ding channel/ angle as per RESSPO manual.
Earthing of distribution T/F incuding digging of pit of size 2.5 mtr depth and make hole of size 150mm. Placing of earthing electrode(to be supplied by contractor as per drawing No A) as drawing B, connecting the same with GI strip(to be supplied by contractor) of size 35x6 mm as per drawing C for a minimum length 6 mm, treatment of soil with highly conductive subustance as per IS 30343 complete in all respect, result of earthing resistance to be recorded in MB before and after instalation of earthing. the earth resistance after earthing should be less then 1 Ohm.
Mounting/fixing of fuse set on doble pole structure including making of connection complete work.
Mounting & fixing of LA set(3 No) on double pole structure including making all connection vy GI strip size 35x6 mm to earth point(incuding cost of GI strip)
Mounting/fixing of TPMO on doble pole structure including making of connection complete work.
Installation/Mounting following T/F on old D/P structure and fixing of channel and making all connections of HT and LT and its complete commissioning.
T/F 11/0.4 KV 25 KVA
T/F 11/0.4 KV 16 KVA
Route clearance by cutting of tree branches/ proning, loping and chopping of trees for 11 KV line
T-off Connection Complete 11 KV line
Excavation in all type of soil including ramming and dressing of surface
11KV DOUBLE/FOUR POLE(4.97X37)
Base concreting in 1:6:12 cc
11KV DOUBLE/FOUR POLE(1.66X37)
R&R Stone Massonary in 1:6 course fine sand & cement
11KV DOUBLE/FOUR POLE(19.6X37)
Top concreting in 1:2:4 cc
11KV DOUBLE/FOUR POLE(0.34X37)
HP stone filling
11KV DOUBLE/FOUR POLE(6.72X37)
WALDIA AND SONS (BID ID -337461)
Saun Engineering and Construction Co P Ltd (BID ID -337253)
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.88 MB
08namikform.pdf
Tender Documents • 1.28 MB
BOQ_91013.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .