Loading…
Loading…
Tender Value
₹30.1 L
EMD Value
₹30,200
Closing Date
21 May 2026, 6:00 pmClosed
CHIEF OFFICER NAGAR PALIKA BODELI
BID DOCUMENTS FOR CONSTRUCTION WORK OF ASPHALT ROAD FROM RAMJI MANDIR GARNADA TO DHOKALIYA CHOKDI AT BODELI NAGARPALIKA UNDER: SWARNIM JAYANTI MUKHYA MANTRI SAHERI VIKAS YOJANA (UDP-88) YEAR: 2025-26
304176
580/2026 DATE -06/05/2026
Open
Civil Works - Roads
Chhota Udaipur
3 documents required · 3 mandatory
₹1,770
CHIEF OFFICER, BODELI NAGARPALIKA, BODELI
₹30,200
11 May 2026
11 May 2026
11 May 2026
21 May 2026
11 May 2026
Item Qty. Description Total Unit Amount
1 338.00 Box Cutting the Road Surface to proper slope and camber for
Cmt making a base for road work including removing the excavated
stuff and dipositing to road slope as directed all lead and lift etc.
complete upto 50 mt. Lead 106.81 Cmt
2 254.00 Providing and Laying Bituminous Grout 37.5 mm thick compacted
MT with B.T. aggregates as M.O.R.T.&H. specification and asphalt
Grade: 60/70 (VG-30) for Tack Coat @ 2.50 Kg./10 Smt. with
Mechanical Sprayer and asphalt for Mixing @ 19.90 Kg./M.T. i.e.,
1.99% of totala weight mix including heating and mixing asphalt
and aggregate by continuous batching drum mix plant and laying
with paver finisher and consolidation with vibratory roller, including
cost of labour, material and plant, fuel, oil, kerosene, labour
charges etc. complete using contractor's machinery drum mix plant
and paver finisher etc. complete.
3 279.00 Providing and laying 37.5 mm thick Bituminous Macadam with B.T.
MT aggregate as per M.O.R.T. & H. specification and asphalt Grade:
V.G.-30 (60/70) for tack coat @ 2.50 KG. / 10 Sq.m. with
mechanical sprayer and asphalt Grade: V.G.-30 (60/70) for mixing
@ 34.00 KG. / M.T. i.e. 3.40 % of total weight of mix including
heating and mixing the aggregate and asphalt in Drum mix plant
and spreading the same by paver finisher and consolidation with
vibratory roller, including providing all materials equipments, tools
and plants, fire wood, oil, kerosene, labour charges etc. complete
using contractor's own machinery Drum mix plant and paver
finisher etc. complete. 3154.64 MT
4 195.00 Providing and laying 25 mm thick Semi Dense Bituminous
MT Concrete with B.T. aggregate as per M.O.R.T. & H. gradation,
asphalt Grade: VG-30 (60/70) for mixing @ 50.00 KG. / M.T. i.e.
5.0% by weight of total mix including heating and mixing the
aggregate and asphalt by continuous batching of drum mix plant
and spreading the same by paver finisher and consolidation with
vibratory roller, including providing all materials equipments, tools
and plants, oil, kerosene, firewood, labour charges etc. complete
using contractor's own machineries drum mix plant and paver
finisher etc. complete. 3751.26 MT
SBD SECTION-7 BILL OF QUANTITIES-152
5 3380.00 Providing and laying Bituminous Painting on B.T. Surface with
Smt bitumen VG-30 at the rate of 5.00 Kg./10.00 Smt. by Mechanical
Sprayer and spreading flushing sand or stone dust on painting
surface of the road at the rate of 0.03 Cmt./10 Smt. with brooming
and rolling with PTR Roller. Rates including all cost of sand/stone
dust, equipment T & P firewood, oil, kerosene, labour charges etc.
complete by using contractor's own machineries.
Add 18% GST charges Rs.
Add 2% Contengency charges Rs.
Add 1% Quality Control charges Rs.
I / We am/are willing to carry out the work at _____________ % above / below (percent should be written in figure and in words) of the
estimated rates mentioned above. Amount of my/our tender works out as under.
( In words ) _________________________ percentage above / below the estimated rate.
Estimated Amount put to tender Rs.
Deduct _______ % below Rs. Rs.
Estimated Amount put to tender Rs.
Add _______ % above Rs. Rs.
Total Amount Rs.
Total Amount Rs.
Note :1 All work shall be carried out as per Public Works Department Hand Book and other specifications of Division or as
Note :2 Rates quoted include clearance of site (prior commencement of work and its close) in all respects and hold good for
I/ We have read the conditions mentioned in this tender and agree to abide by the same.
Note :4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R.: PRC-10/2017
Cement Consumption/16/C Date:11/05/2017 as stated in S.O.R. therefore in R.C.C. items where there is a change
as per actual mix design the cost of difference of cement consumption have been deducted from the rate of original
item at the rate of input rate mentioned in all the tender.
Signature of Contractor President Chief Officer
Bodeli Nagarpalika Bodeli Nagarpalika
SBD SECTION-7 BILL OF QUANTITIES-153
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
SBD.pdf
BOQ.pdf
OTHER IMPORTANT-1.pdf
OTHER IMPORTANT-2.pdf
OTHER IMPORTANT-3.pdf
Download all tender documents and submit your bid