| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹22.9 LAccepted-AOC V P O KOSRI TEHSIL JAISINGHPUR DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 175013 | ₹22.9 L | L-1 | Accepted-AOC Found Lowest One |
| 2 | L-2₹24.7 L+₹1.8 L (7.89%)Rejected-Finance | ₹24.7 L+₹1.8 L (7.89%) | L-2 | Rejected-Finance High rate quoted |
| 3 | L-3₹25.8 L+₹2.8 L (12.3%)Rejected-Finance R O VILL HASOL P O CHUKHATH TEHSIL JAWALAMUKHI DISTT KANGRA | KANGRA | HIMACHAL PRADESH | 175013 | ₹25.8 L+₹2.8 L (12.3%) | L-3 | Rejected-Finance High rate quoted |
| 4 | L-4₹29.4 L+₹6.5 L (28.3%)Rejected-Finance | ₹29.4 L+₹6.5 L (28.3%) | L-4 | Rejected-Finance High rate quoted |
| 5 | L-5₹30.3 L+₹7.4 L (32.2%)Rejected-Finance | ₹30.3 L+₹7.4 L (32.2%) | L-5 | Rejected-Finance High rate quoted |
| Sl No | Description | Qty | Unit | JITENDER RANA L1 | Himanshu Dewan L5 | TASHI INFRASTRUCTURE L4 | M/S VIKAS CONSTRUCTION L3 | TECHPRO ENGINEERING COMPANY L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundation trenches etc. in earth work in all kinds of soil such as pick work,jumper work,blasting in soft and hard rock and chiselling work including saturated soil slushy soil and under floor upto all depth and stacking the excavated soil not more than 3 metre clear from the edge of excavation and then returning the stacked soil in 15 centimetre (Fifteen centimetre) layer when required into plinth sides of foundation etc.consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated earth as directed by the Engineer-in-charge within all leads and lifts. | 6.14 | Cubic metre | 270 ₹1,657.8 | 415 ₹2,548.1 | 380 ₹2,333.2 | 150 ₹921 Lowest | 280 ₹1,719.2 |
| 2.00 | Removal of slips/silt/dumped stones or mulba including stacking of serviceable and unserviceable material and disposed of the material upto a lead of 20 metre and disposed material to be neat;ly dressed within all leads and lifts as per the direction of Engineer-in-charge. | 35.1 | Square metre | 250 ₹8,775 | 295 ₹10,354.5 | 280 ₹9,828 | 150 ₹5,265 Lowest | 400 ₹14,040 |
| 3.00 | Providing and laying cement concrete 1:3:6 (One cement is to three sand is to six graded stone aggregate 40 milimetre nominal size) and curing complete excluding the cost of form work in foundation and plinth within all leads and lifts as per the direction of Engineer-in-charge. | 28.59 | Cubic metre | 5,600 ₹1,60,104 | 7,650 ₹2,18,713.5 | 7,400 ₹2,11,566 | 6,200 ₹1,77,258 | 5,300 ₹1,51,527 Lowest |
| 4.00Providing and laying cement concrete 1:2:4 (One cement is to two sand is to four graded stone aggregate 20 milimetre nominal size) and curing complete excluding the cost of form work and reinforcement for reinforced cement concrete work in:- | ||||||||
| 5.00 | a) Walls (any thickness) butt not less then 0.10 metre thickness) attached pillasters, buttresses, plinth and string courses etc. from top of foundation up to floor two level with in all leads and lifts as per the direction of Engineer-in-charge. | 2.52 | Cubic metre | 6,000 ₹15,120 Lowest | 9,150 ₹23,058 | 8,800 ₹22,176 | 7,800 ₹19,656 | 7,200 ₹18,144 |
| 6.00Providing form work with steel plates 3.15 milimetre thick welded with angle iron in frame 30x30x5 milimetre so as to give a fair finish including centring,shuttering,strutting and propping etc. with wooden battens ballies,height of propping and centring below supporting floor two ceiling not exceeding 4 metre and removal of the same for in-situ-reinforced concrete and plain concrete work in:- | ||||||||
| 7.00 | a) Vertical surfaces such as walls(any thickness)partitions walls and the like including attached pillasters,buttreses plinth string courses and the like within all leads and lifts as per the direction of Engineer-in-charge. | 19.95 | Square metre | 230 ₹4,588.5 | 325 ₹6,483.75 | 310 ₹6,184.5 | 120 ₹2,394 Lowest | 240 ₹4,788 |
| 8.00 | Providing and laying mild steel/tor steel reinforcement for reinforced cement concrete work including bending binding and placing in position complete upto floor two level within all leads and lifts as per the direction of Engineer-in-charge. | 100.62 | Killogramme | 81 ₹8,150.22 Lowest | 94 ₹9,458.28 | 92 ₹9,257.04 | 88 ₹8,854.56 | 88 ₹8,854.56 |
| 9.00 | Providing and laying precast cement concrete block 1:2:4 (One cement is to two sand is to four graded stone aggregate 20 milimetre nominal size) and curing complete within all leads and lifts as per the direction of Engineer-in-charge. | 2 | Number | 1,900 ₹3,800 | 2,550 ₹5,100 | 2,500 ₹5,000 | 1,250 ₹2,500 Lowest | 10,000 ₹20,000 |
| 10.00 | Steel work welded in built up sections,trusses and framed work including cutting,hoisting and fixing in position and applying a priming coat of red lead paint in gratings,framed guard bars,ladders,railing,brackets and similar type of work within all leads and lifts as per the direction of Engineer-in-charge. | 2,076.05 | Killogramme | 109 ₹2,26,289.45 | 145 ₹3,01,027.25 | 135 ₹2,80,266.75 | 115 ₹2,38,745.75 | 105 ₹2,17,985.25 Lowest |
Tender Value
₹31.0 L
EMD Value
₹62,200
Closing Date
27 Aug 2025, 5:00 pmClosed
EXECUTIVE ENGINEER
JAL SHAKTI DIVISION PALAMPUR
Construction of 1 No. Screen chamber plateform for sludge drying bed and roof truss shed for sludge thickening tank and gaseous chlorination unit
2025_HPIPH_112387_1
HPIPH 3547-3597 DATED 18.08.2025
Open Tender
Civil Works
Item Rate
90 days
PALAMPUR
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,500
EXECUTIVE ENGINEER
₹62,200
7 Nov 2025
18 Aug 2025
28 Aug 2025
18 Aug 2025
27 Aug 2025
18 Aug 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .