Loading…
Loading…
Tender Value
₹38.1 L
EMD Value
₹38,120
Closing Date
14 Jul 2026, 4:00 pm6d left
The Superintending Engineer (TR)
Work of 11KV Control Room Shifting from existing CR to New CR Building with Dismantling/Erection of equipment, control wiring, yard lighting, Control-Room Electrification at 66kv Kotda (F) S/S Under Tharad AM Division under Palanpur Circle
292844
PTC/ET/37/2026
Open
Electrical Goods/Equipment
Banaskantha
16 documents required · 16 mandatory
₹1,180
Gujarat Energy Transmission Corporation Ltd
₹38,120
1 Apr 2026
1 Apr 2026
14 Jul 2026
1 Apr 2026
14 Jul 2026
1 Apr 2026
2. Bidders have to submit Technical bid as well as Price bid in electric format only on above mentioned
website till the date and time shown above. However, of anywhere in tender documents submission
of other than this document physical submission mentioned to be overlooked. If any documents
are required for physical verification it will be intimated.
3. The EMD amount should be paid either by Demand Draft or local Banker’s Cheque. Payment
of EMD by RTGS/NEFT/on line shall be encouraged. In case of payment through RTGS/NEFT
bidder has to mail following details to [email protected], [email protected] &
[email protected]. The transection slip of payment made by RTGS/NEFT is to be
uploaded in Nprocure with tender documents.
Sr No Required Details
1 Name & Address of the bidder
2 Bidder GST No
3 Tender No with due date
4 Mode of Transfer
5 Ref. ID with Bank Details
7 Payment against (Tender Fee/ EMD)
Bidder has to provide all above details by email on the same date of payment so that
receipt can be generated.
4. GETCO beneficiary Bank Details as under
1 Name of Account Holder Gujarat Energy Transmission Corporation Ltd.
2 Account No. ‘01740200000624
3 Name of Bank Bank of Baroda
4 Branch Code PALANP
Transmission Circle, 66kv S/S Campus,
5 Address of Bank Abu Highway,
6 IFSC Code BARB0PALANP (Fifth Digit is Zero)
7 PAN No AABCG4029R
8 TAN No AHMG02636E
9 GST No 24AHMG02636E1DV
5. In case short submission of documents with bid and / or clarification if any required from the bidder, the
required details / documents may be asked from bidder in physical form.
6. It shall be sole responsibility of the bidder that the uploaded scanned documents (in PDF from) remain
legible and should not be password protected.
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
7. All the relevant scanned documents as per requirement of the tender are to be upload through online
only on n procure portal including Tender fee, EMD and attested Integrity Pact.
8. Tender will be evaluated on Data / Details / Documents of the online offer only.
9. It is mandatory for all the bidders to upload their tender documents by on line (E-tendering) in scheduled
10. The bidders are required to fill up all the online annexure / forms. This is intended for transparency and
speedy evaluation of the bids. Instead of simply confirming / attached in bid, the Bidder shall fill in the
particulars against appropriate place in respect of each line appearing in each online annexure. Wherever
required, bidder shall invariably have to upload supporting authentic documents in the online bid.
(In the absence of required details in the online annexure, the owner has every right to evaluate the bids
accordingly and bidder cannot raise any objection against any point during evaluation.)
11. Bidders are requested to remain in touch with the web-site for any amendment / corrigendum or
extension of due date etc
12. No tender shall be accepted / opened in case of receipt after due date and time of tender, irrespective
of delay due to postal services or any other reasons and the Corporation shall not assume any responsibility
for late receipt of tender.
13. The Earnest Money Deposit and tender fee will be accepted by NEFT/RTGS/online on any Nationalized
Bank only situated at “Palanpur” drawn in favor of “GUJARAT ENERGY TRANSMISSION
CORPORATION LTD.” EMD and Tender Fee NEFT/RTGS/online with different purchaser or agency shall
not be accepted. Tender without EMD and tender fee shall be rejected.
14. The GETCO reserves the right to award the work to one or more bidders, considering their technical
and financial capacity OR to reject any or all tenders or accept any tender without assigning any reason
Any technical questions, information and clarifications that may be required pertaining to this enquiry should
be referred to:
The S u p e r i n t e n di n g Engi nee r ( TR),
Gujarat E ne rg y Tra n s mi s si on C o r p o r at i o n
Limited, Circle Office, Aroma Circle,
Palanpur, - 385
GETCO reserves the right to reject any OR all tenders without assigning any reasons thereof.
Yours faithfully,
Superintending Engineer (TR) GETCO,
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED
TRANSMISSION CIRCLE OFFICE, PALANPUR.
Work of 11KV Control Room Shifting from existing CR to New CR Building with Dismantling/Erection of
equipment, control wiring, yard lighting, Control-Room Electrification at 66kv Kotda (F) S/S Under Tharad
AM Division under Palanpur Circle.
To create environment where Business confidence is built though best business practices and is fostered
in an atmosphere of trust and respect between providers of goods and services and their users for the
ultimate benefit of society the nation.
GETCO COMMITEMNT PARTY’S COMMITEMENT
To maintain the highest ethical standards in Not to bring pressure recommendations
business and professional outside GETCO to influence its decision.
Ensure maximum transparency to the Not to use intimidation, threat, inducement
satisfaction of stakeholders. or pressure of any kind on GETCO or any
of its employees under any circumstances.
To ensure to fulfill the terms of agreement / To be prompt and reasonable in fulfilling the
contract and to consider objectively the contract, agreement, legal obligations.
viewpoint of parties.
To ensure regular and timely release of To provide goods and / or services timely
9payment on due dates for work done. as per agreed quality and specifications at
minimum cost of GETCO.
To ensure that no improper demand is To abide by the general discipline to be
made by employees or by anyone on our maintained in our dealings.
To give maximum possible assistance to all To be true and honest in furnishing
the Vendors / Suppliers / Service provider information including payment to agents /
and other to enable them to complete the sub-agent.
contract in time.
To provide all information to suppliers / Not to divulge any information, business
contractors relating to contract / Job which details available during the course of
facilitate him to complete the contract / job business relationship to others without the
successfully in time written consent of GETCO.
To ensure minimum hurdles to Vendors / Not to enter into carter / syndicate /
suppliers / contractors in complete of understanding whether formal / non formal
agreement / contract / work order. so as to influence the price.
Seal & Signature Seal & Signature
(GETCO Authorized Signatory) (Party’s Authorized Person)
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Document Code Part
Tender Notice - I
Instructions to Tenderers ITB I
General Conditions of Contract GCC I
Erection Conditions of Contract ECC I
5. Special Conditions of
Contract with Declaration
6. General Information SCC I
Technical Specifications TSP II A
8. Bid Form BF III
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
INSTRUCTIONS TO BIDDERS
A. INTRODUCTION
1.0 General Particulars
1.1 The G u j a r a t Energy Transmission Corporation Ltd., Baroda hereinafter called
‘OWNER’ or‘ GETCO’ intends to receive bids for Work of 11KV Control Room Shifting
from existing CR to New CR Building with Dismantling/Erection of equipment, control wiring,
yard lighting, Control-Room Electrification at 66kv Kotda (F) S/S Under Tharad AM Division
under Palanpur Circle as detailed in the accompanying specifications in accordance with
Terms and Conditions herein. The bids shall be prepared and furnished as per these Instructions.
2.0 Qualification Requirement
1 Registration: Bidder shall be strictly a GETCO registered contractor of E1 class
2 Experience: 1. Bidder shall have executed minimum 01no. of 66/11KV substation with
state or central Transmission Utility or major industries or 1no. control room erection work
including activities mentioned in Schedule-B. 2. The bidder shall have valid Electrical
Contract License and approved vendor of GETCO/ STU/ CTU, registered under sales-Tax
Act, service tax act and should have CPF/ PF registration certificate Attested Xerox copy of
work orders executed from GETCO and satisfactory completion certificate from respective
department should be submitted.
3. Solvency: Latest bank solvency certificate from any Nationalized/Scheduled Bank of a
sum of minimum 20 % of the estimated cost shown in the tender.
4 Provident Fund Code: Separate provident fund code number towards firm registered with
Regional P. F. Commissioner.
5 Profit & Loss Account Statement: The Bidder should submit certified Xerox audited copy
of the Balance sheet with profit and loss account of last three Years.
6 Nature of Firm: Attested copy of Partnership Deed, Power of Attorney, if any, for
signing the bid documents in case of partnership firm & self-affidavit for proprietorship
firm. All such documents shall have to be NOTARISED.
7. GST Registration: The Bidder should have to take registration under the “GOODS AND
SERVICE TAX(GST)”. Bidder has to register online in given link before bidding. Link for
the same is www.getcogujarat.com/. The certified Xerox copy of such registration shall
have to be submitted along with the bid by the bidder.
8. I.T. PAN CARD: The bidder should submit the attested zerox copy of PAN Card of their
10. Electrical contractor’s license: The bidders should submit the attested copy of GOG
Electrical Contractor licenses of firm with latest validation.
11. Welfare cess registration: As per welfare cess act. Bidder shall be registered under welfare
cess. & have to be submitting along with the bid. Also, bidder has to take registration of
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
said site and submit the same to this office.
11. List of Tools & Tackles.
The bidders must be attach submitted all above documents scanned copy on n-procure
and certified/self verified copy of all documents submit Technical bid.
2.2 The above cited requirements are only indicative. The owner reserves the right to requisition
any other relevant information and also reserves the right to reject the Bid proposal of any
Bidder, if in the Owner’s opinion the Qualification data is incomplete and Bidder is not
qualified to perform the Contract satisfactorily.
3.0 Bidding Costs
All costs/expenses in the preparation and submission of the Bid (including any post Bid
discussions/presentations) shall be fully borne by the Bidder. Owner will not be responsible/
liable for these costs irrespective of the course and conclusion of this Bidding.
B. BID DOCUMENTS
4.0 Details of Documents
4.1 The following Bid documents apart from Invitation to Bid detail the material and equipment
specifications/characteristics, the bidding procedures and the terms & conditions of contract:
a. Instructions to Bidders (ITB-Part I)
b. General Conditions of Contract (GCC-Part
c. Erection Conditions of Contract (ECC-Part
d. Special Conditions of Contract (SCC-Part I)
e. Technical Specifications (TSP-Part IIA)
f. Technical Data Sheets (TDS-Part IIB)
5.0 Knowing the Bid Documents
5.1 Every intending Bidder is to examine and understand all instructions, forms, terms,
conditions and specifications in the Bid Documents and fully know himself all the conditions
and contents therein, which may in any manner, affect the scope & content of work and the
costs thereof. Submission of a Bid not substantially responsive to the Bid Document in all
respects and/or failure to furnish all information required by the Bid Document may entail
rejection of the Bid at the Bidder’s risk.
6.0 Clarifications on Bid Documents
6.1 In case an intending Bidder finds any discrepancy or omission in the documents and specifications
or is in doubt as to the true meaning of any part, he shall make a request, in writing not later
than the date of pre Bid d i s c u s s i o n t o the owner in triplicate. The o w n e r w i l l i s s u e
e x p l a n a t i o n s , i n t e r p r e t a t i o n s and clarifications as deemed fit in writing as a response
to this request. On receipt of such interpretations/clarifications, the Bidder may submit his Bid
within the date and time stipulated in the Bid invitation, all such explanations, interpretations
and clarifications from the Owner shall be deemed as part of Bid Documents and shall invariably
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
accompany the Bidder’s proposal.
6.2 Any verbal/telephonic clarifications and information given by the Owner or his employee (s) or
his representative(s) will not in any way be binding on the Owner.
7.0 Amendment of bidding document:
7.1 At any time prior to the deadline for submission of Bids the Owner may, for any reason,
whether at his own initiative or in response to a clarification requested by the intending Bidder,
modify the Bidding Document with amendment(s).
7.2 The amendment will be notified in writing or Fax /web site to all intending Bidders who have
received the Bidding Document at the address contained in the letter of request for issue of
bidding document from the Bidders. Owner will bear no responsibility or liability arising out of
non-receipt of the same in time or otherwise.
7.3 In order to afford prospective bidders reasonable time in which to take the amendment into
account in preparing their bids, the Owner may, at his discretion, extend the deadline for the
submission of bids.
7.4 Such amendments, clarifications etc. shall be binding on bidders and will be given due
consideration by the Bidders while they submit their bids and shall invariably enclose such
documents as a part of the bid.
C. PREPARATION OF BIDS
8.0 Language of Bid:
8.1 The Bid prepared by the Bidder and all correspondence and documents relating to the Bid,
exchanged by the Bidder and the Owner, shall be written in the English language, provided
that any printed literature furnished by the Bidder may be written in another language so
long as accompanied by an English translation of its pertinent passages. Failure to comply
with this may disqualify a bid. For purposes of interpretation of the bid, the English translation
Bidders have to make the Bid in the formats furnished with this Document. Verbatim without
adding any printed/type written text of their own.
9.0 Local Conditions:
9.1 It will be imperative on each Bidder to fully inform himself of all local conditions and factors,
which may have any effect on the execution of the Contract covered under these documents
and specifications. The Owner shall not entertain any request for clarifications from the bidders,
regarding such local conditions.
9.2 It must be understood and agreed that such factors have properly been investigated and
considered while submitting t h e pr oposals. No claim for financial adjustment to the
Contract awarded under these specifications and documents will be entertained by the
owner. Neither any change in the time schedule of the Contract nor any financial adjustments
arising thereof shall be permitted by the Owner, which are based on the lack of such clear
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
information or its effect on the cost of the works to the Bidder.
10.0 Documents comprising the Bid:
Requirements etc. furnished in the Bidding Documents, indicating, for the services to be
rendered, a brief description of services, quantity and price.
10.2 The Bidder shall also submit documentary evidence to establish that the Bidder meets the
Qualification Requirements as detailed in Clause 2.0 above and Special Conditions of Contract
(including Clause 11 of I TB).
10.3 All Tender Documents/ formats are to be returned completed and filled in all respects and
signed by the Company Authorized Signatory wherever specified.
10.3 The Bid Guarantee shall be furnished in a separate cover in accordance with clause specific
11.0 Scope of the proposal
11.1 The Scope of the proposal shall be on the basis of a single Bidder’s responsibility, completely
covering all the equipment erection and other installation services specified under the
accompanying Technical Specifications. It will include among others as specified therein the
e) Receipt of equipments and material from Soja R&M store/Kansari Const. store or any
GETCO construction store and transporting, storage, preservation and conservation of
equipment at the Site.
f) Pre-assembly, if any, erection, testing and commissioning of all the equipments.
g) Reliability tests and performance and guarantee tests on completion of commissioning.
11.2 As specified in the Special Conditions of Contract, no deviation whatsoever to certain conditions
of the bidding documents permitted by the Owner and therefore, the Bidders are advised that
while making Bid Proposals and quoting prices these conditions may appropriately be taken
into consideration. Bidders are required to furnish a certificate in this regard as per the format
provided in Special Conditions of Contract in a separate sealed envelope containing Bid
security, which shall accompany the Technical Bid. Any Bid not accompanied by such certificate
shall be rejected by the Owner and shall not be opened.
11.3 Bids not covering the above cited entire scope of works may be treated as incomplete and
hence rejected.
11.4 The Bidder shall complete all the schedules & annexure in the Bid Proposal Sheets,
Technical Data Sheets and specified elsewhere. The Qualifying Data should be filled in the
required schedule of Bid Proposal Sheets.
12.0 Bid Price:
12.1 The Bidder shall indicate percentage above/below of total bid price indicated in the appropriate
commissioning, and other services it proposes to furnish under the contract. Prices quoted
should be in % Above/ Below on Estimated Cost. However, detail bifurcation of Taxes
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
applicable should be mentioned separately with Price bid
12.2 The Bidder shall specifically note that the Tenders are invited on percentage rate
12.3 If the Supplier/Contractor has opted for the Composition scheme of GST, the same must be clearly
specified with valid Declaration & Certificate from Department. In the event of
withdrawal/cessation of the Supplier from Composition scheme during the tenure of the contract,
the rate (i.e. price) mentioned in the price bid shall be final and any additional GST will have to
be borne by the tenderer himself. In no case additional amount towards GST or otherwise will be
paid / reimbursed to supplier/contractor. Further Statutory Variation clause will not be applicable
in case of Supplier / Contractor has opted for Composition Scheme under GST.
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess as
applicable for each item of Goods/Service. If not specifically mentioned then COMPANY will have
the option to take the prices as exclusive of taxes and duties at maximum higher slab rates for
the evaluation of the tenders.
The offered prices to be indicated in online mode of tender in the format given (i.e. Schedule-B).
The price bid submitted in physical mode shall not be considered.
Every bidder shall inform their GSTIN No. of the registered place(s) wherefrom the bidder intends
to supply the goods / services, meaning thereby the bidder has to supply the goods / services from
the relevant declared / registered place of supply only.
13.0 Price Basis:
13.1 The Price shall be quoted on firm basis.
13.2 The Price quoted by the bidder shall remain fixed during the bidder's performance of the
contract and shall not be subject to variation on any account save for change in quantity.
A bid submitted with an adjustable price quotation shall be treated as non-responsive and
14.0 Taxes and Duties:
14.1 As regards the income Tax, will be levied as per prevailing rate on payment to contractors. Any
other tax except specifically mentioned in tender will not be born by GETCO. The bidder shall be
liable and responsible for payment of such taxes as attracted under the provisions of the law.
14.2 Notwithstanding the tax liabilities as per the sub-clause14.1 above the owner shall have the
right to make deduction at source from the amounts payable to the contractor in respect of
Income Tax (on the cost of items of supply included in the works contract) as may be mandatory
in terms of the law. The owner shall not bear any liability in this regard but shall issue necessary
certificate in respect of such deduction made.
14.3 In case any tax or duty is newly introduced by the Government applicable for this contract
with effect from the next day of the date submission of the bid and if the contractor is required
to pay additional tax or duty, then the owner shall reimburse the contractor the additional tax
or duty so paid by the contractor against submission by the contractor of documentary
evidence to the satisfaction of the owner. This provision will not be applicable to transaction
between the contractor and his sub-contractors. Besides the said statutory variation, no other
statutory variation shall be payable by the owner.
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
14.4 The owner’s liability for all taxes and duties under the contract shall be limited to those
indicated by the Bidder in the Bid Proposal Sheets, subject to the statutory variations and
variations as per Clause No.
14.3. If the cost to the Contractor during the performance of the ‘Contract’ shall be increased or
reduced by reasons of the making, passing or promulgation of any law after the date of
submission of bid or by any order, regulation or bye-law having the force of law the amount
of such increase or reduction shall be added to or deducted from the “Contract Price” as
the case may be for direct transactions between contactor & owner, and not for bought
out items. It is the Bidders responsibility to furnish details of taxes, duties, levies etc.
applicable as on the date of submission of the bid.
14.5 No claim for any increase towards the statutory variation regarding enhancement of existing
tax or duty or introduction of a new tax or duty applicable shall be entertained by the Owner
during the extended period of contract, if any, provided the extension of the contract is required
by causes attributable to the contractor.
14.6 The provision of statutory variation regarding enhancement of existing tax or duty or
introduction of a new tax or duty will be applicable only to the direct transaction between the
contractor and the owner.
14.7 Before quoting, the bidder may ascertain from the concerned tax authorities of Government of
Gujarat the applicability of Work Contract Tax. Entry Tax, GST, etc. in respect of this work and
include the same in the quoted price. No separate claim in this regard will be entertained by
the Owner, as it is the responsibility of the Bidder to pay all these taxes.
14.8 In addition, the conditions detailed under Special Conditions of Contract shall apply.
15.0 Time Schedule:
15.1 The basic consideration and the essence of the contract shall be strict adherence to the time
schedule for performing the specified works.
15.2 The Owner’s requirements of completion schedule for the Works are mentioned in the
accompanying Special Conditions of Contract.
15.3 The completion schedule as stated in the special conditions of contract shall be one of the
major factors in consideration of the bids.
15.4 Validity of tender: 180 Days from the date of opening of Technical Bid
16.0 Insurance:
The Bidder’s insurance liabilities pertaining to the scope of Works are detailed out in
Clauses titled Insurance , in General Terms and Conditions of Contract and in Erection
Conditions of this Part-I. Bidder’s attention is specifically invited to these clauses. Bid price
shall include all the costs in fulfilling all the insurance liabilities under the Contract.
17.0 Erection Tools and Tackles:
The Bidder under a separate schedule, in his proposal shall include a list of all-special
equipment tools & tackles etc. which he proposes to bring to site for the purpose of
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
erection, handling, testing and commissioning including performance and guarantee tests
of the equipment. If any such equipment is listed anywhere else in the proposal and not
specially mentioned in the above schedule, it shall be deemed to have been included in the
Bidder’s proposed scope of supply.
18.0 Bid Security/EMD:
18.1 The bidder shall furnish, as a part of its bid EMD, bid security for an amount of one percent
of estimated cost to be paid as under:
a) All the Bidders will be required to pay Tender Fees with applicable GST and EMD as
mentioned in the Tender document either in Cash (up to Rs. 10,000/- only) at the office
address specified in the tender document or by RTGS/ NET/online
18.2 The bid security is required to protect the owner against the risk of Bidder’s conduct, which
would warrant the guarantee forfeiture, pursuant to relevant paras elsewhere The bid
guarantee shall be made payable to the Owner without any condition whatsoever.
18.3 The Owner will reject any bid not secured in accordance with Para 20.1 above, as non-
responsive,. No exemptions are made in the furnishing of the security.
18.4 Unsuccessful Bidder’s bid security/EMD will be returned/refunded on finalization of tender.
18.5 The successful bidders, Bid Security will be discharged upon, furnishing the contract
performance guarantee
18.6 The bid guarantee may be forfeited.
a) If a Bidder withdraws its bid during the period of bid validity specified by the bidder on
b) If a bidder refuses to accept the contract or fails to commence the works (including
supplies within thirty days of letter of award of contract)
19.0 Format of Bid:
19.1 The Bidder shall prepare one copy of the technical bid with all the documents. No
Hard/Physical copy of Price/Commercial bid required in physical submission. Price bid must
be consider from N-Code/Online only
19.2 The original and all copies of the bid shall be typed or written in indelible ink and shall be
signed by the Bidder or a person or persons duly authorized by the Bidder to sign the
Contract. The letter of authorization shall be indicated by written power-of-attorney
accompanying the bid. All pages of the bid, except for un-amended printed literature, shall be
initiated by the person or persons signing the bid.
19.4 The bid shall contain no interlineations, erasures or overwriting except as necessary to
correct errors made by the Bidder, in which case such corrections shall be initiated by the
person or persons signing the bid.
19.5 Bids shall be submitted as under:
No Hard/Physical copy of Technical/Price/Commercial bid required in physical submission.
Technical & Price bid must be consider from N-Code/Online only
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
20.0 Signature of Bids:
21.1 The bid must contain the name, residence and place of business of the person or persons
making the bid and must be signed and sealed by the Bidder with his usual signature. The
names of all persons signing should also be typed or printed below the signature.
20.2 Bid by a partnership must be furnished with full names of all partners and be signed with the
partnership name; followed by the signature(s) and designation(s) or the authorized partner(s)
or other authorized representative(s).
20.3 Bids by Corporation/Company m ust be signed with the legal name of the Corporation/Company
by the President/Managing Director or by the Secretary or other person or persons authorized
to bid on behalf of such Corporation/Company in the matter.
20.4 A bid by a person who affixes to his signature the word ‘President’, ‘Managing Director’,
‘Secretary’, ‘Agent’ or other designation without disclosing his Principal will be rejected.
20.5 If it is found that two or more persons who are connected with one another either financially
or as a principal and agent have bid under different names without disclosing their connection
then such bids will be liable for rejection. Satisfactory evidence of authority of the person
signing on behalf of the Bidder shall be furnished with the bid.
20.6 The Bidder’s name stated on the proposal shall be the exact legal name of the firm.
20.7 Bids not conforming to the above requirements of signing may be disqualified and EMD forfeited.
20.0 Deadline for submission of bids:
20.1 The Bidders have been send by Online in Ncode only. Bids submitted b y RPAD-
post/telex/telegram w i l l not be accepted. No request from any Bidder to the Owner to collect
the proposals from airlines, cargo agent etc. shall be entertained by the Owner.
22.2 Bids must be received by the Owner at the address specified under Para 23.3, not later
than the time & date mentioned in the Invitation to Bid.
22.3 The Owner may, at its discretion, extend this deadline for the submission of bids by
amending the Bidding Document in which case all rights and obligations on the Owner and
Bidders previously subject to the deadline will thereafter be subject to the deadline as extended.
23.1 Any bid received by the Owner after the time and date fixed or extended for submission of bids
prescribed by the Owner, will be rejected and not considered for evaluation.
23.0 Modification and withdrawal of bids:
23.1 The Bidder may modify or withdraw its bid after the bid’s submission provided that written
notice of the modification or withdrawal is received by the Owner prior to the deadline
prescribed for submission of bids.
23.2 The Bidder’s modification or withdrawal notice shall be prepared, sealed, marked and
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
dispatched in accordance with the provisions of clause 23.0. The envelope should clearly
indicate whether the modification is for the Technical bid or the Price bid. No bid modifications
notice by Telex/Grams/Fax shall be entertained by the Owner.
23.3 No bid shall be modified in any manner, whatsoever subsequent to the deadline for
submission of bids.
23.4 No bid may be withdrawn in the interval between the deadline for submission of bids and
the expiration of the period of bid validity specified by the Bidder on the Bid Form.
Withdrawal/modification of a bid during this interval may result in the Bidder’s forfeiture of its
E. BID OPENING AND EVALUATION
27.0 Opening of bids by owner:
27.1 The Owner will open the technical bids Online only in the presence of Bidder’s
representatives who choose to attend on the date and time mentioned for opening of bids
in the Invitation to Bid or in case any extension has been given thereto, on the extended
bid opening date and time notified to all the Bidders who have purchased the bidding
document. The Bidder’s representatives who are present shall sign a register evidencing their
27.2 The Bidder’s names, Technical modifications, Bid withdrawal and such other details as the
Owner, at his discretion may consider appropriate, will be announced in the Technical Bid
27.3 The price bids of all the “Techno-Commercial” Responsive Bidders shall be opened in the
presence of representatives (up to two per firm) of such bidders who choose to be present.
The date & time of opening the Price Bid shall be intimated to all such qualified bidders by
Fax/Telex/, at least one week in advance besides inviting final price bid if found appropriate
after evaluation of Technical bids.
27.4 The Bidder’s name, lump sum Bid Price, all discounts if any, modifications in the Price Bid
and any such other details as the Owner, at his discretion, may consider appropriate, will be
announced/ furnished in the Price Bid Opening.
27.5 No electronic recording/transmitting devices will be permitted during Bid opening.
28.0 Purpose of evaluation of bids:
28.1 The Bids received/accepted/opened will be evaluated by the Owner to ascertain the
technical responsiveness of the bid for the complete scope of the proposal, as covered under
these specifications and documents. All technically responsive bids shall then be examined to
determine the LOWEST EVALUATED COMMERCIALLY AND TECHNICALLY RESPONSIVE
29.0 Policy for bids under consideration:
29.1 Bids shall be deemed to be under consideration immediately after opening of Technical Bid
and until such time official intimation of award/rejection is made by the Owner to the Bidders.
While the Bids are under consideration, Bidders and/or their representatives and other
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
interested parties are advised to refrain from contacting by any means, the owner and/or his
employee’s representatives on the matters related to Bids under consideration.
30.0 Clarification of bids:
To assist in the examination evaluation and comparison of Bids the owner may on his own ask
the Bidder for a clarification of its bid. The request for clarification and the response shall be
in writing and no change in the price or substance of the bid shall be sought, offered or
31.0 Preliminary Examination:
31.1 The Owner will examine the bids to determine whether they are complete, whether any
computational errors have been made, whether required sureties have been furnished, whether
the documents have been properly signed, and whether the bids are generally in order.
31.2 Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between the unit price and the total price that is obtained by multiplying
the unit price and quantity, the unit price shall prevail and the total price shall be
corrected. If there is a discrepancy between the total bid amount and the sum of total costs,
the latter shall prevail and the total bid amount will be corrected accordingly. If there is a
discrepancy between words and figures, the amount advantageous to the Owner will prevail.
If the Bidder does not accept the correction of the errors as above, his Bid will be rejected
and the amount of Bid Security will be forfeited. The Bidder should ensure that the prices
inconsistency in the prices furnished in the specified prices schedules to be identified in Bid
Form for this purpose, the Owner shall be entitled to consider the highest price for the purpose
of evaluation and for the purpose of award of Contract use the lowest of the prices in these
31.3 Prior to the detailed evaluation, the Owner will determine the substantial responsiveness of
each bid to the Bidding Document. For purpose of these Clauses, a substantially
responsive bid is one, which conforms to all the terms and conditions of the Bidding
Document without material deviations. A material deviation is one which affects in any way
the prices, quality, quantity or delivery period of the equipment, completion of works or which
limits in any way the responsibilities or liabilities of the Bidder of any right of the Owner as
required in these specifications and documents. The Owner’s determination of a bid’s
responsiveness shall be based on the contents of the bid itself without recourse to extrinsic
31.4 A bid determined as not substantially responsive will be rejected by the Owner and may not
subsequently be made responsive by the Bidder by correction of non-conformity.
31.5 The Owner may waive any minor informality or non-conformity or irregularity in a bid which
does not constitute a material deviation, provided such waiver does not prejudice or affect the
relative ranking of any Bidder.
32.0 Evaluation of Price Bids: No Copy of TECHINICAL BID AS WELL AS PRICE-
BID requires in Physical copy of bid. It is compulsory to submit Technical as well
as price-bid through on-line (n-code) only. Same will observed in physical bid
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
during opening, whole tender may be not considered.
32.1 Definitions and Meanings:
For the purpose of the evaluation and comparison of bids, the following meanings and
definition will apply:-
a) ‘Bid Price’ shall mean the price quoted by each Bidder in his proposal for the complete
scope of works.
d) ‘Evaluated Bid Price’ shall be summation of ‘Bid Price’, ‘Differential Price’ and ‘Cost
Compensation for Deviations.’
F. AWARD OF CONTRACT
33.0 Award Criteria
33.1 The owner will award the contract to the successful Bidder, whose bid has been
determined to be substantially responsive and has been determined as the lowest evaluated
bid, providing further that the Bidder is determined to be qualified to perform the contract
satisfactorily. The Owner shall be the sole judge in this regard.
33.2 Further, the Owner reserves the right to award separate contracts to two or more parties in
line with the terms and conditions specified in the accompanying Technical Specifications.
34.0 Owner’s right to accept any bid and to reject any or all bids:
34.1 The Owner reserves the right to accept or reject any bid, and to annual the bidding process
and reject all bids at time prior to award of contract, any without thereby incurring any liability
to the affected Bidder or Bidders or any obligation to inform the affected Bidder or Bidders
of the grounds for the Owner’s action.
35.0 Notification of award:
35.1 Prior to the expiration of the period of bid validity and extended validity period, if any, the
Owner will notify the successful Bidder in writing by registered letter or cable or telex or FAX,
to be confirmed in writing by registered letter, that its bid has been accepted.
35.2 The notification of award will constitute the formation of the Contract.
35.3 Upon the successful Bidder’s furnishing of performance guarantee pursuant to relevant
clause 38 .0, the Owner will promptly notify each unsuccessful Bidder and will discharge
its bid security, pursuant to Clause 20.0.
36.0 Signing of contract:
36.1 At the same time as the Owner notifies the successful Bidder that his bid has been accepted,
the Owner will send the Bidder the detailed of Award, incorporating all agreements between
36.2 Within 15 days of receipt of the detailed of Award, the successful bidder shall sign the same
with date and return it to the Owner.
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
36.3 The Bidder will prepare the Contract Agreement as per the Performa prescribed and the
same will be signed before commencement of work.
37.0 Welfare cess
1) As per the Welfare cess Act, the welfare cess @ 1% is applicable on supply and erection
items for supply, erection, testing & commissioning of substation, transmission lines, EPC/Turnkey
projects and civil works. Before release of payment of every RA bill, the contractor has to submit
documentary evidence of payment of welfare cess of that RA bill at the time of the final bill for final
bill. Also, the bidder should submit the certified copy of welfare registration before 1st RA bill. The
payment should be released after submission of said registration.
2) Contractor shall get registered under welfare cess Act before commencement of work. Office of
the factory inspector is authorized at present as a registering authority.
3) GETCO shall pay the welfare cess by way of reimbursing to contractors on production of
documentary evidence of payment.
4) The contacts for which supply or part supply of material are in the scope of GETCO, then
contractors shall deposit welfare cess on estimated cost of supplied items to GETCO
contractor on progressive basis of utilization. As this part of welfare cess is on GETCO account,
the same shall be reimbursed to the contractor on receipt of request letter along with documentary
evidence of payment. For calculation of welfare cess on supply part, valuation as per MR shall
be taken and informed to the contractor for payment. This will be over and above the A/T value.
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
GENERAL TERMS & CONDITIONS OF CONTRACT
A. INTRODUCTION
1.0 DEFINITION OF TERMS
1.1 The ‘Contract’ means the agreement entered into between the Owner and the Contractor
as per the Contract Agreement signed by the parties, including all attachments and
appendices thereto and all documents incorporated by reference therein.
1.2 ‘Owner’ shall mean the Superintending Engineer (TR), GETCO, Palanpur or any of its
subsidiaries and shall include its legal representatives, successors and assigns.
1.3 ‘Contractor’ shall mean the Bidder whose bid is accepted by the Owner for the award of the
Works and shall include such successful Bidder’s legal representatives, successors and
permitted assigns.
1.4 ‘Engineer’ shall mean the officer appointed in writing by the Owner to act as Engineer from
time to time for the purpose of the Contract.
1.5 The terms ‘Equipment’, ‘Stores’ and ‘Materials’ shall mean and include equipment, stores
and materials to be provided by the Contractor under the Contract.
1.6 ‘Works’ shall mean and include the furnishing of equipment, Labor and services, as per the
Specifications and complete erection, testing and putting into satisfactory operation
including all transportation, handling, unloading and storage at the Site as defined in the
1.7 ‘Specifications’ shall mean the Specifications and Bidding Document forming a part of the
Contract and such other schedules and drawings as may be mutually agreed upon.
1.8 Site’ shall mean and include the land and other places on, into or through which the works
and the related facilities are to be erected or installed and any adjacent land, paths, street or
reservoir which may be allocated or used by the Owner or Contractor in the performance of
1.9 The term ‘Contract Price’ shall mean the lump-sum price quoted by the Contractor in
his bid with additions and/or deletions as may be agreed and incorporated in the Letter of Award
and the contract agreement for the entire scope of the works.
1.10 The term ‘Erection Portion’ of the Contract price shall mean the value of field activities of
the works including erection, testing and putting into satisfactory operation including successful
completion of performance and guarantee tests to be performed at Site by the Contractor
including cost of insurances.
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
1.11 Site Engineer ‘Inspector’ shall mean the owner’s Engineers or any person nominated by
the time to inspect the equipment; stores or Works under the Contract and/or the duly
authorized representative of the Owner.
1.12 ‘Notice of Award of Contract’/’Letter of Award’/’Telex of Award’ shall mean the official notice
issued by the Owner notifying the Contractor that his bid has been accepted.
1.13 ‘Order’ shall mean the official letter issued by the Owner informing the acceptance of the bid.
1.14 ‘Date of Contract’ shall mean the date on which letter of commencement of work issued by
the respective sub division deputy engineer.
1.15 ‘Month’ shall mean the calendar month. ‘Day’ or ‘Days’ unless herein otherwise expressly
defined shall mean calendar day or days of 24 hours each.
A ‘Week’ shall mean continuous period of seven (7) days.
1.16 Writing’ shall include any manuscript, type written or printed statement, under or over
signature and/or seal as the case may be.
1.17 When the words ‘Approved’, ‘Subject to Approval’, ‘Satisfactory’, ‘Equal to’, ‘Proper’,
‘Requested’, ‘As Directed’, ‘Where Directed’, ‘When Directed’, ‘Determined by’, ‘Accepted’,
‘Permitted’, or words and phrases of like importance are used the approval, judgment, direction
etc. is understood to be a function of the Owner/Engineer.
1.18 Test on completion shall mean such tests as prescribed in the Contract to be performed by
the Contractor before the work is taken over by the Owner.
1.19 ‘Performance and Guarantee Tests’, shall mean all operational checks and tests required to
determine and demonstrate capacity, efficiency, and operating characteristics as specified in
the Contract Documents.
1.20 The term ‘Final Acceptance’/‘Taking Over’ shall mean the Owner’s written acceptance of
the Works performed under the Contract, after successful commissioning/completion of
Performance and Guarantee Tests, as specified in the accompanying Technical Specifications
or otherwise agreed in the Contract.
1.21 ‘Latent Defects’ shall mean such defects caused by faulty designs, material or work-man-
ship which cannot be detected during inspection, testing etc, based on the technology available
for carrying out such tests.
1.22 ‘Codes’ shall mean the following including the latest amendments and/or replacements, if any:
a) Indian Electricity Act, 1905 and Rules and Regulations made there under.
b) Electricity Act 2003 and Rules & Regulations made there under.
c) Indian Factory Act, 1948 and Rules and Regulations made there under.
d) Indian Explosives Act, 1884 and Rules and Regulations made there under.
e) Indian Petroleum Act, 1934 and Rules and Regulations made there under.
f) A.S.M.E. Test Codes.
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
g) A.I.E.E. Test Codes.
h) American Society of Materials Testing Codes.
i) Standards of the Indian Standards Institution.
j) Other Internationally approved standards and/or rules and regulations touching the subject
matter of the Contract.
1.23 Words imparting the singular only shall also include the plural and vice –versa where the
context so requires.
1.24 Words imparting ‘Person’ shall include firms, companies, corporations and associations
or bodies of individuals, whether incorporated or not.
2.0 APPLICATION
These General Conditions shall apply to the extent that they are not super ceded by provisions
in other parts of the Contract.
3.0 CONTRACT DOCUMENTS
3.1 The term Contract Documents shall mean and include the following which shall be deemed
to form an integral part of the Contract:
a) Invitation to Bid including letter forwarding the Bidding Documents, Instructions to
Bidders, General Terms and Conditions of Contract, the Special Conditions of Contract.
and all other documents included under Part-I, Part-II and Part-III .
b) Specifications of the erection of the equipments and other technical services to be provided
under the Contract as brought out in the accompanying Technical Specifications.
c) Contractor’s Bid Proposal and the documents attached there to including the letters of
clarifications thereto between the Contractor and the Owner prior to the Award of Contract
except to the extent of repugnancy.
d) Letter of Award and any agreed variations of the conditions of the documents and special
terms and conditions of Contract, if any.
3.2 In the event of any conflict between the above mentioned documents the matter shall be
referred to the Engineer whose decision shall be considered as final and binding upon the
4.0 USE OF CONTRACT DOCUMENTS AND INFORMATION
4.1 The Contractor shall not, without the Owner’s prior written consent, disclose the Contract,
or any provision thereof, or any specification, plan, drawing, pattern, sample or information
furnished by or on behalf of the Owner in connection therewith, to any person other than
a person employed by the Contractor in the performance of the Contract. Disclosure to any
such employed person shall be made in confidence and shall extend only so far as may be
necessary for the purpose of such performance.
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
4.2 The Contractor shall not, without the Owner’s prior written consent, make use of any
document or information enumerated in various Contract documents except for the
purpose of performing the Contract.
4.3 The Contractor shall not communicate or us in advertising, publicity, sales releases or
in any other medium, photographs or other reproduction of the Works under this Contract, or
descriptions of the site, dimensions, quantity, quality or other information, concerning the works
unless prior written permission has been obtained from the Owner.
4.4 Any document, other than the Contract itself, enumerated in various Contract documents shall
remain the property of the Owner and shall be returned (in all copies) to the Owner
on completion of the Contractor’s performance under the Contract if so required by the Owner.
5.0 CONSTRUCTION OF THE CONTRACT
5.1 Notwithstanding anything stated elsewhere in the bid documents, the Contract to be entered
into will be treated as a single Contract. Award shall be placed on the successful Bidder as
For providing services like inland transportation, insurance for delivery at site, unloading,
storage, handling at site, installation, testing and commissioning including performance testing
in respect of all the equipment material equipment/materials given by the owner after observing
standard store procedures for transport from owner’s stores, insurance, unloading storage
handling at site installation testing & commissioning.
5.2 In case erection Contract, or where the Owner hands over his equipment to the Contractor
for executing, then the Contractor shall at the time of taking delivery of the equipment/dispatch
documents be required to execute an Indemnity Bond in favor of the Owner in the form
acceptable to the S u p e r i n t e n d i n g engineer (TR), Palanpur for keeping the equipment in
safe custody and to utilize the same exclusively for the purpose of the said Contract. Samples
of Performa for the Indemnity Bond will be furnished during award of Contract.
5.3 The Contract shall in all respects be construed and governed according to Indian Laws.
5.4 It is clearly understood that the total consideration for the Contract(s) has been broken up into
various components only for the convenience of payment under the Contract(s) and for
the measurement of deviations or modifications under the Contract(s).
6.0 JURISDICTION OF CONTRACT
6.1 The laws applicable to the Contract shall be the laws in force in India. The Courts of
Palanpur shall have exclusive jurisdiction in all matters arising under this Contract.
7.0 EXECUTION OF CONTRACT:
7.1 The Owner, after the issue of the Letter of Award to the Contractor, will send one copy
of the final agreement to the Contractor for his scrutiny and approval.
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
7.2 The Agreement, unless otherwise agreed to, shall be signed within 30 days of the acceptance
of the Letter of Award, at the office the Owner at Palanpur on a date and time to be mutually
agreed. The Contractor shall provide for signing of the Contract, Performance Guarantee,
appropriate power of attorney and other requisite materials. In case the Contract is to be signed
beyond the stipulated time, the Bid Guarantee submitted with the Proposal will have to be
extended accordingly.
7.3 The Agreement will be signed in copies to be specified and the Contractor shall be provided
with one signed original and the rest will be retained by the Owner.
7.4 Subsequent to signing of the Contract, the Contractor at his own cost shall provide the
Owner with copies of agreement within fifteen (15) days after the signing of the Contractor.
8.0 ENFORCEMENT OF TERMS
8.1 The failure of either party to enforce at any time any of the provisions of this Contract or any
rights in respect thereto or to exercise any option therein provided, shall in no way be construed
to be a waiver of such provisions, rights or options or in any way to affect the validity of the
Contract. The exercise by either party of any of its rights herein shall not preclude or prejudice
either party from exercising the same or any other right it may have under the Contract.
9.0 COMPLETION OF CONTRACT
9.1 Unless otherwise terminated under the provisions of any other relevant clause, this Contract
shall be deemed to have been completed on the expiry of the guarantee period as provided
for under the clause entitled
‘Guarantee’ in this section of the Volume-I.
B. GUARANTEES & LIABILITIES
10.0 TIME – THE ESSENCE OF CONTRACT
10.1 The time and the date of completion of the Contract as stipulated in the Contract by the Owner
without or with modifications, if any, and so incorporated in the Letter of Award, shall be deemed
to be the essence of the Contract. The Contractor shall so organize his resources and perform
his work as to complete it not later than the date agreed to.
10.2 The Contractor shall submit a detailed bar chart within the time frame agreed consisting
of adequate number of activities covering various key phases of the work such as
design, procurement, manufacturing, shipment and field erection activities within seven (7)
days of the date of LOI.
10.3 The above bar chart shall be compatible with the Owner’s computer environment and
furnished to the Owner on such media as may be desired by the Owner.
11.0 EFFECTIVENESS OF CONTRACT
The Contract shall be considered as having come into force from the date of the commencement
given by the respective construction sub division unless otherwise provided in LOI.
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
12.0 PENALTY FOR DELAY
The tenderer should note that the completion time allowed for carrying out the work should be
strictly observed. Any delay that may take place in work excavation beyond Contractual cut off
date stated as per stipulated delivery period shall be subject to the penalty at the rate of ½ % per
week or part there of on delayed portion of the work subject to ceiling of 10% of total contract value
Plus GST as applicable will be impose.
The penalty will be deducted from bills payable either against this contract or from any Bank
Guarantee or any other amount payable under any other contract with the GETCO.
13.1 In the event of any emergency where in the judgment of the Engineer, delay would cause
serious loss or damages, repairs or adjustment may be made by the Engineer or a third
party chosen by the Engineer without advance notice to the Contractor and the cost of such
work shall be paid by the Contractor. In the event such action is taken by the Engineer, the
Contractor will be notified promptly and he shall assist wherever possible in making necessary
corrections. This shall not relieve the Contractor of his liabilities under the terms and conditions
of the Contract.
13.2 If it becomes necessary for the Contractor to rectify or renew any defective portions of the
works the provision of this clause shall apply to portion of the works so rectified or corrected
until the expiry of six (6) months from the date of such rectification or correction. If any
defects are not rectified within a reasonable time, the Engineer may proceed to do the work
at the Contractor’s risk and cost but without prejudice to any other rights which the Owner may
have against the Contractor in respect of such defects.
13.3 The rectification or correction of the work will be carried out free of cost by the Contractor.
If any rectification or correction is carried out on his behalf at the site, the Contractor shall bear
the cost of such rectification or correction.
13.4 The acceptance of the works by the Engineer shall in no way relieve the Contractor of his
obligations under this clause.
14.0 TAXES, PERMITS & LICENSES
The Contractor shall be liable and pay all non-Indian taxes, duties, levies lawfully assessed
against the Owner or the Contractor in pursuance of the Contract. In addition the Contractor
shall be responsible for payment of all Indian duties, levies and taxes lawfully assessed
against the Contractor for his personal income & property only.
15.0 DEFENSE OF SUITS
If any action in court is brought against the Owner or Engineer or an officer or agent of the
Owner, for the failure, omission or neglect on the part of the Contractor to perform any acts,
matters, covenants or things under the Contract, or for damage or injury caused by the alleged
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
omission or negligence on the part of the Contractor, his agents, representatives or his Sub-
Contractors, or in connection with any claim based on lawful demands of Sub-Contractors,
workmen, suppliers or employees, the Contractor shall in all such cases indemnify and keep
the Owner, and the Engineer and/or his representative, harmless from all losses, damages,
expenses or decrees arising of such action.
16.0 LIMITATION OF LIABILITIES
The final payment by the Owner in pursuance of the Contract shall mean the release of the
Contractor from all his liabilities under the Contract. Such final payment shall be made only at
the end of the Guarantee/Warranty period or after finalization of material account and final bill
and till such time as the Contractual liabilities and responsibilities of the Contractor, shall
prevail. All other payments made under the Contract shall be treated as on-account
17.0 ENGINEER’S DECISION
17.1 In respect of all matters which are left to the decision of the Engineer including the granting
or with- holding of the certificates, the Engineer shall, if required to do so by the Contractor,
give in writing a decision thereon.
17.2 If, in the opinion of the Contractor, a decision made by the Engineer is not in accordance
with the meaning and intent of the Contract, the Contractor may file with the Engineer, within
fifteen (15) days after receipt of the decision, a written objection to the decision.
Failure to file an objection within the allotted time will be considered as an acceptance of the
Engineer’s decision and the decision shall become final and binding.
17.3 The Engineer’s decision and the filing of the written objection thereto shall be a condition
precedent to the right to request arbitration. It is the intent of the Agreement that there
shall be no delay in the execution of the works and the decision of the Engineer as rendered
shall be promptly observed.
18.0 POWER TO VARY OR OMIT WORK
18.1 No alterations, amendments, omissions, suspensions or variations of the Works (hereinafter
‘variation’) under the Contract as detailed in the Contract Documents, shall be made by the
Contractor except as directed in writing by the Engineer, but the Engineer shall have full
powers subject to the provisions hereinafter contained, from time to time during the execution
of the Contract, by notice in writing to instruct the Contractor to make such variation
without prejudice to the Contract. The Contractor shall carry out such variation and be
bound by the same conditions as far as applicable as though the said variations occurred in
the Contract Documents. If any suggested variations would, in the opinion of the Contractor,
if carried out, prevent him from fulfilling any of his obligations or guarantees under the Contract,
he shall notify the Engineer thereof in writing and the Engineer shall decide forthwith whether
or not, the same shall be carried out and if the Engineer confirms his instructions,
the Contractor’s obligations and guarantees shall be modified to such an extent as may be
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
mutually agreed. Any agreed difference in cost occasioned by any such variation shall be
added to or deducted from the Contract Price as the case may be.
18.2 In the event of Engineer requiring any variation, a reasonable and proper notice shall be
given to the Contractor to enable him to work his arrangement accordingly, and in cases where
goods or materials are already prepared or any design, drawings or pattern made or work done
as per the contract requires to be altered, a reasonable and agreed sum in respect thereof shall
be paid to the Contractor.
18.3 In any case in which the Contractor has received instructions from the Engineer as to the
requirement of carrying out the alterations or additional or substituted work which either then
or later on, will in the opinion of the Contractor, involve a claim for additional payment, the
Contractor shall immediately and in no case later than thirty (30) days, after receipt of the
instructions aforesaid and before carrying out the instructions, advise the Engineer to that
effect. But the Engineer shall not become liable for payment of any charges in respect of any
such variations, unless the instructions for the performance of the same shall be confirmed
in writing by the Engineer.
18.4 If any variation in the Works results in reduction of Contract Price, the parties shall agree, in
writing, so to the extent of any change in the price, before the Contractor proceeds with the
18.5 In all the above cases, in the event of a disagreement as to the reasonableness of the
said sum, the decision of the Engineer shall prevail.
18.6 Notwithstanding anything stated above in this clause, the Engineer shall have the full power
to instruct the Contractor, in writing, during the execution of the Contract to vary the
quantities of the items or groups of items in accordance with the provisions of clause entitled
‘Change of Quantity’ in section GCC of this Volume-I. The Contractor shall carry out such
variations and be bound by the same conditions as though the said variations occurred in the
Contract Documents. However, the Contract Price shall be adjusted at the rates and the
prices provided for the original quantities in the Contract.
19.0 CHANGE OF QUANTITY
19.1 During the execution of the Contract, the Owner reserves the right to increase or decrease
or cancel the quantities of items under the Contract but without any change in unit price or
other terms & conditions. Such variations unless otherwise specified in the accompanying
Special Conditions of Contract and/or Technical Specifications, shall not be subjected to any
limitation for the individual items but the total variations in all such items under the Contract
shall be limited to a percentage of the Contract price as specified in the Special Conditions of
19.2 The Contract price shall accordingly be adjusted based on the unit rates available in the
Contract for the change in quantities as above. The base unit rates, as identified in the
Contract shall however remain constant during the currency of the Contract, except as
provided for in Clause 33.0 below. In case the unit rates are not available for the change in
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
quantity, the same shall be subjected to mutual agreement.
20.0 CO-OPERATION WITH OTHER CONTRACTORS AND CONSULTING ENGINEERS
The Contractor shall agree to cooperate with the Owner’s other Contractors and Consulting
Engineers and freely exchange with them such technical information as is necessary to obtain
the most efficient and economical design and to avoid unnecessary duplication of efforts. The
Engineer shall be provided with three copies of all correspondence addressed by the
Contractor to other Contractors and Consulting Engineers of the Owner in respect of such
exchange of technical information, wherever needed.
21.0 NO WAIVER OF RIGHTS
Neither the inspection by the Owner or the Engineer or any of their officials, employees, or
agents nor any order by the Owner or the Engineer for payment of money or any payment for
or acceptance of, the whole or any part of the Works by the Owner or the Engineer, nor
any extension of time, nor any possession taken by the Engineer shall operate as a waiver
of any provision of the Contract, or of any power herein reserved to the Owner or any right to
damages herein provided nor shall any waiver of any breach in the Contract be held to be a
waiver of any other or subsequent breach.
22.0 CERTIFICATE NOT TO AFFECT RIGHT OF OWNER AND LIABILITY OF THE
No interim payment certificate of the Engineer, nor any sum paid on account by the Owner,
nor any extension of time for execution of the Works granted by the Engineer shall affect or
prejudice the rights of the Owner against the Contractor or relieve the Contractor of his
obligation for the due performance of the Contract, or be interpreted as approval of the
Works done or of the equipment furnished and no certificate shall create liability for the
Owner to pay for alterations, amendments, variations or additional works not ordered, in
writing , by the Engineer or discharge the liability of the Contractor for the payment of
damages whether due, ascertained, or certified or not or any sum against the payment of
which he is bound to indemnify the Owner, nor shall any such certificate nor the acceptance
by him of any sum paid on account or otherwise affect or prejudice the rights of the Owner
against the Contractor.
23.0 PROGRESS REPORTS
During the various stages of the work in pursuance of the Contract, the Contractor shall at
his own cost submit periodic progress reports as may be reasonably required by the Engineer
with such materials as, charts, net-works, photographs, test certificates, etc. Such progress
reports shall be in the form and size as may be required by the Engineer.
24.0 TAKING OVER
Upon successful completion of all the tests to be performed at Site on equipment furnished and
erected by the Contractor, the Engineer shall issue to the Contractor a Taking over Certificate
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
as a proof of the final acceptance of the equipment. Such certificate shall not unreasonably
be withheld nor will the Engineer delay the issuance thereof on account of minor omissions
or defects which do not affect the commercial operation and/or cause any serious risk to the
equipment. Such certificate shall not relieve the Contractor of any of his obligations which
otherwise survive, by the terms and conditions of the Contract after issue of such certificate.
25.1 The payment to the Contractor for the performance of the works under the Contract will be
made by the Owner as per the guidelines and conditions specified herein. All payments made
during the Contract shall be on account payments only. The final payment will be made on
completion of all Works and on fulfillment by the Contractor of all his liabilities under the
Contract and production of work completion certificate of the Sub-Station in-charge, after following
the procedure’s of GETCO.
Payment of Invoice will be done as mentioned below.
1. 80% of FOR destination price (on Adhoc basis)
2. 20% of FOR destination price & GST be kept under retention account and be released towards
final settlement of such invoice after verifying benefits of higher ITC passed on to the GETCO, based
on Certificates from Practicing CA firm in regard to passing of ITC and reduction in Tax instance.
It is to state that under GST Regime, the Suppliers will be entitled to Input Tax Credit (lTC) in
respect of Tax paid on input goods & service used by him as against the earlier Tax regime where
CENVAT Credit was available on account of Excise Duty and Input Tax Credit was available on
account of VAT. Hence under Statutory Variation clause, Excise Duty clause and extension in
Contractual delivery clause of Purchase Order & Works Order, the Supplier or Contractor are
supposed to pass on benefit on account of higher Input Tax Credit now available, due to introduction
of GST, for ongoing and pending supply &I works orders.
Considering, the Anti Profiteering provision of GST and Excise Duty and Statutory Variation clause
of Purchase Order and Works Order issued by GETCO, invoive will be processed & paid on
Adhoc/ provisional basis as mentioned above keeping balance 20% of FOR destination price +
GST under retention account.
25.2 Currency of Payment
All payments under the Contract shall be in Indian Rupees
Payment terms will be as prescribed in the special conditions of contract and on fulfillment of
conditions specified thereof.
26.0 Payment Schedule
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
26.1 Application for Payment
26.2 The Contractor shall submit application for the payment in the prescribed Performa of
the Owner. Performa for application for payment will be as prescribed.
26.3 Each such application shall state the amount claimed and shall set forth in detail, in the
order of the Payment Schedule, particulars of the Works including the Works executed at Site
and of the equipment shipped/brought on to the site pursuant to the Contract up to the date
mentioned in the application and for the period covered since the last preceding certificate, if
26.4 Every interim payment certificate shall certify the Contract value of the Works executed up to
the date mentioned in the application for the payment certificate, provided that no sum shall
be included in any interim payment certificate in respect of the works that, according to the
decision of the Engineer, does not comply with the Contract.
26.5 Mode of Payment
26.6 Payment due on dispatch of equipment shall be made by the Owner through Owner’s Bank or
directly to the Contractor as per the payment schedule.
26.7 The payment of test charges, if any, payment, taxes and duties (whenever
admissible) inland transportation (including port handling), insurance and the erection portion
of the Works shall be made direct to the Contractor by the Owner.
26.8 All payments under the Contract shall be made as stipulated in the Special Conditions of
Contract after signing the Contract Agreement. The payments linked with the dispatch of
materials shall only be made after production of all dispatch documents as specified in the
relevant Contract conditions which will include the Material Inspection Clearance Certificate
issued by the Owner.
Progressive payments linked with erection shall only be made after the issue of certificates
by the Engineer, one for the quantum of work completed and the other for the successful
completion of quality check points involved in the quantum of work billed.
27.0 DEDUCTIONS FROM CONTRACT PRICE
All costs, damages or expenses that the Owner may have paid, for which under the
Contract the Contractor is liable, or any other retention award will be claimed by the
Owner. The Owner to the Contractor shall bill all such claims regularly as and when they fall
due. Such bills shall be supported by appropriate and certified vouchers or explanations, to
enable the Contractor to properly identify such claims. Such claims shall be paid by the
Contractor within thirty (30) days of the receipt of the corresponding bills and if not paid
by the Contractor within the said period, the Owner may then deduct the amount, from any
monies due or becoming due by him to the Contractor under the Contract or may be recovered
by sections of Law or otherwise.
D. RISK DISTRIBUTION
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
28.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may be
pertinent to the Works and obligatory in terms of law to protect his interest and interests of
the Owner against all perils detailed herein. The form and the limit of such insurance as defined
herein together with the under-writer in each case shall be acceptable to the Owner.
However, i r r e s p e c t i v e of such acceptance, the responsibility to maintain adequate
insurance coverage at all time during the period of Contract shall be of Contractor alone. The
Contractor’s failure in this regard shall not relieve him of any of his contractual responsibilities
and obligations. The insurance covers to be taken by the Contractor shall be in the joint name
of the Owner and the Contractor. The Contractor shall, however, be authorized to deal
directly with Insurance Company or Companies and shall be responsible in regard to
maintenance of all insurance covers. Further the insurance should be in freely convertible
28.2 Any loss or damage to the equipment during handling, transportation, storage, erection,
putting into satisfactory operation and all activities to be performed till the successful
completion of commissioning of the equipment shall be to the account of the Contractor.
The Contractor shall be responsible for preference of all claims and make good the damages
or loss by way of repairs and/or replacement of the equipment, damaged or lost. The transfer
of title shall not in any way relieve the Contractor of the above responsibilities during the period
of Contract. The Contractor shall provide the Owner with copy of all insurance policies and
documents taken out by him in pursuance of the Contract. Such copies of documents
shall be submitted to the Owner immediately after such insurance coverage. The Contractor
shall also inform the Owner in writing at least sixty (60) days in advance
regarding the expiry/cancellation and/or change in any of such documents and ensure
revalidation, renewal etc., as may be necessary well in time.
28.3 The perils required to be covered under the insurance shall include, but not be limited to
fire and allied risks, miscellaneous accidents (erection risks) workman compensation risks,
loss or damage in transit, theft, pilferage, riot and strikes and malicious damages, civil
commotion, weather conditions, accidents of
all kinds, etc. The scope of such insurance shall be adequate to cover the
replacement/reinstatement cost of the equipment for all risks up to and including delivery of
goods and other costs till the equipment is delivered at Site. The insurance policies to be taken
should be on replacement value basis and/or incorporating escalation clause. Notwithstanding
the extent of insurance cover and the amount of claim available from the underwriters, the
Contractor shall be liable to make good the full replacement/rectification value of all
equipment/materials and to ensure their availability as per project requirements.
28.4 All costs on account of insurance liabilities covered under the Contract will be on Contractor’s
account and will be included in Contract Price, However, the Owner may from time to time,
during the pendency of the Contract, ask the Contractor in writing to limit the insurance
coverage, risks and in such a case, the parties to the Contract will agree for a mutual settlement,
for reduction in Contract price to the extent of reduced premium amount. The Contractor,
while arranging the insurance shall ensure to obtain all discounts on premium, which may
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
be available for higher volume or for reason of financing arrangement of the project.
28.5 The clause entitled ‘Insurance’ under the section ECC of this Volume-I, covers the additional
insurance requirements for the portion of the works to be performed at the Site.
28.6 Special Conditions of Contract details out the various insurance liabilities.
29.0 LIABILITY FOR ACCIDENTS AND DAMAGES
Under the Contract, the Contractor shall be responsible for loss or damage to the plant until the
successful completion of commissioning as defined elsewhere in the Bid document.
30.0 DELAYS BY OWNER OR HIS AUTHORISED AGENTS
30.1 In case the Contractor’s performance is delayed due to any act of omission on the part of the
Owner or his authorized agents, then the Contractor shall be given due extension of time
for the completion of the Works, to the extent such omission on the part of the Owner
has caused delay in the Contractor’s performance of the Contract.
Regarding reasonableness or otherwise of the extension of time, the decision of the Engineer
shall be final.
30.2 In addition, the Contractor shall be entitled to claim demonstrable and reasonable compensation
if such delays have resulted in any increase in cost. The Owner shall examine the justification
for such a request for claim and if satisfied, the extent of compensation shall be mutually agreed
depending upon the circumstances at the time of such an occurrence.
31.0 FORCE MAJOR
31.1 Force major is herein defined as any cause which is beyond the control of the Contractor or
the Owner as the case may be, which they could not foresee or with a reasonable amount of
diligence could not have foreseen and which substantially affects the performance of the
Contract, such as:
a. Natural phenomena, including but not limited to floods, droughts, earthquakes and
b. Acts of any Government, domestic or foreign, including but not limited to war,
declared or undeclared, priorities, guarantees, and embargoes.
Provided either party shall within fifteen (15) days from the occurrence of such a cause notify
the other in writing of such causes.
31.2 The Contractor or the Owner shall not be liable for delays in performing his obligations resulting
from any force major cause as referred to and/or defined above The date of completion will,
subject to hereinafter provided, be extended by a reasonable time even though such cause
may occur after Contractor’s performance of obligation has been delayed due to other causes.
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
32.0 SUSPENSION OF WORK
32.1 The Owner reserves the right to suspend and reinstate execution of the whole or any part
of the Works without invalidating the provisions of the Contract. Orders for suspension or
reinstatement of the Works will be issued by the Engineer to the Contractor in writing. The time
for completion of the works will be extended for a period equal to duration of the suspension.
32.2 Any necessary and demonstrable cost incurred by the Contractor as a result of such suspension
of the works will be paid by the Owner, provided such costs are substantiated to the satisfaction
of the Engineer. The Owner shall not be responsible for any liabilities if suspension or delay is
due to some default on the part of the Contractor or his Sub-Contractor.
33.0 CONTRACTOR`S DEFAULT
33.1 If the Contractor shall neglect to execute the works with due diligence and expedition or shall
refuse or neglect to comply with any reasonable order given to him, in writing by the Engineer
in connection with the works or shall contravene the provisions of the Contract, the Owner may
give notice in writing to the Contractor to make good the failure, neglect or contravention
complained of. Should the Contractor fail to comply with the notice within thirty (30) days from
the date of serving the notice, then and in such case the Owner shall be at liberty to employ
other workmen and forthwith execute such part of the works as the Contractor may have
neglected to do or if the Owner shall think fit, without prejudice to any other right he may
have under the Contract to take the work wholly or in part out of the Contractor’s hands and re-
contract with any other person or persons to complete the works or any part thereof and in
that event the Owner shall have free use of all Contractor’s equipment that may have been at
the time on the Site in connection with the works without being responsible to the Contractor
for fair wear and tear thereof and to the exclusion of any right of the Contractor over the same,
and the Owner shall be entitled to retain and apply any balance which may otherwise be due
on the Contract by him to the Contractor, or such part thereof as may be necessary, to the
payment of the cost of executing the said part of the Works or of completing the Works as the
case may be. If the cost of completing of works or executing part thereof as aforesaid shall
exceed the balance due to the Contractor shall pay such excess. Such payment of excess
amount shall be independent of the liquidated damages for delay which the Contractor shall
have to pay if the completion of works is delayed.
33.2 In addition, such action by the Owner as aforesaid shall not relieve the Contractor of his
liability to pay liquidated damages for delay in completion of Works as defined in Clause
of this Section.
33.3 Such action by the Owner as aforesaid the termination of the Contract under this clause
shall not entitle the Contractor to reduce the value of the Contract Performance Guarantee
nor the time thereof. The Contract Performance Guarantee shall be valid for the full value and
for the full period of the Contract including guarantee period.
34.0 TERMINATION OF CONTRACT ON OWNER`S INITIATIVE
34.1 The Owner reserves the right to terminate the Contract either in part or in full due to reasons
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
other than those mentioned under clause entitled ‘Contractor’s Default’. The Owner shall in
such an event give fifteen (15) days notice in writing to the Contractor of his decision to do so.
34.2 The Contractor upon receipt of such notice shall discontinue the work on the date and
to the extent specified in the notice, make all reasonable efforts to obtain cancellation of all
orders and Contracts to the extent they are related to the work terminated and terms
satisfactory to the Owner, stop all further sub- contracting or purchasing activity related to
the work terminated, and assist Owner in maintenance, protection, and disposition of the
works acquired under the Contract by the Owner.
In the event of such a termination the Contractor shall be paid compensation, equitable and
reasonable, dictated by the circumstances prevalent at the time of termination.
34.3 If the Contractor is an individual or a proprietary concern and the individual or the proprietor
dies and if the Contractor is a partnership concern and one of the partners dies then unless the
Owner is satisfied that the legal representatives of the individual Contractor or of the proprietor
of the propriety concern and in the case of partnership, the surviving partners, are capable of
carrying out and completing the Contract the Owner shall be entitled to cancel the Contract
as to its incomplete part without being in any way liable to payment of any compensation
to the estate of deceased Contractor and/or to the surviving partners of the Contractor’s
firm on account of the cancellation of the Contract. The decision of the Owner that the
legal representatives of the deceased Contractor or surviving partners of the Contractor’s firm
cannot carry out and complete the Contract shall be final and binding on the parties. In the
event of such cancellation the Owner shall not hold the estate of the deceased Contractor
and/or the surviving partners of the estate of the deceased Contractor and/or the surviving
partners of the Contractor’s firm liable to damages for not completing the Contract.
35.0 FRUSTRATION OF CONTRACT
35.1 In the event of frustration of the Contract because of supervening impossibility in terms of
Section 56 of the Indian Contract Act, parties shall be absolved of their responsibility to perform
the balance portion of the Contract, subject to provisions contained in sub-clause 45.3 below.
35.2 In the event of non-availability or suspension of funds for any reasons, whatsoever (except
for reason of willful or flagrant breach by the Owner) and/or Contractor then the works under the
Contract shall be suspended.
Furthermore, if the Owner is unable to make satisfactory alternative arrangements for financing
to the Contractor in accordance with the terms of the Contract within three months of the
event, the parties hereto shall be relieved from carrying out further obligations under the
Contract treating it as frustration of the Contract.
35.3 In the event referred to in sub-clauses 45.1 & 45.2 above the parties shall mutually discuss
to arrive at reasonable settlement on all issues including amounts due to either party for the
work already done on quantum merit basis, which shall be determined by mutual agreement
between the parties.
36.0 GRAFTS AND COMMISSIONS ETC.
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Any graft, commission, gift or advantage given, promised or offered by or on behalf of the
Contractor or his partner(s), agent(s), officer(s), director(s), employee(s) or servant(s) or any
one on his or their behalf in relation to the obtaining or to the execution of this or any other
Contract with the Owner, shall in addition to any criminal liability which it may incur, subject
the Contractor to the cancellation of this and all other Contracts and also to payment of
any loss or damage to the Owner resulting from any cancellation. The Owner shall
then be entitled to deduct the amount so payable from any monies otherwise due to
Contractor under the Contract.
RESOLUTION OF DISPUTES
37.0 SETTLEMENT OF DISPUTES
37.1 Any dispute(s) or difference(s) arising out of or in connection with the Contract shall, to
the extent possible, be settled amicably between the parties.
37.2 If any dispute or difference of any kind, whatsoever, shall arise between the Owner and the
Contractor, arising out of the Contract for the performance of the Works whether during the
progress of the Works or after its completion or whether before or after the termination,
abandonment or breach of the Contract, it shall, in the first place, be referred to and settled by
the Engineer, who, within a period of thirty (30) days after being requested by either party to
do so, shall give written notice of his decision to the Owner and the Contractor.
37.3 Save as hereinafter provided, such decision in respect of every matters so referred shall
be final and binding upon the parties until the completion of the Works and shall forthwith be
given effect to by the Contractor who shall proceed with the Works with all due diligence,
whether he or the Owner requires arbitration as hereinafter provided or not.
37.4 If after the Engineer has given written notice of his decision to the parties, no claim to
arbitration has been communicated to him by either party within thirty (30) days from the receipt
of such notice, the said decision shall become final and binding on the parties.
37.5 In the event of the Engineer failing to notify his decision as aforesaid within thirty (30) days
after being requested as aforesaid, or in the event of either the Owner or the Contractor being
dissatisfied with any such decision, or within thirty (30) days after the expiry of the first
mentioned period of thirty days, as the case may be, either party may require that the matters
in dispute be referred to arbitration as hereinafter provided.
38.0 ARBITRATION
All disputes or differences in respect of which the decision, if any, of the Engineer has not become
final or binding as aforesaid shall be settled by arbitration in the manner hereinafter provided.
(1) Amicable Settlement
Any dispute, difference, controversy or claim between the Parties arising out of or relating to this contract
with reference to the construction, interpretation, breach, termination or validity thereof (hereinafter referred
as "the Dispute") shall, upon the written request of either Party be referred to the authorized representatives
of the Disputing Parties for resolution. The authorized representatives shall promptly meet and attempt to
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
negotiate in good faith a resolution of the Dispute within thirty days of the service of the request.
(2) Arbitration
If the parties fail to amicably resolve the disputes or differences or contrary claims as indicated herewith in
sub clause (1) of Clause 38, arising under or in connection with the present works contracts, whether
pertaining to works contracts alone or works and procurement both, the same shall be referred to arbitration
under the Gujarat Public Works Contracts Disputes Arbitration Tribunal Act, 1992."
39.0 RECONCILIATION OF ACCOUNTS
The Contractor shall prepare and submit every one month, a statement covering payments
claimed and the payments received vis-à-vis the works executed, for reconciliation of accounts
with the Owner. The Contractor shall also prepare and submit a detailed account of
Owner Issue materials received and utilized by him for reconciliation purpose in a format to
be discussed & finalized with the Owner before the award of Contract.
ERECTION CONDITIONS OF CONTRACT
1.1 The following shall supplement the conditions already contained in other parts of these
specifications & document and shall govern the portion of the work of this Contract to be performed at
1.2 The Contractor upon signing of the Contract shall, nominate a responsible officer as his
representative at Site suitably designated for the purpose of overall responsibility and
coordination of the works to be performed at Site. Such person shall function from the Site
office of the Contractor during the pendency of Contract.
2.0 REGULATION OF LOCAL AUTHORITIES AND STATUTES
2.1 The Contractor shall comply with all the rules and regulations of local authorities during the
performance of his field activities. He shall also comply with the Minimum Wages Act,
and the Payment of Wages Act (both of the Government of India) and the rules made there
under in respect of any employee or workman employed or engaged by him or his Sub-
Contractor. He shall abide by labor laws and others as specified in the special conditions of
2.2 All registration and statutory inspection fees, if any, in respect of his work pursuant to this
Contract shall be to the account of the Contractor. Should any such inspection or registration
need to be re-arranged due to the fault of the Contractor or his Sub Contractor, the
additional fees to such inspection and/or registration also shall be borne by the Contractor.
3.0 OWNER’S LIEN ON EQUIPMENT
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
The Owner shall have lien on all equipment brought to the Site for the purpose of erection,
testing and commissioning of the equipment to be supplied & erected under the Contract. The
Owner shall continue to hold the lien on all such equipment throughout the period of Contract.
No material brought to the Site shall be removed from the Site by the Contractor and/or his Sub-
Contractors without the prior written approval of the Engineer.
4.0 ACCESS TO SITE AND WORKS ON SITE
4.1 Suitable access to and possession of the Site shall be afforded to the Contractor by
the Owner in reasonable time.
4.2 The works so far as it is carried out on the Owner’s premises, shall be carried out at such
time as the Owner may approve and the Owner shall give the Contractor reasonable facilities
for carrying out the works.
4.3 In the execution of the works, no person other than the Contractor or his duly appointed
representative, Sub- Contractor and workmen, shall be allowed to do work on the Site, except
by the special permission, in writing of the Engineer or his representative.
5.0 CONTRACTOR’S SITE ESTABLISHMENT
The Contractor shall at all times keep posted an authorized representative for the purpose of
the Contract. Any written order or instruction of the Engineer or his duly authorized
representative shall be communicated to the said authorized resident representative of the
Contractor and the representative shall be available at a stated address for this purpose.
6.0 CO-OPERATION WITH OTHER CONTRACTORS
6.1 The Contractor shall co-operate with all other Contractors or tradesmen of the Owner,
who may be performing other works on behalf of the Owner and the workmen who may be
employed by the Owner and doing work in the vicinity of the Works under the Contract. The
Contractor shall also so arrange to perform his work as to minimize, to the maximum extent
possible, interference with the work of other Contractors and their workmen. Any injury or
damage that may be sustained by the employees of the other Contractors and the Owner,
due to the Contractor’s work shall promptly be made good at the Contractor’s own expense.
7.0 DISCIPLINE OF WORKMEN
The Contractor shall adhere to the disciplinary procedure set by the Engineer in respect of his
employees and workmen at Site. The Engineer shall be at liberty to object to the presence
of any representative or employee of the Contractor at the Site, if in the opinion of the Engineer
such employee has misconduct himself or is incompetent or negligent or otherwise undesirable
and then the Contractor shall remove such a person objected to and provide in his place a
competent replacement.
8.0 CONTRACTOR’S FIELD OPERATION
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
8.1 The Contractor shall keep the Engineer informed in advance regarding his field activity
plans and schedules for carrying-out each part of the works. Any review of such plan or
schedule or method of work by the Engineer shall not relieve the Contractor of any of his
responsibilities towards the field activities. Such reviews shall also not be considered as an
assumption of any risk or liability by the Engineer or the Owner or any of his representatives
and no claim of the Contractor will be entertained because of the failure or inefficiency of any
such plan or schedule or method of work reviewed. The Contractor shall be solely responsible
for the safety, adequacy and efficiency of plant and equipment and his erection methods.
8.2 The Contractor shall have the complete responsibility for the conditions of the Work-site
including the safety of all persons employed by him or his Sub–Contractor and all the
properties under his custody during the performance of the work. This requirement shall apply
continuously till the completion of the Contract and shall not be limited to normal working hours.
9.0 PROGRESS REPORT
9.1 The Contractor shall furnish three (3) copies each to the Engineer of progress
including if any, photographs of the work done at Site.
9.2 The monthly progress report detailing-out the progress achieved on all erection activities
shall highlight comparison to the schedules. The report shall also indicate the reasons for
the variance between the scheduled and actual progress and the action proposed for corrective
measures, wherever necessary.
10.0 MAN-POWER REPORT
10.1 The Contractor shall submit to the Engineer, on the first day of every month, a man hours
schedule for the month, detailing the man hours scheduled for the month, skill-wise and area-
11.0 PROTECTION OF WORK
The Contractor shall have total responsibility for protecting his works till it is finally taken over
by the Engineer. No claim will be entertained by the Owner or by the Engineer for any
damage or loss to the Contractor’s works and the Contractor shall be responsible for
complete restoration of the damaged works to original conditions to comply with the
specification and drawings.
12.0 EMPLOYMENT OF LABOR
12.1 The Contractor will be expected to employ on the work only his regular skilled
employees with experience of his particular work. No person below the age of eighteen years
shall be employed.
12.2 All traveling expenses including provisions of necessary transport to and from Site, lodging,
allowances and other payments to the Contractor’s employees shall be the sole responsibility
of the Contractor.
12.3 In case the Owner becomes liable to pay any wages or dues to Labor or any Government
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
agency under any of the provisions of the Minimum Wages Act, Workmen Compensation
Act, Contract Labor Regulation Abolition Act or any other law due to act of omission of the
Contractor, the Owner may make such payment and shall recover the same from the
Contractor’s bills.
13.0 FACILITIES TO BE PROVIDED BY THE OWNER
Land for Contractor’s Store, Workshop etc.
a) The Engineer shall at his discretion and for the duration of execution of the Contract make
available at site, land for construction of Contractor’s field office, workshop, stores, etc. required
for execution of the Contract. Any such temporary construction shall be done by the Contractor
b) On completion of work the Contractor shall hand over the land duly cleaned to the Engineer.
unless the Contractor has handed over the vacant possession of land allotted to him for the
above purpose, the payment of his final bill shall not be made.
13.2 Electricity: Power Supply
Where power supply is available with the Owner for construction purpose the same will be
provided at the job site at one point of the distribution system as may be decided by Engineer
free of charge for consumption in works. Electricity furnished will be 440 volts, 3 phase,
cycles and 230 volts, 1 phase,50 cycles. Each Contractor shall provide and install all
necessary transformers, switchgears, wiring fixtures, bulbs and other temporary equipment
for further distribution and utilization of energy for power and lighting and shall remove the
same on completion of the work. Should, however, electricity be used in the Contractor’s
Labor/staff colony, the power so consumed shall be charged at the prevailing tariff rate of
the GUVNL as prevalent for that area at the time of award of work; the supply may be withdrawn
if the power is used for purposes other than for the work of the project and the Contractor
shall not be entitled to any claim whatsoever on account of any such action taken by the
14.0 FACILITIES TO BE PROVIDED BY THE CONTRACTOR
14.1 Tools, tackles and scaffoldings
The Contractor shall provide all the construction equipments; tools, tackles and scaffoldings
required for pre-assembly, erection, testing and commissioning of the equipment covered under
the Contract. He shall submit a list of all such materials to the Engineer before the
commencement of work at Site. These tools and tackles shall not be removed from the Site
without the written permission of the Engineer.
The Contractor shall provide necessary first-aid facilities for all his employees,
representatives and workmen working at the Site. Enough number of Contractor’s personnel
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
shall be trained in administering first-aid.
14.3 Cleanliness
The Contractor shall be responsible for keeping the entire area allotted to him clean and free
from rubbish, debris etc. during the period of Contract. The Contractor shall employ enough
number of personnel to keep the work area clean. Materials and stores shall be so arranged
to permit easy cleaning of the area. In areas where equipment might drip oil and cause damage
to the floor surface, a suitable protective cover of a flame resistant, oil proof sheet shall be
provided to protect the floor from such damage.
15.0 LINES AND GRADES
All the works shall be performed to the lines, grades and elevations indicated on the
drawings. The Contractor shall be responsible to locate and lay-out the works. Basic
horizontal and vertical control points will be established and marked by the Engineer at site at
suitable points. These points shall be used as datum for the works under the Contract. The
Contractor shall inform the Engineer well in advance of the times and places at which he
wishes to do work in the area allotted to him so that suitable datum points may be established
and checked by the Engineer to enable the Contractor to proceed with his works. Any
work done without being properly located may be removed and/or dismantled by the
Engineer at Contractor’s expense.
16.0 FIRE PROTECTION
16.1 The work procedures that are to be used during the erection shall be those, which minimize
fire hazards to the extent practicable. Combustible materials, combustible waste and rubbish
shall be collected and removed from the Site at least once each day. Fuels, oils and volatile
or inflammable materials shall be stored away from the construction and equipment and
materials storage areas.
16.2 All the Contractor’s supervisory personnel and select number of workers shall be trained for fire
Enough of such trained personnel must be available at the Site during the entire period of
The Contractor shall have total responsibility for all equipment and materials in his
custody/stores, loose, semi-assembled and/or erected by him at Site. The Contractor shall
make suitable security arrangements ensure the protection of all materials, equipment and
works from theft, fire, pilferage and any other damages and loss.
18.0 PRE-COMMISSIONING TRIALS AND INITIAL OPERATIONS
The pre-commissioning trials and initial operations of the equipment erected by the Contractor
shall be carried out in presence of contractor and is deemed considered as part of the work
completion. If it is anticipated that the above test may prolong for a long time, the Contractor’s
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
workmen required for the above test shall always be present at Site during such tests and trials.
19.0 MATERIALS HANDLING AND STORAGE
19.1 All the equipment furnished under the Contract and arriving at Site shall be promptly received,
unloaded, transported and stored in the storage spaces by the Contractor.
19.2 Contractor shall be responsible for examining all the shipment and notify the Engineer
immediately of any damages, storage, discrepancy etc, for the purpose of Engineer’s
information only. The Contractor shall submit to the Engineer every week a report detailing all
the receipts during the week. However, the Contractor shall be solely responsible for any
shortages or damages in transit, handling and / or in storage and erection of the equipment at
Site. Any demurrage, wharf age and other such charges claimed by the transporters, railways
etc, shall be to the account of the Contractor.
19.3 The Contractor shall maintain an accurate and exhaustive record detailing out the list of all
equipment materials received by him for the purpose of erection and keep such record open
for the inspection of the Engineer in-charge.
19.4 All equipment shall be handled very carefully to prevent any damage or loss. The equipment
stored shall be properly protected to prevent damage either to the equipment or to the floor
where they are stored. The equipment from the store shall be moved to the actual location
at the appropriate time so as to avoid damage of such equipment at Site.
19.5 All electrical panels, control gears, motors and such other devices shall be properly dried
by heating before they are installed and energized. Motor bearings, slip ring, commutators
and other exposed parts shall be protected against moisture ingress and corrosion during
storage and periodically inspected.
19.6 All the electrical equipment such as motors, generators, etc. shall be tested for insulation
resistance at least once in three months from the date of receipt till the date of commissioning
and a record of such measured insulation values maintained by the Contractor. Such records
shall be opened for inspection by the Engineer.
19.7 The consumable and other supplies likely to deteriorate due to storage must be thoroughly
protected and stored in a suitable manner to prevent damage or deterioration in quality by
19.8 All the materials stored in the open or dusty location must be covered with suitable
weatherproof and flame proof covering material wherever applicable.
19.9 If the materials belonging to the Contractor are stored in areas other than those earmarked
for him, the Engineer will have the right to get it moved to the area earmarked for the Contractor
at the Contractor’s cost.
19.10 The Contractor shall be responsible for making suitable indoor storage facilities to store all
equipment, which require indoor storage. Normally, all the electrical equipment such as
motors, control gears, generators, exciters and consumables like electrodes, lubricants etc.
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
shall be stored in the closed storage space. The Engineer, in addition, may direct the
Contractor to move certain other materials, which in his opinion will require indoor storage, to
indoor storage areas, which the Contractor shall strictly comply with.
20.0 CONSTRUCTION MANAGEMENT
20.1 The field activities of the Contractors working at Site will be coordinated by the Engineer
and the Engineer’s decision shall be final in resolving any disputes or conflicts between the
Contractor and other Contractors and the tradesmen of the Owner regarding scheduling
and coordination of work. Such decision by the Engineer shall not be a cause for extra
compensation or extension of time for the Contractor.
20.2 The Engineer shall hold weekly meetings of the Contractor at Site, at a time and place to be
designated by the Engineer. The Contractor shall attend such meetings and take notes of
discussions during the meeting and the decision of the Engineer and shall strictly adhere to
those decisions in performing his works. In addition to the above weekly meeting, the Engineer
may call for other meetings either with individual Contractors or with selected number of
Contractors and in such a case the Contractors if called, will also attend such meetings.
20.3 Time is the essence of the Contract and the Contractor shall be responsible for performance
of his works in accordance with the specified construction schedule. If at any time, the
Contractor is falling behind the schedule, he shall take necessary action to make good for such
delays by increasing his work force or by working overtime or otherwise accelerate the progress
of the work to comply with the schedule and shall communicate such actions in writing to the
Engineer, satisfying that his action will compensate for the delay. The Contractor shall not be
allowed any extra compensation for such action.
20.4 The Engineer shall, however, not be responsible for provision of additional Labor and/or
materials or supply or any other services to the Contractor except for the coordination
work between various Contractors if any at site.
21.0 FIELD OFFICE RECORDS
The Contractor shall maintain up to date copies of all drawings, specifications and other
Contract Documents and any other supplementary data complete with all the latest
revisions thereto. The Contractor shall also maintain in addition the continuous record of all
changes to the above Contract Documents, drawings, specifications, and supplementary data,
etc. effected at the field and on completion of his total assignment under the Contract shall
incorporate all such changes on the drawings and other Engineering data to indicate as
installed conditions of the equipment furnished and erected under the Contract. Such
drawings and Engineering data shall be submitted to the Engineer in required number of
22.0 CONTRACTOR’S MATERIALS BROUGHT TO SITE
22.1 The Contractor shall bring to Site all equipment, components, parts, materials, including
construction equipment, tools and tackles for the purpose of the works under intimation to
the Engineer. All such goods shall, from the time of their being brought vest in the Owner,
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
but may be used for the purpose of the works only and shall not on any account be removed
or taken away by the Contractor without the written permission of the Engineer. The Contractor
shall nevertheless be solely liable and responsible for any loss or destruction thereof and
damage thereto.
22.2 The Owner shall have a lien on such goods for any sum or sums which may at any time be
due or owing to him by the Contractor, under, in respect of or by reasons of the Contract.
After giving a fifteen (15) days notice in writing of his intention to do so, the Owner shall be
at liberty to sell and dispose off any such goods, in such manner as he shall think fit and to
apply the proceeds in or towards the satisfaction of such sum or sums due as aforesaid.
22.3 After the completion of the Works, the Contractor shall remove from the Site under the direction
of the Engineer the materials such as construction equipment, erection tools and tackles,
scaffolding etc. with the written permission of the Engineer.
23.0 PROTECTION OF PROPERTY AND CONTRACTOR’S LIABILITY
23.1 The Contractor shall be responsible for any damage resulting from his operations. He
shall also be responsible for protection of all persons including members of public and
employees of the Owner and the employees of other Contractors and Sub-Contractors and all
public and private property.
24.1 In addition to the conditions covered under the Clause entitled ‘Insurance’ in General
Terms and Conditions of Contract of this Volume-I, the following provisions will also apply to
the portion of works to be done beyond the Contractor’s own or his Sub-Contractor’s
manufacturing Works.
24.2 Workmen’s Compensation Insurance
This insurance shall protect the Contractor against all claims applicable under the
Workmen’s Compensation Act, 1948 (Government of India). This policy shall also cover
the Contractor against claims for injury, disability, disease or death of his or his Sub-
Contractor’s employee, which for any reason are not covered under the Workmen’s
Compensation Act, 1948. The liabilities shall not be less than:
Workmen’s : As per statutory Provisions
Employee’s : As per statutory
Liability Provisions
24.3 Comprehensive General Liability Insurance
The insurance shall protect the Contractor against all claims arising from injuries, disabilities,
disease or death of members of public or damage to property of others, due to any act of
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
omission on the part of the Contractor, his agents, his employees, his representatives and Sub-
Contractors or from riots, strikes and civil commotion.
2.4.4 The hazards to be covered will pertain to all the works and areas where the Contractor,
his Sub- Contractors, his agents and his employees have to perform work pursuant to the
24.5 The above are only illustrative list of insurance covers normally required and it will be the
responsibility of the Contractors to maintain all necessary insurance coverage to the extent
both in time and amount to take care of all his liabilities either direct or indirect, in pursuance of
25.0 UNFAVORABLE WORKING CONDITIONS
The Contractor shall confine all his field operations to those works, which can be performed
without subjecting the equipment and materials to adverse effects during inclement weather
conditions, like monsoon, storms etc. and during other unfavorable construction conditions. No
field activities shall be performed by the Contractor under conditions, which might adversely
affect the quality and efficiency thereof, unless special precautions or measures are taken by
the Contractor in a proper and satisfactory manner in the performance of such Works and with
the concurrence of the Engineer. Such unfavorable construction conditions will in no way relieve
the Contractor of his responsibility to perform the Works as per the schedule.
26.0 PROTECTION OF MONUMENTS AND REFERENCE POINTS
The Contractor shall ensure that any finds such as relic, antiquity, coins, fossils, etc. which he
may come across during the course of performance of his Works either during excavation or
elsewhere, are properly protected and handed over to the Engineer. Similarly the Contractor
shall ensure that the bench marks, reference points, etc, which are marked either with the
help of Engineer or by the Engineer shall not be disturbed in any way during the performance
of his Works. If any work is to be performed which disturbs such reference the same shall
be done only after these are transferred to other suitable locations under the direction of the
Engineer. The Contractor shall provide all necessary materials and assistance for such
relocation of reference points etc.
27.0 WORK & SAFETY REGULATIONS
27.1 The Contractor shall ensure proper safety of all the workmen, materials, plant and equipment
belonging to him or to or to others, working at the Site. The Contractor shall also be responsible
for provision of all safety notices and safety equipment required both by the relevant legislations
and the Engineer, as he may deem necessary.
27.4 All equipment used in construction and erection by Contractor shall meet Indian/International
Standards and where such standards do not exist, the Contractor shall ensure these to
be absolutely safe. All equipment shall be strictly operated and maintained by the Contractor
in accordance with manufacturer’s Operation Manual and safety instructions and as per
Guidelines/rules of in this regard.
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
27.5 Periodical examinations and all tests for all lifting/hoisting equipment & tackles shall be carried-
out in accordance with the relevant provisions of Factories Act 1948, Indian Electricity Act
and associated Laws/Rules in force from time to time. A register of such examinations
and tests shall be properly maintained by the Contractor and will be promptly produced as
and when desired by the Engineer or by the person authorized by him.
27.6 The Contractor shall provide suitable safety equipment of prescribed standard to all
employees and workmen according to the need.
27.8 The Contractor shall provide safe working conditions to all workmen and employees at the
Site including safe means of access, railings, stairs, ladders, scaffoldings etc. The scaffoldings
shall be erected under the
control and supervision of an experienced and competent person. For erection, good and
standard quality of material only shall be used by the Contractor.
27.9 The Contractor shall not interfere or disturb electric fuses, wiring and other electrical
equipment belonging to the Owner or other Contractors under any circumstances,
whatsoever, unless expressly permitted in writing by to handle such fuses, wiring or electrical
27.10 Before the Contractor connects any electrical appliances to any plug or socket belonging to
Contractor or Owner, he shall:
a. Satisfy the Engineer that the appliance is in good working condition;
b. Inform the Engineer of the maximum current rating, voltage and phases of the appliances;
c. Obtain permission of the Engineer detailing the sockets to which the appliances
may be connected.
27.11 The Engineer will not grant permission to connect until he is satisfied that;
a. The appliance is in good condition and is fitted with suitable plug;
b. The appliance is fitted with a suitable cable having two earth conductors, one of which
shall be an earthed metal sheath surrounding the cores.
27.12 No electric cable in use by the Contractor/Owner will be disturbed without prior permission.
No weight of any description will be imposed on any cable and no ladder or similar equipment
will rest against or attached to it.
27.13 No repair work shall be carried out on any live equipment. The equipment must be declared
safe by the Engineer and a permit to work shall be issued by the Engineer before any repair
work is carried out by the Contractor. While working on electric lines/equipment, whether live
or dead, suitable type and sufficient quantity of tools will have to he provided by the Contractor
to electricians/workmen/officers.
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
27.14 In case any accident occurs during the construction/ erection or other associated activities
undertaken by the Contractor thereby causing any minor or major or fatal injury to his
employees due to any reason, whatsoever, it shall be the responsibility of the Contractor to
promptly inform the same to the Engineer in prescribed form and also to all the authorities
envisaged under the applicable laws.
27.15 The Engineer shall have the right at his sole discretion to stop the work, if in his opinion
the work is being carried out in such a way that it may cause accidents and endanger the
safety of the persons and/or property, and/or equipment. In such cases, the Contractor shall
be informed in writing about the nature of hazards and possible injury/accident and he shall
comply to remove shortcomings promptly. The Contractor after stopping the specific work
can, if felt necessary, appeal against the order of stoppage of work to the Engineer within
days of such stoppage of work and decision of the Engineer in this respect shall be conclusive
and binding on the Contractor.
27.16 The Contractor shall not be entitled for any damages/compensation for stoppage of work
due to safety reasons as provided in Para 31.18 above and the period of such stoppage of
work will not be taken as an extension of time for completion of work and will not be the
ground for waiver of levy of liquidated damages.
27.17 It is mandatory for the Contractor to observe during the execution of the works, requirements
of Safety Rules which would generally include but not limited to following
a) Each employee shall be provided with initial indoctrination regarding safety by the
Contractor, so as to enable him to conduct his work in a safe manner.
b) No employee shall be given a new assignment of work unfamiliar to him without proper
introduction as to the hazards incident thereto, both to himself and his fellow employees.
c) Employees must not leave naked fires unattended. Smoking shall not be permitted around
fire prone areas and adequate firefighting equipment shall be provided at crucial location.
d) There shall be a suitable arrangement at every work site for rendering prompt and sufficient
first aid to the injured.
j) Requirements of ventilation in underwater working to licensed and experienced divers,
use of gum boots for working in slushy or in inundated conditions are essential requirements
to be fulfilled.
27.18 The Contractor shall follow and comply with all Safety Rules, relevant provisions of
applicable laws pertaining to the safety of workmen, employees, plant and equipment as may
be prescribed from time to time without any demur, protest or contest or reservations. In case
of any discrepancy between statutory requirement and Safety Rules referred above, the
latter shall be binding on the Contractor unless the statutory provisions are more stringent.
a. Fatal injury or accident Rs. 1, 00,000/- : These are applicable
Causing death per person for death
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
b. Major injuries or accident causing Rs. 20,000/- : injury to any person,
25% or more permanent disablement per person whosoever.
to Workmen or employees
Permanent disablement shall have same meaning as indicated in Workmen’s Compensation
Act. The compensation mentioned above shall be in addition to the compensation payable
to the workmen/employees under the relevant provisions of the Workmen’s Compensation Act
and rules framed there under or any other applicable laws as applicable from time to time. In
case the Owner is made to pay such compensation then the Contractor is liable to reimburse
the Owner such amount in addition to the compensation indicated above.
28.0 CODE REQUIREMENTS
The erection requirements and procedures to be followed during the installation of the
equipment shall be in accordance with the relevant Codes and accepted good engineering
practice, the Engineer’s drawings and other applicable Indian recognized codes and laws and
regulation of the Government of India.
SPECIAL CONDITIONS OF CONTRACT
1.0 General Particulars:
This part of the Bid Document relates to certain specific/special terms and conditions particular
to the Contract. The provisions herein are to be read and understood in conjunction with the
relevant provisions elsewhere in the Instructions to Bidders (ITB), the General Conditions
of Contract (GCC) and Erection Conditions of Contract (ECC). The intent of provisions
herein are specific to this contract and are, in general, supplementary to related provisions
under ITB,GCC and ECC. However, in certain provisions which are contrary to those in ITB,
GCC and ECC, the provisions in these Special Conditions of Contract will prevail.
2.0 Tender Fee:
All the Bidders will be required to pay Tender Fees with applicable GST and EMD as
mentioned in the Tender document either in Cash (up to Rs. 10,000/- only) at the office
address specified in the tender document or by RTGS/ NET/online
3.0 Earnest Money Deposit (EMD):
3.1 All the Bidders will be required to pay Tender Fees with applicable GST and EMD
as mentioned in the Tender document either in Cash (up to Rs. 10,000/- only) at the office
address specified in the tender document or by RTGS/ NET/online
4.0 Declaration by Bidder:
The Bidder shall sign the Declaration enclosed to this SCC and not furnishing the same will
make the Bid invalid.
Seal and signature of Contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
5.0 Technical Qualifying Criteria:
1. Registration: Bidder shall be strictly a GETCO registered contractor of E1 and above class
2 Experience: 1. Bidder shall have executed minimum 01no. of 66/11KV substation with state
or central Transmission Utility or major industries or 1no. control room erection work
including activities mentioned in Schedule-B. 2. The bidder shall have valid Electrical
Contract License and approved vendor of GETCO/ STU/ CTU, registered under sales-Tax
Act, service tax act and should have CPF/ PF registration certificate. Attested Xerox copy
of work orders executed from GETCO and satisfactory completion certificate from
respective department should be submitted.
6.0 Financial Qualifying Criteria:
As per Qualification requirement clause No.- 2 which are mentioned in ITB.
7.0 Price Inclusions (including Taxes & Duties):
7.2 The prices quoted shall be all inclusive of freight, Octroi, transportation, loading, –unloading
& stacking at site of equipment materials received from construction store
K a n s a r i / S o j a R & M S t o r e after observing all store formalities of GETCO .
7.3 No extra payment toward any type of templates and erection tools /materials will be made.
7.5 Goods and Service Tax (GST):
The F.O.R. Destination prices are excluding GST and Cess as applicable which will be paid extra
on a given taxable goods and/or services within the original contractual delivery period. The
aPmount and % of GST and Cess as applicable should clearly be indicated separately.
(GST/Cess means all applicable Tax/Cess under GST Laws. GST Laws means IGST Act, GST
(Compensation to the State for Loss of Revenue) Act, CGST Act, UTGST Act and SGSCT Act,
2017 and all related ancillary legislations).
You shall have to submit a C.A Certificate& duly authorized Signatory of successful bidder,
certifying that you have not claimed Refund of any applicable GST and Cess, charged to
COMPANY or shall not claim any such Refund, on a future date, from the concerned Authorities
and if, any Refund/Credit, in respect of such GST and Cess, is claimed by you, it will be
immediately passed on to the COMPANY, without COMPANY making any specific Claim, for the
same, either from the Department or from you.
The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if the rate of GST
and Cess is not mentioned clearly unless the bidder has opted for Composition Scheme under
GST Act, which should be clearly indicated in the price bid. COMPANY may at its discretion
consider such offer with presumption of highest applicable rate of VAT/GST/Cess prevailing
when the price quoted is inclusive of GST and Cess.
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
If the Supplier/Contractor has opted for the Composition scheme of GST, the same must be
clearly specified with valid Declaration & Certificate from Department. In the event of
withdrawal/cessation of the Supplier from Composition scheme during the tenure of the contract,
the rate mentioned in the price bid shall be final and any additional GST will have to be borne by
the tenderer. In no case additional amount towards tax or otherwise will be paid / reimbursed to
supplier/contractor. Further Statutory Variation clause will not be applicable in case of Supplier /
Contractor has opted for Composition Scheme under GST.
Supplier/Contractor should charge GST in Invoice at the rate as agreed to / mentioned in
acceptance of tender only and any deviation in the same shall not be accepted. Further, any
additional liability of GST (later on due to wrong mentioning of GST rate, mis-interpretation of
HSN/SAC Code, etc.) over and above as charged in the invoice shall be borne by the
Supplier/Contractor. However, any refund received by the supplier / contractor on account of
GST charged from the company; such refund shall have to be passed on to the company, along
with interest if any. Such refund along with interest needs to be passed on suo-moto by the
supplier / contractor.
Further, the Company has a right to recover the amount of GST along with penal interest at the
rate of 15% per annum if GST charged is not paid / short paid to the government or fail to upload
the details or uploads inaccurate particulars on GSTIN portal by the Supplier / Contractor within
the stipulated time limit.
In case, Govt. revises the rate of GST rate / Code during the tenure of the contract, the provision
of GUVNL’s statutory variation clause shall apply.
Also, please mention separate applicable HSN / SAC Code and rate of GST and Cess
as applicable for each item of Goods/Service. If not specifically mentioned, then COMPANY will
have the option to take the prices as exclusive of taxes and duties at maximum higher slab rates
for the evaluation of the tenders.
Every bidder shall inform their GSTIN No. of the registered place(s) where from the bidder
intends to supply the goods / services, meaning thereby the bidder has to supply the goods /
services from the relevant declared / registered place of supply only.
INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Credit and / or due to inclusion of
any other additional item of their inputs / input services under the ambit of the Input Tax Credit
provisions under the GST Act, subsequent to the date of submission of the offer, the same should
be passed on to COMPANY and you should inform such changes to COMPANY from time to
GST Compliances:
The GST at the applicable rates will be levied on the total of Schedule-B. GST on the work
executed will be subject to CGST Act, SGST Act, IGST Act, UTGST Act its rules, regulations
and notifications, circulars issued and in force time to time by Government and M/s. GETCO.
Contractors are required to clarify the product and services related HSN codes and SAC
codes respectively.
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
7.6 Statutory Variations:
Any statutory increase or decrease in the taxes and duties including GST and Cess as applicable
or in the event of introduction of new tax/cess or cessation of existing tax/cess subsequent to
suppliers offer if it takes place within the original contractual delivery date will be to COMPANY’s
account subject to the claim being supported by documentary evidence. However, if any
decrease takes place after the contractual delivery date, the advantage will have to be passed
Statutory Variation clause will not be applicable in case of Supplier / Contractor has opted for
Composition Scheme under GST.
1) As per the Welfare cess Act, the welfare cess @ 1% is applicable on supply and erection
items for supply, erection, testing & commissioning of substation, transmission lines,
EPC/Turnkey projects and civil works.
2) Contractor shall get registered under welfare cess Act before commencement of work. Office
of the factory inspector is authorized at present as a registering authority.
3) GETCO shall pay the welfare cess by way of reimbursing to contractors on production of
documentary evidence of payment.
4) The contacts for which supply or part supply of material are in the scope of GETCO, then
contractors shall deposit welfare cess on estimated cost of supplied items to GETCO
contractor on progressive basis of utilization. As this part of welfare cess is on GETCO
account, the same shall be reimbursed to the contractor on receipt of request letter along
with documentary evidence of payment. For calculation of welfare cess on supply part,
valuation as per MR shall be taken and informed to the contractor for payment. This will
be over and above the A/T value.
The modality of payment/ reimbursement of welfare cess will be as under.
• On receipt of A/T, the contractor / bidder will get them registered under Welfare Cess Act
and submit the documentary evidence to the concern office.
• Before release of payment of first R.A.Bill, the contractor has to submit the documentary
evidence of registration. Only thereafter, the bill will be processed for payment.
• Before release of payment of subsequent R.A.Bills, the contractor has to submit the
documentary evidence of payment of welfare cess of previous R.A.Bill.
• Before release of payment of final bill, the contractor has to submit documentary evidence
of payment of welfare cess of previous R.A.Bill as well as of this final bill.
• If the R.A.Bill happens to be first and final bill, then before release of payment, contractor
has to submit documentary evidence of registration under Welfare Cess Act and evidence
of payment of welfare cess.
• The welfare cess shall be reimbursed to the contractor on submission of copy of documentary
evidence of payment by observing due formalities.
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
7.18 Income Tax
Income tax at source at the prevailing rate will be deducted from bills in accordance with
the provision of Income-Tax Laws and to that effect a certificate will be issued to the contractor.
7.19 TDS under GST:
Tax deduction at source(TDS) under GST at the prevailing rate will be deducted from
bills in accordance with the provision of section 51 of the CGST Act, 2017, and to that
effect a certificate will be issued to the contractor.
8.0 SECURITY DEPOSIT
8.1 The successful bidder has pay security deposit within 10 days of receipt of order.
8.2 The 5% of tender value will be required to be paid either in form of Demand Draft in favor
of “Gujarat Energy Transmission Corporation Limited” payable at Palanpur or in form of “Bank
Guarantee” on acceptance of tender as security deposit at Circle Office, Palanpur. The Security
Deposit will be paid within 10 days of receipt of LOI. No FDR accepted as security Deposit.
Transmission Corporation Ltd. Payable at Palanpur), Bank Guarantee (Format will be given from
As per G. R. No. EMD/10/2016/328/DMO dated: 01/05/2017 of Finance Department, Govt. of
Gujarat, Gandhinagar GETCO accepts Bank Guarantee from the bidders for Security Deposit and
Earnest Money Deposit issued by Banks. In this regard, Finance Department, GoG has issued
above referred G.R. resolving that Government Departments and State Government Boards/
Corporations/ PSUs would accept Bank Guarantee towards Security Deposit and Earnest Money
Deposit issued by any of the following banks:
Guarantees issued by following Banks will be accepted as SD/EMD on permanent basis.
1. All Nationalized Banks including the Public Sector Bank -IDBI Ltd.
2. Private Sector Banks - AXIS Bank, ICICI Bank and HDFC Bank.
Note: Bank Guarantees/Solvency valid for following Bank.
2. AU Small Finance Bank
3. Bandhan Bank
5. City Union Bank
7. DBS Bank India Limited
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
9. Equitas Small Finance Bank
10. Federal bank
14. IndusInd Bank
15. Karnataka Bank
16. Karur Vysya Bank
17. Kotak Mahindra Bank
18. South Indian Bank
19. Standard Chartered Bank
20. Tamilnadu Mercantile Bank
21. Utkarsh Small Finance Bank
22. The Kalupur Commercial Co-Operative Bank Ltd. 23. Ahmedabad Mercantile Co-Operative Bank Ltd.
24. Nutan Nagrik Sahakari Bank Ltd.
25. Rajkot Nagrik Sahakari Bank Ltd.
26. Saraswat Co-Operative Bank
27. SVC Co-Operative Bank Ltd.
28. The Gujarat State Co-Operative Bank
29. The Mehsana Urban Co-Operative Bank Ltd. 30. The Surat District Co-Operative Bank
31. The Surat Peoples Co-Operative Bank
32. Saurashtra Gramin Bank
9.0 GUARANTEE PERIOD:
Total work executed shall be covered under guarantee period against any defect in poor
workmanship etc. for a period of one year from the date of commissioning of substation.
9.0A BAR CHARTS
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
The Bidder shall furnish along with the bid, the bar charts and project schedules indicating
starting and completion dates of each activity. This is mandatory condition the tenders without
which shall be liable to be rejected.
10.0 PENALTY FOR DELAY:
10.1 The tenderer should note that the completion time allowed for carrying out the work should
be strictly observed. Any delay that may take place in supply and erection beyond
Contractual cutoff date stated as per stipulated delivery period shall be subject to the penalty
at the rate of ½ % per week or part there of on delayed portion of the work subject to ceiling
of 10% of total contract value plus GST as applicable will be impose.
10.2 The penalty will be deducted from bills payable either against this contract or from any
Bank Guarantee or any other amount payable under any other contract.
11.0 COMPLETION PERIOD
11.1 Overall Completion period for this Contract will be 03(Three) Months from the date of
commencement of work.
11.2 No mobilization period, idling or stoppage period will be allowed during this period of the
11.3 The completion date will be deemed to be the date on which all works on the Contract are
demonstrated to be complete to the satisfaction of the /Engineer and is complete in all respects
as per the terms and conditions of this Contract.
12.0 Presentation of Bills
12.1 Monthly RA bills for 90% value of the supplied tower material and work executed
including cost of material consumed is to be prepared in triplicate and submitted to Site
Engineers in-charge of the work, for necessary payment. These bills shall be serially
numbered with suffix SE-I.
12.2 Balance 10% payment shall be released only after finalization of material account and
passing of final bill. The contractor has to submit the final bill along with the material
consumption statement and other required data of the work carried out within 3 months
from the date of completion of work. These bills shall be serially numbered with suffix SE-I.
12.3 All the bills in accordance with the above clauses must be submitted with the following
a) Item wise work done during billing
period. b) Item wise cumulative work
c) Account for material consumed and balance stock.
12.4 For non-submission or part submission of above information, an additional 5% amount of the
respective RA bill shall be withheld and shall only be released at the time of final bill.
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
13.0 Terms of Payment
The payment for work done shall be made as under only after execution of the contract
documents/furnishing of Security Deposit and on execution of substation erection work in
scope of work order.
13.1 For erection works.
(i) 90% payment of amount claimed covering various activity such as structure, equipment
erection, earthing installation, control wiring, battery charging etc. works against R.A. bills
duly certified by EIC within 60 days from the date of R.A. bill. OVER AND ABOVE THIS
PAYMENT TERMS MENTIONED ABOVE WILL BE APPLICABLE WHILE RELEASING
(ii) Balance 10% of erection value shall be paid against completion of work only after
Settlement of material account statement of items used, erected and successful
Commissioning of transmission line the same amount will be release in final bill only
and Payment will be made only after passing of final bill.
14.0 TAKING DELIVERY AND INSURANCE:
14.1 The contractor has to take delivery from Palanpur construction store of S/S equipment
and materials and keep in safe custody and transport to the respective sites and will be fully
responsible for any damage to or loss of all materials at any stage during transportation or
erection or taking over of the S/S by GETCO.
14.2 The Contractor has to open site store and ensure for safe custody of all the stored
materials at his own cost.
14.3 The Contractor shall have total responsibility for the entire materials stored, loose, semi
assembled and/or erected by him at site in his custody. The Contractor shall make suitable
security arrangements at his own cost to ensure the protection of all materials, equipment
and works from theft, fire pilferage and any other damages and loss. It shall be the
responsibility of the contractor to arrange for security till the works are finally taken over by
14.4 STORAGE-CUM-ERECTION INSURANCE:-
The contractor shall take suitable storage-cum-erection insurance cover at his cost to the
extent of 100% cost of cost of sub-station / line materials, which are required to complete
the sub-station / line. Bidder shall have to take the comprehensive Marine Cum Erection
(MCE) insurance policy against any loss, damage, theft, pilferage, fire etc. for the complete
period of storage, erection and commissioning up to the time of taking over of the sub-
station / line by GETCO. However, if the work is not completed within stipulated time limit
as mentioned into work order, the MCE shall be extended by the contractor up to the work
completion and taking over of line or SS by GETCO. Moreover, the change for extension of
insurance shall be borne by contractor if the delay is attributed to the contractor. The
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
charge for extension of insurance shall be reimbursed by GETCO to the contractor on
production of proof for extension of MCE if the delay is attributed on the part of GETCO.
The contractor shall deal directly and pursue the claim with the insurance company and
shall be responsible in regard to maintenance of all insurance coverage as well as for
settlement of claim. The proof of insurance policy taken by the contractor shall be
furnished / submitted to engineer-in-charge of GETCO.
No material shall be issued to bidder/erection agency in absence of such insurance policy.
The risk shall be covered for lifting of materials from store to final handing over to GETCO.
Further, in absence of the above insurance policy, R.A. bill payment will be withheld.
14.5 In the event of any damage, theft, loss, pilferage, fire etc., Contractor will be responsible to
lodge, pursue and settle all the claims with the Insurance Company for all items, materials
and the shall be kept informed about it. Contractor shall replace the lost / damaged
materials / items promptly irrespective of the settlement of the claims by underwriter and
ensure that the work progress is as per agreed schedule. The loss, if any, such replacement
will have to be borne by the Contractor and will not entertain any claim / representation
in this regard. However it will be contractor's responsibility to insure the entire project till
the S/S is taken over by the GETCO.
15.0 LABOR LAWS:
15.0.1 Labour below the age of 18 years shall not be employed for the work. No female worker
shall be employed in the night shift between 07.00 p.m. and 06.00 a.m. next day.
15.0.2 Contractor shall maintain a valid labor license under the contract Labor (Regulation and
abolition) Act for employing necessary manpower required by him. In the absence of such
license, the contract shall be liable to be terminated without assigning any reason thereof.
15.0.3 The Contractor shall at his own expenses comply with all labor laws and keep the
indemnified in respect thereof. Some of the major liabilities under various labor and industrial
laws which the Contractor shall comply as under:
i) Payment of contribution by way of Employer’s Contribution towards provident
Fund, Family Pension Scheme, Deposit Linked Insurance Scheme, Administrative
charges, etc. at the rates made applicable from time to time by the Government of
Gujarat / Government of India or other Statutory Authority.
ii) Payment of deposit in respect of each contract labor at the rate of Rs. 30/- or later
prevailing rate with the Office of Commissioner of Labor as per the Contract Labor
(Regulation and Abolition) Act.
iii) License fee as prescribed under the Contract Labor (Regulation and Abolition) Act
and Rules framed there under depending upon the number of workmen.
iv) Paid leave facility and wages as per the provision of the Factories Act at the rate of
one day for every 20 days of working.
v) Identity cards as prescribed under the Factories Act with photo affixed thereto, for
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
identification.
vi) Payment of retrenchment compensation, Notice Pay and other liabilities as per
Industrial Dispute Act. Any payment to the Contractor’s employee arising out of any
claim of disputes under the Industrial Disputes Act 1947 or any other Labor Laws.
vii) Payment of compensation in case of accidental injury.
viii) Provision of crèche if the female laborers employed are more than
ix) Maternity Leave as per the provisions of the Maternity Benefit Act.
The above are some of the major liabilities of the Contractor in addition to other liabilities
prescribed under the various Labor laws, in force from time to time, from Statutory
Authorities like State Government/ Government of India, which the Contractor shall have to
15.1 PROVIDENT FUND AND FAMILY PENSION SCHEME:
The Contractor shall submit along with his bills (month wise) a statement regarding deduction
against employees Provident Fund and Family Pension Scheme in respect of each
concerned employee. Provident Fund and Family pension Scheme at the rate of 18% (or at
the rate made applicable by the Government from time to time of the wages. The Contractor’s
contribution and his workers contribution towards Provident Fund and Family Pension
Scheme shall be deposited by the Contractor with Regional Provident Fund Commissioner,
15.2 DEPOSIT LINKED INSURANCE SCHEME
The contractor shall have to deposit ½ % of the wages in respect of employees who is a
member of the Provident Fund, as the contribution to the Deposit Linked Insurance Scheme
with Regional Provident Fund Commissioner, Ahmedabad.
15.3 ADMINISTRATIVE CHARGES:
Administrative charges for maintaining Provident Fund Account shall be deposited by the
Contractor with Regional Provident Fund Commissioner, Ahmedabad at the rates applicable.
15.4 PAID LEAVE FACILITY:
Paid Leave Facility at the rate of one day for every twenty days worked by the Contract
Labor, shall be provided by the Contractor to his workers. He shall maintain Leave Records,
Leave Cards, for individual laborer, which shall be duly verified, approved and certified by the
authorized Officer of the GETCO.
15.5 WORKMAN’S COMPENSATION FUND AND EMPLOYER’S LIABILITY INSURANCE:
The contractor shall cover all his employees under workmen’s compensation fund and under
the liability insurance. The purchaser shall not be responsible for any payments of
compensation to the workers/supervisor of the contractor for fatal or non-fatal accidents
during the pendency of the contract.
15.6 The contractor shall employ adequate number of experienced skilled at site for daily
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
supervision and for maintenance of various registers and records required under the
law and contract. No payment for supervision shall be admissible
15.7 CONTRCTOR TO INDEMNIFY THE GETCO:
The Contractor shall Indemnify the GETCO and every member officer and employees of
the GETCO also, Engineer-in-Charge and his staff against all actions, proceedings,
claims, demands, costs and expenses whatsoever, arising out of or in connection with the
matters referred herein above elsewhere and against all actions, proceedings, claims,
demands, costs and expenses which may be made against the GETCO or Government
for or in respect of performance of his obligation under the contract documents. The GETCO
shall not be liable for intervention of authority Government for or in respect of performance
of his obligation under the contract documents. The GETCO shall not be liable for or in
respect of or in consequence of any accident or injury to any workman or other person
in the employment of the Contractor or his Sub-Contractor and the contractor shall
indemnify and keep indemnified the GETCO against all claims, demands, proceedings, cost,
charges and expenses whatsoever in respect thereof or in relation thereto.
15.8 WORKMEN’S COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE
Insurance shall be affected for all the Contractor’s employee engages in the performance of
this contract. If any of the work is sublet, the Contractor shall required the Sub-Contractor
to provide workmen’s
employer’s liability insurance for the latter’s employees, such employees shall be covered
Contractor’s Insurance.
15.9 WAGES TO BE PAID & TIME OF PAYMENT ETC. BY THE CONTRACTOR
a) The Contractor shall pay minimum wages per day to his Labors/ Workers as per rates
fixed under the minimum wages act. The wages of every Contract Labor employed by
him under this contract shall also be paid by him before the expiry of 7th day of the
last day of the month in respect of the wages are payable (i.e. wages of a month
have to be paid by him in the first week of the next
month). Any default will result in cancellation of contract forthwith or else the contractor
shall be punishable to the extent of Rs. 100/- per each day or as per the prevailing
rules of Labor laws.
b) The Contractor shall give his Telephone Number and Address to the GETCO, so
that, in case of Labor trouble etc. the Contractor can be contacted. The Contractor
shall arrange to have his office outside the factory work premises and the Contractor
shall arrange to have his office outside the factory work premises and the Contractor
shall keep himself present throughout the working hours.
15.10 REGISTRATION WITH PROVIDENT FUND OFFICE
I) The separate P.F. code issued from P.F. commissioner is required to be taken
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
ii) If the contractor does not possess separate P.F. code number of RPFC, his tender
will not be considered for acceptance.
iii) The contractor should mention separate P.F. code number allotted by PPFC,
along with the tender.
15.11 Termination of Contract:
In case of contractor fails to deliver the stocks or any consignment thereof within
contractual period of delivery or in case the stores are found not in accordance with
prescribed specification and/or the approved sample, the shall exercise its discretionary
15.11.1 To recover, from the contractor as agreed, by way of penalty clause above, or
15.11.2 To purchase from elsewhere after giving due notice to the contractor on account and
at the risk of the contractor for such stores not so delivered or other similar description
without canceling the contract in respect of the consignment not yet due for delivery or
15.12 To cancel the contract.
In the event of the risk purchase of stores of similar description, the opinion of the
GETCO shall be final. In the event of action taken under clause (A) or (B) above, the
contractor shall be liable to pay for any loss which GETCO may sustain on that account,
but the contractor shall not be entitled to have any saving on such purchases made
against default.
The decision of the GETCO shall be final as regards to the acceptability of stores supplied
by the contractor and the GETCO shall not be required to give any reason in writing or
otherwise at any time for rejection of the stores.
15.12.1 MATCHING OF END COST:
In case the GETCO decides to award contract on matching end-cost basis, the bidder has
to reduce all the quoted rates proportionately. The reduction on overall basis will not
be accepted (i.e. all unit rates of erection schedule shall be reduced proportionately
by difference in percentage). The confirmation for matching end cost shall be given
7 (seven) days from the letter
16.0 VENDOR REGISTRATION: REGISTRATION AS A CONTRACTOR:
Registration with Palanpur or any other GETCO office is pre requisite for participating in
tender. It is required to furnish documents of registration along with offer in Technical bid
and the details at appropriate place in confirmation of details of bidder shall be given by
the contractor.
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
1. Relationship with employee: Every bidder should, at the time of submission of bid. Give a
declaration as under “If any bidder company/firm, the interest (i.e. Shareholding in Company and
share in partnership firm) of any employee of the tendering company or his/her relative as defined
in Section 2(77) of the Company’s act 2013 is 10% or more, the tendering Company will not deal
with such Company/Firm at all.” Tendered therefore, must specifically disclose this fact in
his technical bid. Non-disclosure of such facts would immediately disqualify the tenderer
for further dealing with the tendering company.
2. Conflict of Interest among Bidders/ Agents: A bidder shall not have conflict of interest with other
bidders for particular quoted item. Such conflict of interest can lead to anti-competitive practices
to the detriment of Procuring Entity’s interests. The bidder found to have a conflict of interest
shall be disqualified. A bidder may be considered to have a conflict of interest with one or more
parties in this bidding process for particular quoted item, if:
a) they have proprietor/ partner(s)/ Director(s) in common; or
b) they receive or have received any direct or indirect subsidy/ financial stake from any of them; or
c) they have the same legal representative/ agent for purposes of this bid; or
d) they have relationship with each other, directly or through common third parties, that puts them in a
position to have access to information about or influence on the bid of another bidder; or
e) bidder participates in more than one bid in this bidding process. Participation by a bidder in more than
one Bid will result in the disqualification of all bids in which the parties are involved. However,
this does not limit the inclusion of the components/ sub-assembly/ assemblies from one bidding
manufacturer in more than one bid.
f) in cases of agents quoting in offshore procurements, on behalf of their principal manufacturers, one
agent cannot represent two manufacturers or quote on their behalf in a particular tender enquiry.
One manufacturer can also authorise only one agent/ dealer. There can be only one bid from the
following: 1. The principal manufacturer directly or through one Indian agent on his behalf; and
2. Indian/ foreign agent on behalf of only one principal.
g) a Bidder or any of its affiliates participated as a consultant in the preparation of the design or technical
specifications of the contract that is the subject of the Bid;
h) in case of a holding company having more than one independently manufacturing units, or more than
one unit having common business ownership/ management, only one unit should quote. Similar
restrictions would apply to closely related sister companies. Bidders must proactively declare
such sister/ common business/ management units in same/ similar line of business.
i) Bidder shall not act in contravention/ violation to the provisions of competition act, as amended from
time to time. Every bidder should, at the time of submission of bid, give a declaration, that bidder
shall not have conflict of interest with other bidders, as above. Responsibility for correctness
of the information submitted in the bid lies with bidder. If any information furnished in the
bid is proved to be false at a later date, GETCO reserve right to reject the bid and the bid
will not only be rejected but the bidder will be BLACKLISTED as per GUVNL Policy.
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Part II – GENERAL INFORMATION
1.1. SCOPE OF WORK
This specification covers the storage and handling at site, erection, testing, commissioning
and handing over in ready to switch on condition to GETCO of complete equipment / accessories.
of Work of 11KV Control Room Shifting from existing CR to New CR Building with
Dismantling/Erection of equipment, control wiring, yard lighting, Control-Room
Electrification at 66kv Kotda (F) S/S Under Tharad AM Division under Palanpur Circle
etc, as per the Schedule-B and as per approved layout drawing
2.0 INSTRUCTIONS TO THE BIDDER (TECHNICAL) :
2.1. CODES, STANDARDS & REGULATION
2.2. DOCUMENTS REQUIRED FOR APPROVAL:
2.3. FOR REFERENCE
2.4. AS- BUILT DRAWINGS
The successful bidder will give guarantee for the equipments for its workmanship as per GCC
2.6. FUNCTIONAL AND COMPOSITE TESTING
Following test shall be conducted on equipment after completion of erection in the presence of Engineer
-in-charge from point of view of completeness in the presence of’s Authorized Representative.
1 Visual inspection of total system.
2 Verification and measurement of earthing resistance.
3 Checking of cable terminations and laying, dressing etc. in the equipment kiosk and
control panels.
4 Checking of safe accessibility of components.
2.7. BAR CHARTS
The Bidder shall furnish along with the bid, the bar charts and project schedules indicating starting
and completion dates of each activity.
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
TECHNICAL PARTICULARS FOR
Work of 11KV Control Room Shifting from existing CR to New CR Building with
Dismantling/Erection of equipment, control wiring, yard lighting, Control-Room
Electrification at 66kv Kotda (F) S/S Under Tharad AM Division under Palanpur Circle
3.1.1 The scope for erection works covered under this section consist of :
i) Taking delivery of equipment and other material from the GETCO’s stores,
checking them, transporting to site's stores and keeping in safe custody by
ii) To take suitable storage-cum-erection insurance of equipment/materials issued
iii) Distribution of all materials to erection site.
iv) Structure/Equipment e r e c t i o n including fixing of attachments, accessories
and tack-welding of structures.,
v) Stringing of ACSR/AAAC T w i n M o o s e / Z e b r a conductor bus with fixing of
insulators, Hardware, dampers, spacers etc.
vi) Workmanship guarantee of all the activities carried out from (i) to (v).
3.1.2 The successful Contractor shall carry out all addition/alteration required to complete
the substation for commissioning.
3.1.3 The GETCO will supply equipments, structure materials, bolts-nuts, structure accessories
/ attachments, insulators, insulator-hard wares, conductor, accessories, ground
wire, ground wire accessories, GI Earthing strip, Control cable etc. required for erection
of equipments and other associated works.
3.1.4 All works shall be carried out in accordance with the revised and latest Provisions under
Indian Electricity Act and Rules made hereunder.
3.1.5 The contractor at his own cost shall arrange all the erection tools required during
execution of work. The Contractor solely is responsible for any damage and / or loss
of his erection tools.
3.1.6 The Contractor shall be fully responsible for completing all the above works till
the complete substation is taken over by the GETCO, and thereafter up till guarantee
3.1.7 The methods of erection are not dealt with in detail but are left to the Contractor who
shall exercise his own judgment with regards to actual handling of equipments &
materials and in deciding upon the best methods to be adopted for all the erection
3.1.8 The successful bidder shall carryout all the erection works in accordance with structural
drawings, and other erection drawings etc. provided by the GETCO.
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
3.2.0 LAYOUT OF SUB STATION
3..2.1 The proposed layout of the substation is available with concerned field office. The
bidders are presumed to have acquainted themselves with the site before submitting their
3.2.2 The successful bidder has to collect from concerned field office the detailed layout
drawing along with the following drawings for the substation duly approved by the GETCO
immediately on receipt of the Order. He shall also arrange visit of proposed site jointly with
GETCO’s representative for important marks coming across the scope of works under
the contract. Structural drawings of 66 KV Structures listed at Schedule –B
3.3.0 TECHNICAL INSTRUCTIONS TO THE BIDDER
3.3.1. The works shall be carried out strictly as per the erection manuals and shall fully
comply with the relevant Indian Standard. The IE rules and Acts in force from time to
time shall also be applicable during pendency of the contract.
3.4.0 ERECTION AND COMMISSIONING TOOLS & TACKLES.
3.4.1 The contractor shall provide all tools/tackles jigs and fixtures winches, alignment
tools, welding sets, breaker handling devices all consumable items and construction
equipment as required to install the equipment and to complete the work in all respects
and shall necessarily include (but not limited to ) bolts, nuts, rivets, welding rods,
shims, wedges, packing sheets, packing compounds, oil installation and protection
of individual equipment in storage and during erection.
3.4.2 This shall also cover proper alignment, tack welding tagging, laying marking of and
connection of cables, fabrication supply and installation of all support structures for
installation of various electrical equipment and cables
3.4.3 Provision of cable glands, ferrules, and cable lugs tags sealing kit (for HT cables)
shall also be arranged by the contractor.
3.4.4. Erection of various equipment shall be done strictly as per manufacturer's instructions
3.4.6 All additional iron framework erected to put the equipment in operational condition shall
be provided with two coats of primer and two topcoats of finish paint.
3.4.7 Special care shall be taken to make the enclosed equipment protected against entry
of rates, lizard, and creeping reptiles, which may create electrical short circuits.
3.5.0. COMPLETION OF ERECTION (GENERAL)
3.5.1. Equipment shall be considered to have been completely erected when the following
activities have been completed.
3.5.2 Moving of all equipment to the respective foundations
3.5.3. Fixing of anchor bolts or tack welding as required.
3.5.4 Leveling and alignment of equipment.
3.5.5 Assembling of all accessories such as relays, CTs, PTs, meters instruments etc.
as described in the job specifications.
3.5.6. Drying of equipment as required and testing of oil for dielectric strength.
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
3.5.7 Filtration and filling of oil as required.
3.5.8. Cable laying, termination with continuity checks.
3.5.9. Applying of finishing coat of paint wherever required.
3.5.10. Mounting of lighting fixtures & connections.
3.511. Testing of all system with operation of all protection system.
3.6.12 CABLE TERMINATION BOX :
1. Cable termination box for gantry structure shall be completely weather proof confirming to ISW
and provided with lockable door and HRC fuse mounted on fuse carrier and fuse base assembly.
The terminal shall be stud type and suitable for two Nos. 4mm2 cable necessary arrangements for
glanding cable along with supply of gland are included in tender scope.
2. The bolts nuts and screw required for erection is to be supplied by the contractor at his own cost.
3. Outside and inside the cable terminal boxes will be furnished in two coats light grey colours.
4. Finished painted appearance on equipment shall aesthetically pleasing appearance free from dots
and uneven surfaces.
5. Touch up paint at site shall have to be done if necessary.
3.15.0 ERECTION OF CONTROL AND RELAY PANELS.
3.15.1 The contractor shall procure the control and relay panel from site store or any other stores
of the GETCO and transport the same to the erection site. The cases containing the panel
shall be unpacked carefully and shall be nicely cleaned. In case any of external damage
is observed, same shall be brought to the notice of Engineer In charge. The panel shall
be unpacked in upside up position. After an external visual inspection, the panel door
shall be opened and checked for the circuit connection, terminal connector, dehumidifier,
power connection etc.
3.15.2 A front side of the panel shall be checked for any damage to the meter indicator, hooter,
and semaphore indicators
3.15.3 Any lacuna in the equipments, circuits, fittings, dimensions etc. observed shall be brought to
the notice of Engineer in charge who will try to impose remedial measures
3.15.4 The relay panel should also be checked for type, of schemes adopted for protection, internal
connection, fascia indicator etc. Any difference observed should be brought to the notice of
Engineer in charge who will take necessary action.
3.15.5 The panel shall be erected along cut outs provided in the slab concrete, in the order,
it is decided, by Engineer in charge or which is approved by authorized drawing.
3.15.6 The size and number of cores of cables be brought from the equipment to control panel,
control panel to relay panel and back to equipment shall be pre-determined by study.
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
3.15.8 After the erection of control panel and relay, panel, all the equipments, accessories
indicators etc. along with the internal wiring and other accessories provided with the kiosk of
3.16.0 LAYING OF CONTROL CABLES AND TERMINATIONS THEREOF
3.16.1 Laying and termination of control Cable work shall generally Includes following:
a) Control and power cable from individual equipments kiosk to the field kiosk.
b) Laying and termination of Control and L.T power cable from field -kiosk to control room
equipment (i.e. LT switchgear, DC battery and control panel/relay panel.)
c) Laying and termination of Cable from the transformer kiosk to transformer panel and up
to AC/DC supply source.
d) Laying & termination of Control cables from control panel to relay panel and vice a versa.
e) Laying & Termination of cable from DC/AC source, battery room L/T switch gear room to
control/relay panel.
g) Laying & termination of cable from 11KV/400 V Distribution transformer to LT switch gear
h) Laying & termination of cables from Station transformer to distribution transformer in the
switchyard as well as in the residential. Quarter area.
I) Laying & termination of LT power cable from station transformer to fire protection system
kiosk (If required).
3.16.2 GETCO will provide the cable schedule for the various control schemes, protection
schemes and metering scheme as well as communication, scheme etc.
3.16.3 ‘The contractor shall procure’ the required size of control and power cable from the purchaser’s
site store to any other stores from where the same allotted and transport it to its site store.
3.16.4 The control cables shall be terminated using correct type of lugs and further prodded
with ferules giving the identification number of various cores of the cable. Correct type of
tools for termination shall be used to secure a rigid connection of the cable tray along with the
cable trenches. Normally mild steel, racks and cable trays are provided in the cable trench.
However, the purchaser may it its’ own discretion prefer to utilize fiber reinforced poly
propylene (FRP) cable racks and trays. In such an event, the racks and trays will be supplied
by the Purchaser to the contractor in a knocked down condition. The contractor shall assemble
the rack and provide trays on them as per the approved drawing given by the purchaser. If
FRP trays and racks are to be utilized, the contractor will have to take extra care while laying
the cable through different layer and racks to avoid any displacement or distortion of the FRP
racks. However, if the laying of pre-fabricated FRP racks and trays fall in the scope or FRP
rack/tray supplier, the contractor shills co-ordinate and synchronize his cable laying activities
with respective supplier of FRP rack/trays.
3.16.5 Utmost care shall be taken by the contractor to prevent damage to outer insulation and
the armors of the cables. No joint to the cable shall be permitted. Unless situation so warrants
and Engineer in charge permits the same.
3.16.6 After .laying, all the power and control cable shall be properly identified giving the both
a number and details of end connections.
3.18.1 The Contractor shall ensure that at the end of each sub-activity the
Surplus materials are immediately removed from the work-site and the surplus
excavated earth is spreader around to avoid loss or injury to the
public/equipments.
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
3.18.2 The Contractor has to return all surplus materials after reconciliation of material
account in good and useable condition. The contractor shall settle the final bill
including signature on all relevant papers required for passing of final bill,
excess/saving statement and time limit extension proposal. If any within three
months from the date of charging/commissioning or taking over by the GETCO
of the Sub Station.
3.18.3. Most of all equipments should be erected in presence of the concerned
engineer from OEM/GETCO Engineer.
3.18.4. After complete erection and operation, contractor's supervisor should attend
the site whenever called from GETCO for further testing commissioning of
equipments/panels etc.
3.16 MAINTENANCE FREE TREATED EARTHPIT
Seal & Signature of Bidder - 69 -
The bidder shall have to do the entire work of earth pits required for equipment earthing and
for the pits at the corners of earth mat.
The product and the equipment covered by this specification shall, unless otherwise
specifiedbe in line with the requirement of any of the latest applicable standards and will
apply in order of priority as listed below:-
a) Indian Standards
c) ANSI (American National Standards)
d) BS (British Standards)
All the Earth Pit shall be with special Ground electrodes supplied by Reputed Manufacturer.
These special electrodes are provided with Ground enhancement material.
A. EARTHING PRODUCT COMPONENT SPECS
- The Earthing System should be based on use of Copper Bonded Earth Rods / Pipe electrode
/PIP electrode (for corrosion resistance) and Ground Enhancement Material (to reduce Soil
- It should be capable of providing any ohmic value as specified by the client, by
interconnection
of ground rods to form a Grid.
- The system shall be totally maintenance free and require no periodic or scheduled
maintenance for a period of at least 30 years.
- There shall be no requirement to add water or any other chemical any time after initial
- There should be no requirement to have a inspection/maintenance chamber. The system
shall provide constant low ohmic value for entire life cycle without any consideration for
moisture or temperature conditions.
- The system shall be in use world wide for a period of at least 20 years.
- The manufacturer shall be a company of international repute engaged in the field of Facility
Electrical Protection work.
(1) COPPER BONDED EARTH RODS
- The Earth Rods shall have a nominal (actual) dia of 20mm (Min.) and length of 3 M.
- The Rods shall have a steel core with molecular bonding of 250 micron of copper as per
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
international standards.
- A nickel layer is applied to steel core (and subsequently copper) by an electrolytic process
forming a metallurgical bond between the three.
- The copper used shall be type DHP alloy No. 122 CDA and rated at 99.95% copper. The
thickness of copper layer shall be uniform 250 micron.
- The Rods should be manufactured by a company of high repute to ensure quality of Copper
- The Rods should have been subjected to long term study to verify the claims of corrosion
resistivity made by the manufacturers
(2) PIPE or PIP (Pipe-In-Pipe) ELECTRODE
- It shall be capable to carry out the fault current as per GETCO standard considerations.
- It should have been subjected to long term study to verify the claims of corrosion resistivity
made by the manufacturers.
C. GROUND ENHANCE MENT MATERIAL / BACK FILL / GROUNDING
- Ground Enhancement Material/ Backfill / Grounding compound shall be permanent and
maintenance free. (No re- charging with salts or any other chemicals) and shall maintain its
earth resistance with time.
- Ground Enhancement Material/ Backfill / Grounding compound shall confirm IEEE 80-2000
Clause No.14.5 (d)
- It must set up firmly and not dissolve or decompose or otherwise pollute the soil or the local
Seal & Signature of Bidder - 70 -- It shall be suitable for use in dry form or slurry form.
- The Ground Enhancement Material/ Backfill / Grounding compound shall not depend on the
continuous presence of water to maintain its conductivity.
- Ground Enhancement Material/ Backfill / Grounding compound in its set form shall have a
resistivity of not more than 0.12 ohm-m.
- The material should have been subjected to long term study to verify the claims made by
manufacturers about its soil resistivity reducing qualities.
- The material shall have been tested in a reputed laboratory for not containing any hazardous
chemicals as per EPA Chapter-7.
- The material shall be carbon based conductive concrete and shall not contain bentonite in
- The bottom 300 mm of the bore hole shall be filled with good quality preferably black cotton
soil. The balance length of the bore shall be filled entirely with the backfill compound in pure
form without mixing with soil. The compound shall bond tightly with the electrode and
become a solid mass.
- Each Earth Rod/pipe must be provided with a suitable clamp to facilitate Inter-connection of
rods and connection to Equipment Earth Bar using appropriate copper/GI strip or conductor.
The product shall be guaranteed for trouble free operation for a period of 30 years from date
of commission or arrival at site which ever is later. Any defect discovered during this period
shall be rectified free of charge. The pits shall be drawn with the help of a boring machine, an
auger or any other means as required by site conditions and nature of ground strata.
Drawing No. GETCO/E/STD/P-021 (1 of 2 & 2 of 2), DTD.30.07.14 shall be used for
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Important Note:
Terms “CI Pipe Electrode” and “Treated Electrode” shall be replaced by “Maintenance
free Treated Earth pit” wherever written in Earthing Philosophy as well as applicable
equipment earthing drawings.
3.17.1 The Contractor shall ensure that at the end of each sub-activity the
Surplus materials are immediately removed from the work-site and the surplus
excavated earth is spreaded around to avoid loss or injury to the
public/equipments.
3.17.2 The Contractor has to return all surplus materials after reconciliation of material
account in good and useable condition. The contractor shall settle the final bill
including signature on all relevant papers required for passing of final bill,
excess/saving statement and time limit extension proposal. If any within three
months from the date of charging/commissioning or taking over by the GETCO
of the Sub Station.
3.17.3. Most of all equipments should be erected in presence of the concerned engineer
from OEM/GEB engineer.
Seal & Signature of Bidder - 71 -
3.17.4. After complete erection and operation, contractor's supervisor should attend the
site whenever called from GETCO for further testing commissioning of
equipments/panels etc.
3. 18.0 WASTGES:
3. 18.1 The contractor shall make every effort to minimize the breakages, losses and
wastages of line material etc. supplied “ Free of cost “ by the GETCO for line
3.18.2 The maximum ceiling for wastages permitted is as under:
The maximum ceiling for wastages permitted is as under:
Sr no Item % Wastages permitted (Max.)
1 conductor & earth wire 1/2 % (for jumpering & sag)
2 conductor & earth wire 1/2% ( for credit s scarp of cut
(from 10 mtrs up to 30 mtrs)
3 conductor & earth wire 2 % ( for credit in pieces s good
from > 30 mtrs up to 100 mtrs)
4 Insulators 1/4 %
Following material will be supplied b y GETCO “free of cost” for “Work of 11KV Control Room
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Shifting from existing CR to New CR Building with Dismantling/Erection of equipment,
control wiring, yard lighting, Control-Room Electrification at 66kv Kotda (F) S/S Under
Tharad AM Division under Palanpur Circle
1) 11KV/LT equipments with accessories and control and relay panels
2) Various sizes of armored control cables for control wiring of equipments.
3) Earthing materials like GI Strips. Galvanized wire etc.
4) 11KV Power Cable.
5) 11KV Indoor Cable Termination Kits if available with GETCO.
Following materials / equipments will be procured / arranged by the contractor activities
for Work of 11KV Control Room Shifting from existing CR to New CR Building with
Dismantling/Erection of equipment, control wiring, yard lighting, Control-Room
Electrification at 66kv Kotda (F) S/S Under Tharad AM Division under Palanpur Circle
1) Tools tackles required for Sub-Station erection activities.
2) Earthing materials GI pipe, coal, salt etc.
3) All required material for Yard Lighting, Control-Room Industrial Electrification except GI angle
required for fabrication for fixing of ICTPN.
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Sus-Station Equipment/Material will be issued from following Store Centers.
Sr. Name of Sub Station. Store Centers for issue of
No. S/s materials.
1 Work of 11KV Control Room Shifting from existing Kansari const
CR to New CR Building with Dismantling/Erection store/R&Mstore Soja and any
of equipment, control wiring, yard lighting, Control- store of the GETCO or as per
Room Electrification at 66kv Kotda (F) S/S Under instruction of Engineer-in-
Tharad AM Division under Palanpur Circle charge.
Note: 1) Generally all required materials will be issued form above store centers. In case
of non-availability of some items, contractor shall have to collect from other nearby
store centers without extra cost to the GETCO.
2) Bidder shall be note that material/equipment shall be issued from Palanpur/R&M
Safety Penalty Clause:
1. In case if any safety related fatal Elect. / Mech. accident occurred to any employee
of agency or outsider due to negligence or non-compliance of GETCO safety norms
then in addition to the compensation and liability as per statutory requirement, contractor
/ agency shall be penalized as under:
Sr. No Amount of Contract in Rs. Penalty amount
1 Up to -71 Lac Rs.5000
2 Above 1 Lac to -7 10 Lacs Rs.25000
2.1 The contractor shall inform concerned Ex. Engineer Const/TR in writing within
24 hours of fatal/Non-fatal accident occurred to human being.
2.2 The GETCO investigating officer findings in to accident shall be final and binding to the
contractor /Agency.
3. Safety Requirement:
3.1 Kick off Meeting exclusively for safety shall be done in each contract in presence of
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
contractor’s site in charge and supervisor. Safety document shall be handed over and
vital safety norms and key points of safety related to project shall be explained and
recorded for commitment by erection contractor. Such records are mandatory for clearing
first erection bill.
3.2 During site visit by GETCO official of Executive Engineer and above rank, the
following checks during execution of work shall be covered.
3.21 Safety equipments available and utilize.
(b) Safety belt.
(d) Live line Voltage detector
3.2 2 Safety procedures adopted.
a) Permit to work
(b) Earthing at the place of work.
(c) Adequate supervision.
3.23 T & P physical Check. (Healthiness and Quality)
(b) Wire rope and sling.
(c) Earthing rod
3.3 If above-mentioned safety requirements found violated in any of the above three
conditions shall attract penalty of Rs. 1000/-per occasion. (Max.Rs.3000/--for violation of
three conditions)
3.4 During subsequent visit, if violation is found, then double penalty shall be deducted
from the bill of the Contractor/Agency.
SAFETY CUM INDEMNITY BOND
(On Non-judicial Stamp paper of value not less than Rs. 300.00)
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
KNOW ALL MEN BY THESE PRESENTS that we, by this SAFETY CUM
INDEMNITY BOND Executed on this _ Day of 2024. I/We Having
Registered Office (herein after called “THE CONTRACTOR” which
expression shall mean and includes my /our heirs, executors, administrators and legal
representatives, successors and permitted assigns) do hereby binds myself/ourselves and also
our company/firms after having the power to bind by this promise and undertaking in favour of the
Gujarat Energy Transmission Corporation Limited (GETCO), Palanpur a State Transmission Utility
under The Electricity Act, 2003 having its registered office at Sardar Patel Vidyut Bhavan, Race
course, Palanpur.( hereinafter called as GETCO, which expression shall mean and include its
legal representative, administrators assigns) has agreed under the terms and conditions of the
contract no. dated made between and for the contract of the
value of Rs. _ interalia on production of Safety Cum Indemnity Bond.
We do hereby undertake and agree to Indemnify and keep Indemnified GETCO from time to
time to the extent of Rs. Rupees only against any losses or damages, costs, charges
and expenses caused to or suffered by reason of the CONTRACTOR while Project, R&M, O&M
work including work carried out by outsourcing agency, failing to take proper care or not
complying the guidelines given hereunder as per Annexure-A and instructions which may be
given from time to time during the continuance of the contract and we further undertake to
unconditionally pay the amount claimed by the GETCO on demand and without demur to the
extent aforesaid.
Whereas the CONTRACTOR has/have been awarded to execute the job/works under order no.
, dated for issued by the GETCO after having observing necessary formalities,
the details of which is described in the order no. dated and whereas the said
job/works will be /likely to be done in places covered under Employees’ State Insurance Act,1948
(ESI) and /or the Workmen Compensation Act,1923 and /or other laws relating to the Labour
Management and Welfare Act. (Respective Amendments)
And whereas according to the condition of the Contract the CONTRACTOR is under
obligation to execute this Safety cum Indemnity Bond before the commencement of actual
execution of work
Now the indenture witnesses that I/We the CONTRACTOR do hereby undertake to follow the
guidelines as per Annexure-A prepared by the GETCO.
Further we the CONTRACTOR agree that the GETCO shall be sole judge of and as to whether
there has been any breach of the guidelines as per Annexure-A of this bond and as to the extent
of the loss, damages, costs, charges and expenses caused to or suffered by the GETCO.
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
We the CONTRACTOR further agree that our liability under this bond shall not be discharged
because of the change in the constitution of the GETCO or for the extension of the time limit or
for any other reason.
We the CONTRACTOR further agrees to the given terms and conditions:
a. That the CONTRACTOR undertakes /undertake to indemnify and keep harmless the
GETCO from all claims, actions, proceedings and risk, damage danger to any person
whether belonging or not belonging to the. CONTRACTOR.
b. That the CONTRACTOR shall keep harmless the GETCO from all claims, compensation,
damages any proceedings in respect of any of its employee / workmen under the Workmen
Compensation Act or any other laws for the time being in force.
c. That, if during the course of execution of work as stated in the contract order
mentioned hereinabove issued by the OBLIGEE, it is found that the CONTRACTOR has not
complied with guidelines as per Annexure-A or terms and conditions / formalities within the
meaning of Employees’ State Insurance Act,1948 (ESI) or Workmen Compensation Act 1923 or
any other laws relating to the Labour Welfare for the time being in force, and also has not observed
the safety norms in accordance with the law prevailing at the place of work/job to the satisfaction
of the GETCO, the GETCO shall have the right to stop the execution of work/job and the period
of such stoppage shall not be taken into account for the calculation of the total period of
completion of work for which the CONTRACTOR is responsible to complete the work/job
and it will be deemed that discontinuance was due to default of the CONTRACTOR .
d. That, if any time, due to exigency, GETCO as the Principle Employer, becomes liable to pay
any such compensation mentioned hereinabove, whether on
failure of the CONTRACTOR or for any other reason, the GETCO shall have the right to recover
the said amount from any amount receivable by GETCO or any bank guarantee deposited or
anything payable whether in connection with this contract or other contract by the CONTRACTOR
to the OBLIGEE.
e. That the CONTRACTOR is/are aware and accept that for the persistent or
repeated violation of any guidelines as per Annexure-A and terms and conditions mentioned in
this Safety cum Indemnity Bond, GETCO shall have right to terminate the contract of work issued
to the CONTRACTOR .
f. In case if any safety related fatal Electrical / Mechanical accident occurred to any employee of
agency or outsider due to negligence or non-compliance of GETCO safety norms then in addition
to the compensation and liability as per statutory requirement, contractor / agency is hereby
agreed to pay the penalty amount as given below:
Sr. Amount of Contract in
1 Up to -71 Lac Rs.5000/-
Above1 Lac to -7 10 Lacs
4 > 100 Lacs 1.0 % of contract value
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
g. I/We the CONTRACTOR hereby confirm that in case of any dispute/difference for settlement of claims
under this Safety Cum Indemnity bond the courts in Gujarat State wherever job/work is performed or
as per GETCO norms shall have the jurisdiction to decide the rights & liabilities of the parties while
adjudicating the matter of claims under this Safety Cum Indemnity Bond.
h. This Safety cum Indemnity Bond shall continue and hold good until it is released by the GETCO in
Writing on the Contractor’s application after the
Contractor has discharged all his obligations under the order mentioned hereinabove and submitted a
“NO DEMAND CERTIFICATE” from the GETCO under the said order. The Safety cum Indemnity Bond
shall be valid for a CONTRACT PERIOD and renewable thereof (Claim Period).
i. This Safety cum Indemnity Bond and the guidelines as per Annexure-A herein
contained are in addition to And not by way of limitation or substitution for any other guarantee,
indemnities Hereto before given to the GETCO by the CONTRACTOR and this indemnity does not
Revoke or limit such indemnities or guarantees. IN WITNESS WHEREOF the Parties hereto have
executed this indenture the day the year First hereinabove written.
(Signature with seal of The CONTRACTOR)
In the presence of:
Sign & Seal of Contractor Page
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
CONTRACT AGREEMENT
(To be submitting after Awarding of Contract)
(Non-judicial stamp paper of Rs. 300/-)
This agreement is made at GETCO, Circle Office, Palanpur on the _________________day of
__________in the Christian year __________ between
CONTRACTOR” which expression shall unless excluded by or repugnant to context include its successors
or permitted assigns) of the one part and the Gujarat Energy Transmission Corporation Limited, having their
Office at _________________________________________, (hereinafter called “Corporation” which
expression shall unless excluded by or repugnant to the context include its successors or assigns) of the
“WHEREAS” the aforesaid Corporation has accepted the tender of the aforesaid contractors for Work of 11KV
Control Room Shifting from existing CR to New CR Building with Dismantling/Erection of equipment, control
wiring, yard lighting, Control-Room Electrification at 66kv Kotda (F) S/S Under Tharad AM Division under
Palanpur Circle. . as per Corporation’s Order No.
hereinafter called “The works” and more particularly described enumerated or referred to in the specification,
terms and conditions prescribed in the order letter, covering letter arid other letters and schedule of price
which for the purpose of identification have been signed by Shri
________________________________________ on behalf of the Contractors and by
__________________________________________on behalf of the Corporation, a list where of is made out
in the schedule hereunder written and all of which said documents are deemed to form part of this contract
and included in the expression ‘The Works” wherever herein used, upon the terms and subject to the
conditions hereinafter mentioned. AND WHEREAS THE GETCO has accepted the tender of the contractor
for the work of Work of 11KV Control Room Shifting from existing CR to New CR Building with
Dismantling/Erection of equipment, control wiring, yard lighting, Control-Room Electrification at 66kv Kotda
(F) S/S Under Tharad AM Division under Palanpur Circle. . of Gujarat State for the sum of
Rs._______________(Rupees___________________________________) upon the terms and subject to
the conditions herein mentioned.
NOW THIS AGREEMENT WITNESSES AND IT IS HEREBY AGREED AND DECLARED THAT:
1. The contractors shall do and perform all works and things in this contract mentioned and described
or which are implied therein or there from respectively or are reasonably necessary for the completion of
the works as mentioned and at the times, in the manner and subject to the terms conditions and
stipulations contained in this contract, and in consideration of the due provision, executions, construction
and completion of the works agreed to by the contractors as aforesaid, the Corporation doth hereby
covenant with the contractor to pay all the sums of money as and when they become due and payable
to the contractors under the provisions of the contract. Such payment to be made at such times and in
such manner as is provided by the contract.
2. The conditions and covenants stipulated hereinbefore in this contract, are subject to and without
prejudice to the rights of the Corporation to enforce penalty for delays and / or any other rights whatsoever
Sign & Seal of Contractor Page
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
including the right to reject and cancel on default or breach by the contractors of the conditions and the
covenants as stipulated in the general conditions, specifications, forms, or tender schedule, drawing, etc.
attached with Corporation’s Order
3. The contract value, extent of works / supply, completion / delivery dates, specifications and other
relevant matters may be altered by mutual agreement and if so altered shall not be deemed or construed
to mean or apply to affect or alter other terms and conditions of the contract and the general conditions
and the contract so altered or revised shall be and shall always be deemed to have been subject to and
without prejudice to said stipulation.
In witness whereof the parties here to have set their hands and seals this day and month year first above
Signed, Sealed and Delivered by
In the presence of, signature with names and
Signed, Sealed and Delivered by
for and on behalf of Gujarat Energy Transmission Corporation Limited,
In the presence of, signature with names and
Sign & Seal of Contractor Page
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
OUR ENDEVOUR Safety a habit
To create environment where Business Confidence is built through Best Business Practices and is fostered
in an atmosphere of trust and respect between providers of goods and services and their users for the
ultimate benefit of society a the nation, safety guidelines are agreed upon by the agency as under.
Safety is our prime concern and zero accident is our goal. In order to prevent the accident, while execution
of works in indoor and outdoor systems of GETCO, the following guideline and preventive measures are
Indoor safety precaution Outdoor safety precaution
The method of work required T&P and manpower The method of work required T&P and manpower
should be discussed between GETCO should be discussed between GETCO supervisor,
supervisor, contractor’s supervisor and gang leaders.
contractor’s supervisor and gang leaders.
Prior to execution of work a joint survey must be Prior to execution of work a joint survey must be
conducted by GETCO supervisor and contractor’s conducted by GETCO supervisor, contractor’s
supervisor for risk assessment supervisor and DISCOM line man in order to
•Clearly identify the work location, to distinguish identify the following :
between the equipment that is dead and other a. HT/LT line or tap line crossing under each span of
equipment / part that may be live. line of the work.
•Disconnect equipment from supply. b. Isolation point of each line crossing.
•Protect against other live parts. c. Each line crossing & isolation point under each
•Take special precautions when close to bare span must be discussed and noted in maintenance
conductors / Bus bar. register with sketch.
Following safety guidelines are mandatory for all Contractor’s supervisor and GETCO Supervisor
contractors operating in GETCO premises for must ensure all isolations physically with adequate
Electrical, non electrical & civil works. earthing technically prior to give clearance to gang
1. The contractors must provide advance planning leader for taking up job.
of work to concerned incharge of substation in While execution of stringing work, the identified line
writing. crossing must be isolated / deenergized and written
2. Before starting any work whether switch yard, clearance should be obtained from concerned
“permit to allow to work” must be taken from controlDISCOM supervisor.
room incharge. The isolation of Tap line must be physically seen
1. Utilizing Electrical / nonelectrical equipments,
and verified by Contractor and GETCO supervisor.
safety rules must be implemented. At D.O. fuse junction contractors person should be
2. If the work is to be carried out on Sunday orposted to ensure that no person restore D.O. supply
Public holiday, the necessary permission must be while work is under execution
taken in advance, requesting in writing. Contractor’s supervisor must ensure that concern
3. Unwanted person including children of labours officer take LCP for EHV line and power line crossing.
will not be allowed at working site/ in the switchyard
and in the prohibited area.
4. Any electrical work or electrical connections to
Sign & Seal of Contractor Page
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
equipment for any other work must be carried out by
electrician/wiremen with adequate size of wire
through MCB as per I.E. Rule.
-Live penal area / bus bar must be isolated and
sealed / bifurcated with red colour tape for visible
warning. Display Board must hang on LCP panel.
-Transformer must be switched off whenever and
wherever contractor and line workers are not
satisfied with isolation, earthing or any equipment
performance of GETCO, it will be pointed out and
work shall begin only after resolution. Contractor
shall not take up job in absence of GETCO
authorized person. All wire temporary connection &
material whenever erection activity has any
connection and disconnection work of bus bar,
All workers / labour of contractor & All workers / labour of contractor &
supervisors must use personal protective supervisors must use personal protective
equipment (PPE) during the work like equipment (PPE) during the work like
gloves, safety belt, Safety shoes, Helmet, gloves, safety belt, Safety shoes, Helmet,
earthing rods, etc, duly approved by earthing rods, Live line detector etc, duly
GETCO. approved by GETCO.
The local earthing must be done at the The local earthing must be done at the place
place of work before execution of any work. of work before execution of any work.
11 kV breaker in panel must be switched Circuit breaker opening is not an isolation
off and racked out only after ensuring no and isolator on either side must be opened.
voltage in breaker and without door No work during rains and cloudy weather
opening. condition.
Transmission line activities.
1) Used of Voltage detector to ensure
2) Earthing at three point, local, left &
right side of bus bar / string bus.
3) Match line colour code with colour of
Local earthing of electrical equipments like
filter M/c, welding machine, testing kits etc.
Crane shall only be used for material
handling and erection. Working platform
shall only be used for work in switchyard.
Sign & Seal of Contractor Page
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Sub. : As above Mention
In connection with above subject, I / we confirm the following:
a) I/ we, the undersigned, have read and understand the Tender Specification for Work Complete with the
entire tender Terms and Conditions.
b) The price in the bid is firm prices in line with Tender Specifications and shall stand valid till completion of
the Contract, if awarded.
c) I/We declare that our bid is strictly in line with Tender Specifications and there is no deviation. Further, I /
we also agree that additional conditions / deviations, if any found in bid, the offer shall be out rightly
rejected without assigning any reason thereof.
Company / Agency
NAME: STATUS: Name of tendering
Sign & Seal of Contractor Page
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
CONFIRMATION OF DETAILS OF BIDDER
Bidders are required to furnish following information specifying YES / NO
1) Whether the Bid is on percentage basis as called for. Yes / No
2) Whether rebate furnished is in percentage basis as called for. Yes / No
3) Whether the Bid is submitted by RPAD. Yes / No
4) Whether a l l pages of Bid Specifications are sealed and signed by the Bidder.
5) a) Whether the Bidder is registered with for Getco
b) In case of “Yes”, please furnish following details:
i) Registration Letter No. &date.
ii) Class of Registration
c) Whether Bidder is having PF Code No. Yes / No
6) a) Whether EMD/Tender fees paid. Yes/no
7) Whether following documents as specified are submitted.
a) Human Resources detail. Yes / No
b) Availability of tools, equipment’s etc. Yes / No
c) Details of orders executed / on hand Yes / No
d) Financial capability. Yes / No
e) Experience as specified. Yes / No
f) Company's Articles Of Association Yes / No
g) Details Of Partners / Directors Yes / No
h) B.R./P.A. Authorizing Person Yes / No
i) Power of Attorney of Consortium Members Yes / No.
J) Pan card Yes/No
K) GST Registration Yes/No
L) Electrical Contractor registration Yes/No
M) Solvency certificate Yes /No
8) Price: [FIRM ONLY] Yes/No
9) Security terms agreed Yes/no
10) Penalty terms agreed Yes/No
11) Terms agreed: Yes/no
12) Validity of the offer for 180 days from the date of
opening of the technical bid: agreed Yes/No
13 payment terms agreed:
Company / Agency
NAME: STATUS: Name of tendering
Sign & Seal of Contractor Page
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
1) DETAILS OF WORK ORDERS EXECUTED BY THE BIDDER OF VARIOUS SIMILAR
Sr. Order Description Order Order Name of Order
No. No./Date of work Qty.(Bay/ss) Amount placing authority
Completion date as Date of commencement of ual completion of work
2) SATISFACTORY WORK COMPLETION CERTIFICATE
Sr. Description Certificate No Date Order Certificate issuing
No. Amount authority
3) WORKS TENDERED / IN HAND
Details of other Works, tendered for & in hand, as on the date of the Submission of this tender [Tenderers
shall submit the information in the Format detailed here under]
Name Of Work and Anticipate
Location Order Value date of Remarks
No Quantity(Bay/SS)
Signature of Authorized Representative
Company / Agency
NAME: STATUS: Name of tendering
Sign & Seal of Contractor Page
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
FINANCIAL CAPABILITY
Sr. Details Amount Rs. In lacks Remarks
1. Solvency A scheduled Banker’s
Certificate of present
solvency be attached.
2. Price of the biggest job
3 Average Turnover of Last
Signature of Authorized Representative
Company / Agency
NAME: STATUS: Name of tendering
Sign & Seal of Contractor Page
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
1) ERECTION CAPACITY
Based on available men power, tools-tackles, machinery and financial resources, our erection
capacity is as under:
Sr. Name of activity Unit Capacity per No. of Persons per
No. Annum per gang gang.
2) TENDERER’S DETAILS OF PERSONNEL
The List of Technical Personnel intended to be placed at the Work by the Contractor.
[Tenderers shall submit in the Format detailed here under]
Sr. Description Name Qualification Professional Remarks
No. &Details Experience
of position & details of
Contractor’s Representative legible signature: ______________________
Seal of the company
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
This is to declare that none of the Proprietors/ Partners/ Directors are having any relatives employed or
working with Gujarat Energy Transmission Corporation Ltd at any of its offices or its parent Department
Signature of Authorized Representative
Company / Agency
NAME: STATUS: Name of tendering
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
QUALIFICATION REQUIREMENT.
Contractor must fill up below details & should place at the top of the Technical Bid.
Sr No: List of Documents
1 Registration(No, Class)
3 Partnership deed/Proprietor/AOA/MOA
(Notarized copy)
4 Power of Attorney (Notarized copy)
5 Bl. Sheet / P&L A/C, last three years.
6 Latest Solvency certificate.
8 GST registration No
9 Experience certificate As per QR
10 Electrical contractor Certificate valid up to
11 Man and tolls and tackle detail
Signature of Tenderer Company’s Round Seal
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
(UNDERTAKING IN REGARD TO STOP DEAL/BANNED FOR BUSINESS DEALING /BLACK LIST
SUB: Undertaking in regard to stop deal/Banned for Business dealing /Black list thereof)
Ref: Tender no:
All bidders will have to furnish the following undertaking duly filled in, Signed and stamped for each quoted
item of the tender along with the technical bid.
Authorized signatory of M/s _______________________________________________ here by certified
That M/S_____________________________________________________ and their proprietor/any
partner /any director of the firm is not stop deal and/or banned for business dealing and/or black listed by
GUVNL and/or their any subsidiary company viz. GSECL/GETCO/DGVCL/MGVCL/UGVCL/PGVCL.
Seal of Firm Signature of renderer
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
BIDDER’S DETAILS OF PERSONNEL
Firm Type (Proprietary/
Partnership/Corporate )
Contact Person Name and
5 Qualification
6 Professional Experience
9 Contract Details
Note: All the correspondence, queries etc., will be asked on above E-Mail only. Bidder is
responsible to check and operation of e-mail ID.
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
CIRCLE OFFICE, PALANPUR
TENDER SPECIFICATION
“Work of 11KV Control Room Shifting from existing CR to New CR Building with
Dismantling/Erection of equipment, control wiring, yard lighting, Control-Room
Electrification at 66kv Kotda (F) S/S Under Tharad AM Division under Palanpur Circle
TENDER NO. PTC/CM1/N-22/2026
(TO BE SUBMITTED ONLINE – N-Code Only)
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
GUJARAT ENERGY TRANSMISSION CORPORATION LTD.
Subject: Estimate for the proposed New Control Room at 66KV Kotda F S/s under GETCO AM Division
SCHEDULE B- B-1: MAIN ERECTION
Sr. Total Rate Amount
Description of work/Supply Unit
No. Qty. (in Rs.) (in Rs.)
Laying of any size of 11/22kV XLPE cable
including excavation of trench 300 mm
wide & 600 mm deep including laying and
filling up sand of 100 mm layer from
bottom & bricks on three side of cable &
refilling the trench with murram/soil &
1 ramming etc. Required bricks, sand, power Mtr. 1000 138.00
cable marker/ C.I. /G.I. plate etc. will have
to be supplied by the contractor. Rates are
inclusive of shifting of cable drum to the
site from S/S site store. Drum should be
handled only by jacking to avoid damage to
Laying of any size of 11/22kV XLPE cable in
ready made cable trench or in open space.
Rates are inclusive of shifting of cable drum
to the site from S/S site store. Drum should
be handled only by jacking to avoid damage
Removing of any size of existing 11KV XLPE
cable including excavation of trench
3 300mm wide & 600mm deep including Mtr. 1200 69.00
stacking of removed cable as direction by
Installation of earthing strips / MS round
bar in any kind of soil except Rocky(HR/SR)
Soil as per earthing philosophy of GETCO
1) Including digging of 600mm depth and
450mm wide trench.
2) Cutting, bending, laying and fixing of
Earthing grid conductor.
3) 75x10mm / 50x6mm GI strips: Fixing of
two bolt at each straight joints and lap
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
welding, removing oxide films formed
during welding, applying two coats of red
oxide and black powder after welding and
applying zinc rich paint on welded joints.
4) 25/32/36/40MM dia MS Rod: Lap
welding at each straight & cross joints,
removing oxide films formed during
welding, applying two coats of red oxide
and black powder after welding and
applying zinc rich paint on welded joints.
5) Including supply of red oxide paint, black
powder, HDGI Nuts & bolts as per
6) Back filling of the trench with yellow/
Structure & Equipment earthing:
1) Including digging of 600mm depth and
450mm wide trench.
2) Cutting, bending as per required shape,
laying and fixing of risers from Grid to
structures and Equipments.
3) Lap welding, removing oxide films
formed during welding, applying two coats
of red oxide and black powder after
welding and applying zinc rich paint on
welded joints including supply of HDGI
Nuts & bolts for all connections including
suporting to structures etc as per
4) Back filling of the trench with yellow/
b) 50 x 6 mm GI strip / MS round bay up to
and including 25mm
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Supply ,Installation , Testing and
commisioning of maintenanace free
treated earth electrode suitable for
NORMAL SOIL as per drawing No.
GETCO/E/P-021 (1 OF 2) R2 dated 04-06-15
and technical specifications GETCO/E/TS-
Maintenance free earth pits/R1 dated 04-
06-15 for 66/11KV Substations with ground
enhancement material/back fill/ grounding
compound as per IEEE 80 -2000 Clause
14.5 (d) and as per part-7 of IEC -62561
Using copper bonded earth electrode (with
250 micron copper coating ) having 24 mm
dia (min) and 3000 mm length which shall
be capable of handling STC of 25 KA-1 sec.
work also includes providing BB masonary
inspection chamber (manhole) incl. light
Erection of 66kv control panel relay panel
or C/R panel or RTC panel including
grouting of panel, jointing with adjoining
panels including required fabrication for
entry of control cables and complete
vermin proofing. Job includes supply of
required bolts, nuts etc. and shifting of
panel from S/S site store to work site.
Dismentalling of 66KV Control Panel, relay
panel or C/R panel or RTCC panel including
grouting of panel, jointing with adjoining
7 panels with providing required B/N No 12 345.50
including required fabrication for joining
panels & entry of control cables and
complete vermin proofing.
Erection of 11KV CB panel of any make
including grouting, jointing with adjoining
panels & horizontal , vertical levelling
including required fabrication in control
panel or required stone cutting in flooring
for entry of power cable, control cable,
including interpanel wiring and complete
vermin proofing. Job includes supply of
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
required bolts, nuts etc. and shifting of
panel from S/S site store to work site.
Dismentalling of 11KV CB panel of any
make including grouting, jointing with
adjoining panels & horizontal, vertical
levelling including required fabrication for
9 entry of power cable, control cable and No. 27 1038.00
complete vermin proofing, Job includes
supply of required bolts, nuts etc. &
shifting of panels from S/S site store to
-DO- but Erection of LT panel board &
battery charger of any make as per
manufacturers instruction manual
including grouting, vermin proofing etc.
-DO- but Dismentalling of LT panel board &
battery charger of any make as per
manufacturers instruction manual
including grouting, vermin proofing etc.
Erection of 100 AH / 250 AH DC battery set
on wooden stand as per instruction manual
of supplier including first filling of battery
12 solution, proper connection of cells and Set 1 6227.00
applying charging /discharging cycles as
per manufacturer’s / instruction of
engineer in charge
Dismentalling of 100AH / 250AH, 110Volt
13 D.C. battery set on wooden/FRP stand as Set 1 3113.50
per instruction of EIC.
Loading or unloading (including stacking &
segregation) of Batterry set/Battery
charger All class C & R Panel , 11KV Panel,
11KV Station Transformer and LT Panel
Board, DCDB, PLCC panel, RTU panel, FOTE
Erection of 1 Pole Girder structure for XLPE
cable / Neutral Earthig with fixing of
15 channels, angles, necessary fabrication and
fixing of Wooden Clamp on it with
excavation including back filling work,This
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
items includes painting with red oxide and
two coats of silver colour of
Asian/British/Nerolac.(Required girders,
channels, angles, D.O. switches, etc.shall
be supplied by GETCO)
(a) For XLPE cable inclduing supply of 6 Nos.
Wooden clamp for XLPE Cable of station No 2 499.00
16 (b) For Neutral Earthing of X,mer No 2 499.00
Fabrication for erection of any
Equipment/Structure/panel or anywhere L.S.
in s/s & F.B. at other end as per Inst. Of (Max.)
Erection of supporting structure for 11KV
Power Cable termination at 11kv bushing
for 15MVA transformer and station
x'mer(also suitable for erecting DO fuse)
including necessary minor fabrication as
per DGR. & inst. of E.I.C. and painting with
one coat of red oxide and one coat of
alluminium paint. Material for supporting
structure will be supplied free of cost by
Supply & laying of 1 CoreX25mm2,
armroured Copper Cable, multi-strand
flexible of approved make ISI marked in
ready made trench and/or PVC pipe from
Battery Charger to Battery Set including
termination at both side as per inst. of EIC.
Erection of support structure for station
transformer as per GETCO Drawing No:
20 GETCO/E/06S-STD/11 KV STR- A3-03. Job No 1 2,196.00
also include supply & fixing of required
KV L.A. & D.O. fuse and minor fabrication if
rquired as per instruction of EIC.
Providing & fixing on above support str. of
Set of following Items on 11KV support
21 structure system for power cable of Set 2 27303
66/11KV Transformer as per GETCO
drawing and instruction of EIC.
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
1) Allu. alloy bus bar of size
75X20x2000 mm : 03 Nos.
2) 11KV Post Insulator of
PCD 127 mm : 12 No
4) Copper laminated fusion welded flexible
jumper of size 75 X 10 X 600 mm having
2000 Amp capacity : 03 No
Providing of M15 Grade Concrete for
various equipment structure, Guy, 11kV
DP, M.K. Box, Neutral channels, cable
support channel, grouting of Pole/ Flood
light structure with cement, sand & metal
in proportion of 1:2:4 respectively.
1) Work includes muffing with smooth
cement mortar (1:6) finish.
2) Necessary sand, metal, water & cement
shall be supplied by the contractor.
Providing and fixing of various type of sign
Board, sticker, Big Sign Board, earthing pit
board, earthing pit Board & Single line
diagram etc. as per instruction of EIC.
Sticker of red, white, black Letters are to be
utilised for various sign board.
Earthing Pit Board Size:- 6" x 6" -30 Nos.
Safety Slogan Board, Hard Sheet board size
2' x 2'and 4mm thick (Gujarati Language)-
24 Safety Slogan Board, Hard Sheet board size Job 1 24957
3' x 2'and 4mm thick (Gujarati Language)
with red and Yellow colour.-03 Nos.
Single line diagram size 5' x 3' Digital with
Alluminium frame with fitting and as per
approved diagram given by IEC.-01 No.
Big sign board size 5' x 4' and 2mm
thickness indicating sub station name
digital with S.S. rod with hole & as per
approved symbol with fitting charge.-
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Switch yard sign Board 12" X 6" with 2 mm
Thickness black & white Gujarati language.-
Safety Slogen Board size 2" x 6" in side
control room.-05 Nos.
Various type of control room equipment
sticker size-24 cms x 5cms.--18 Nos.
Safety picture board size :- 3' x 3'
(Laminated for O/D use)-03 Nos.
Name plate board of transformer size :- 2'
Cable marker size:- 6" x 6", Radium, fixed
on 750mm long M.S.Rod for fixing
arrengement.- 30 Nos.
Providing and fixing of Radium sticker for
outdoor and Indoor Equipment
25 Identification like LA, Isolator, Circuit Sq. Inch 3000 2.00
Breaker, Transformer, CT, PT, MK Box, C&R
Panels, 11kV Panel borad etc
Providing and Fixing of fire stand from
75mm Gl pipe A class ISI mark heavy duty
having 5ft width and 4ft height as per inst
of Engr. In charge work includes
cutting,drilling,welding of pipe as required.
Fabrication and supply of 16mm dia meter
hook required size for buckets. 4 Nos.of
fire buckets are to be provided fire stand
26 should grouted with excavation of pit size Job 1 4,992.00
300mm x 300mm-2 Nos. of 600mm depth
with 1:3:6 mix muffing 300mm in height
including leveling of stand. The fire stand is
to be painted with post box red colour of
approval quality as per instruction of EIC.
All required approved material including
cement,sand,metal etc are to be provided
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Providing, Fabrication and erection of VHF
set entena support pipe on control room
by providing 25mm dia. GI pipe of length
27 feet including providing & fixing of 4 Nos. Job 1 1498.00
of guy of GI wire 10 SWG. This job includes
painting of GI pipe by good quality paint
white and red alterlatively
Providing & Fixing of
RAYCEM/MSEAL/CABSEAL or equivalent
GETCO approved make heat shrinkable
type 11kV XLPE Indoor/Outdoor cable
Termination kit suitable for 11kV, 3C x
sqmm to 300 sq.mm XLPE power cable.
Providing & Fixing of Aquaguard Toatal
Reviva Water R.O. Plant including
Commissioning & Testing and also with
required peripherals for installation of
plant as per site condition
(1) Dimension: 320 X 275 X 410 mm
(3) Water flow : 8 to 12 LPH
(4) Input power : 230V AC
(5) RO membrence : TFC spiral
You have to provide guarantee for the
12 month from the installation.
Providing and fixing of ISI mark Rubber
Matting sheet Suitable for 11KV Class As
per following specification.
Reference IS:15652-
IS:15652-2006 with latest
Suitable for Voltage Class :B
Max Use Voltage : 11KV
30 AC proof voltage : 22KV 40 4,492.00
Dielectric strength : 45KV
Leakage current : < 10 micro ampere
Make : Vardhman or equivelent (
Rubberhouse India)
Thickness :2.5 mm.
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Surface :Chequred on one side and other
Contractor has to supply Rubber Matting
sheet as per IS:15652-2006 with latest
amendment specification and shall submit
test certificate for routine test as per
Providing & fixing of reputed make ISI mark
Fire Extingusher.with
Extingusher leatest ammendment
Dry chemical powder 9 kg Capacity
31 Note: Contractor shall submit Test No. 2 6,301.00
certificate for routine test as per relevant IS.
32 - Do - but CO2 type - 6.5Kg No. 2 7,047.00
33 - Do - but CO2 type - 22.5Kg No. 2 17817
34 - Do - but Mechanical foam type - 50Ltr No. 1 14499
Erection of station transformer of 22 KV or
11 KV / 430 V on its plinth , grouting of
foundation bolts, fixing of channels, danger
board etc. including connection with
power cable LV cable terminations
including shifting from S/S site store to
plinth as per the instruction of engineer in
Dismantalling of station transformer of
22KV or 11KV/430V, 63/100KVA from its
plinth/DP Structure etc. including Dis-
36 connecting power cable/LV cable No 1 1107.00
terminations including shifting of all types
of materials and equipments as per EIC.
Transportation of Girder, Rail, All types of
substation / tower structures, conductor,
Insulator, Cables, Hardware, G. I. Strips,
Earthwire, Staywire, Furniture,
Transformer oil, Breaker, CT, PT LA, Panels,
Battery set, Battery charger, PLCC
equipment, Isolator, Testing equipment,
etc from GETCO’s nearest Store Centre/
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Substation to another destination including
loading and unloading.
upto 70KMs (Upto 6MT) 3 16848.00
upto 70KMs (Beyond 6MT) -
Beyond 70KMs* 1600 22.00
TOTAL - 1 ( SCHEDULE B - 1 )
SCHEDULE B - 2 : CONTROL WIRING
Description of work/Supply Unit Rate Amount
Preparing of complete schedule of wiring
for line/ transformer bays in triplicate.
1 necessary drawing will be provided by the Bay 9 1996
GETCO. Schedule should be approved by
EE or DE in charge.
Laying of Up to 7 Core Control Cable ,1.1 KV
PVC armored copper/ aluminum cable
inside Hume pipe/cable trench including
binding/clamping of cable with Gl wire as
per requirement including supply and
fixing of identification tags on both ends
and at distance every 10 mtr for following
As above but for, Above 7 Core Control
Laying of Up to 7 Core Control Cable , 1.1 KV
PVC armored copper /aluminum cable in
ground by digging trench of suitable width
4 and 450 mm depth in any type of soil Mtr. 500 21.00
including supply and fixing of identification
tag on both end and at distance every
As above but for, Above 7 Core Control
Dismantalling of Up to 7 Core Control Cable
, 1.1KV PVC, armored copper/ aluminum
control cable in readymade cable trench
and inside Hume pipe including binding /
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
clamping of cable with GI wire or saddles as
per the requirement including the supply
and fixing of identification tags at both
ends in between if required to following
size (Cable will be supplied by GETCO at
As above but for, Above 7 Core Control
Dismantalling of Up to 7 Core Control Cable
, 1.1 KV PVC armored copper /aluminum
cable in ground by digging trench of
8 suitable width and 450 mm depth in any Mtr. 500 10.50
type of soil including supply and fixing of
identification tag on both end and at
distance every 100 mtrs for
As above but for, Above 7 Core Control
Termination of Control Cable at Panel /
M.K./ Equipments including supply of
10 required size of brass cable glands, lugs, End 85 199.00
ferrules, PVC Binding Tape, Buttons etc. for
Up to 7 Core Control Cable.
As above but for Above 7 Core Control
Providing & installation and commissioning
of remote control switch board for ON/OFF
control of all 11kv panel at operator table
with supply of good quality metal sheet box
( 18 SWG ) size 450 x 450 x 125 mm with
door, 25 nos standard ISI make and rating
industrial push botton, indication
12 lamp(LED), terminal connectors fixed on c- Job 1 6489.00
type channel, etc. with installing
accept/reset arrangement with required
ISI marked copper flexible wire size 2.5 Sq.
mm including complete wiring in PVC pipe
and fixing on wall as per inst. of EIC.only
19/27 core x 2.5 sqmm cable supply by
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
Providing and fixing of all weather proof,
cold rolled sheet steel junction box for CVT
& PT, CT terminations with 30 Nos. of
disconnecting type, 'Elmex' make CATDM
or equivalent type connectors and
required no of fuses, links etc.as per
instruction of Engineer-in-charge, as per
approved schedule of cable.
{a} 40mm dia Mtr. 150 255.00
{b} 50mm dia Mtr. 100 284.00
SCHEDULE B - 3 : YARD LIGHTING
Description of work/Supply Unit Rate Amount
Providing & fixing of all weather proof, cold
rolled sheet steel AC Panel - 2 for Yard-
Light AC supply having
(1) 63A 4P MCB : 01 NO
(2) MCX-12 Model (63Amp.)contactor :
(3) Digital Timer : 01 NO
(4) 20A TPN MCB : 06 NOS
1 (5) Indication lamp " 03 NOS No. 1 24732
(6) Push Butten : 02 NOS
(7) Terminal Connector as per site
and other detail as per drawing enclosed
including grouting & Necessary fabrication
of GI Angle or fixing on GI Structure and
earthing with main grid as per instruction
of EIC.as per drawing enclosed
Providing & fixing of all weather proof, cold
rolled steel sheet floor mounted fixed type
single door grey color Main AC Dist box
having size 900x600x250 MM with door
2 closing arrangement and necessary rubber No. 1 20650
Contractor has to supply following
materials with box along with necessary
mounting and wiring.
Seal and signature of contractor
Gujarat Energy Transmission Corporation Ltd
Circle Office, Nr. Circuit House, Palanpur –
Email: [email protected]
(1) L&T/Anchor/Havells Make 100A,4P
(2) L&T/Anchor/Havells Make 63A,4P MCB
(3) 100 A Copper Bus-Bar Link - length
inch size & 25 x 3 MM - 4 Nos.
(4) Tinned Earth Bus 25 x 3 MM Length -
(5) 25 & 16 sqmm Cu. flexible cable - 4 &
Meter respectively.
(6) Required Nos. of Cu. Lugs , etc. as per
instruction of EIC.
Supplying & laying of following size
Control/L.T power cable in readymade
cable trench or by excavating in any type of
soil cable trench size 300mm. wide 600mm
depth and refilling the same as per the
direction of EIC. Item Includes the cable
laying up to termination box with clamps &
proper clamping of cable on gantries by GI
3 pipe & glands as per direction. Item Mtr. 250 292.00
includes providing & supply of bircks, sand
as per requirement. The L.T power cable to
be provided by contractor as under :As per
ISI 1554 (Part-I). 3.5 Core x 50 mm2
Alluminium cable -Armoured, from
distribution X'mer to Main Distribution
Board near dist. X'mer and from MDB to
indoor LT panel board (LTPB) - both 2 runs.
Laying of following size Control/L.T power
cable of FINOLEX or equivalent ISI make in
readymade cable trench or by excavating in
any type of soil cable trench size 300mm
wide and 600mm depth and refilling the
same as per the direction of EIC. Item
Includes the cable laying up to termination
box with clamps & proper clamping of
cable on gantries by GI pipe & glands as per
direction. Item includes providing & fixing
of bricks, sand as per requirement to
protect cables . The L.T power cable is as
Seal and signature of contractor
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Tender Docs Kotda F CR shifting work.pdf
Tender Docs Kotda F CR shifting work.pdf
CORRIGENDUM
Download all tender documents and submit your bid