Tender Value
₹36.5 L
EMD Value
₹1.1 L
Closing Date
22 Sept 2026, 4:00 pm
Chairman and Executive Officer
Nagar Palika Parishad Sitarganj.
Ward No 02 main janaaze ki namaaz ki buliding ka nirman kary
2026_NPPS1_99902_1
646/nppstg/2026-27/2026
Open Tender
Civil Works
Percentage
180 days
Ward No 02 main Janaaza Namaaz Gher
as per bid term and condition (ATC documents)
2 documents required · 2 mandatory
₹3,540
E.O. Nagar Palika Parishad
₹1.1 L
9 Sept 2026
9 Sept 2026
24 Sept 2026
9 Sept 2026
22 Sept 2026
9 Sept 2026
9 Sept 2026 - 22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1वार्ड न० 02 में जनाज़े की नमाज़ की बल्डिंग निर्माण कार्य I | |||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer in-charge. | 75.42 | Cum | 177.5 | ₹13,387.05 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 6.53 | Cum | 6,812 | ₹44,482.36 |
| 1.03 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 8.49 | Cum | 9,045.75 | ₹76,798.42 |
| 1.04 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns,pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement :1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size) | 25.55 | Cum | 10,852.95 | ₹2,77,292.87 |
| 1.05 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering,shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 48.03 | Cum | 11,505.5 | ₹5,52,609.17 |
| 1.06 | Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete | 37.76 | Sqm | 392.15 | ₹14,807.58 |
| 1.07 | Centering and shuttering including strutting, propping etc. and removal of form for :Lintels, beams, plinth beams, girders, bressumers and cantilevers | 81.55 | Sqm | 736.4 | ₹60,053.42 |
| 1.08 | Centering and shuttering including strutting, propping etc. and removal of form for :Columns, Pillars, Piers, Abutments, Posts and Struts | 76.1 | Sqm | 961.3 | ₹73,154.93 |
| 1.09 | Centering and shuttering including strutting, propping etc. and removal of form for :Suspended floors, roofs, landings, balconies and access platform | 394.5 | Sqm | 927.25 | ₹3,65,800.13 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.38 MB
nittermandconditions.pdf
Tender Documents • 3.37 MB
BOQ_117805.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .