Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹55.7 LAdmitted-Finance | -0.05% | ₹55.7 L | L1 | Admitted-Finance |
| 2 | L2₹55.9 L+₹13,944.42 (0.25%)Admitted-Finance | +0.20% | ₹55.9 L+₹13,944.42 (0.25%) | L2 | Admitted-Finance |
| 3 | L3₹56.1 L+₹30,677.73 (0.55%)Admitted-Finance 4 N BL K JYANGRA BB 14 17 3 RABINDRAPALLY BAGUIATI KOLKATA 700059 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700059 | +0.50% | ₹56.1 L+₹30,677.73 (0.55%) | L3 | Admitted-Finance |
Tender Value
₹55.8 L
EMD Value
₹1.1 L
Closing Date
25 Mar 2026, 3:00 pmClosed
Executive Engineer
Bidhannagar Municipal Corporation
Construction of road protection wall to protect the roads beside nonapukur area of ward no - 24 under Bidhannagar Municipal Corporation. (Fund- 15th F.C.(Untied) Fund)
2026_MAD_1021098_1
NIT No- 1822/PWD/ROAD/BMC, Dated- 11/03/2026
Open Tender
CIVIL WORKS
Percentage
45 days
Bidhannagar Municipal Corporation
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹1.1 L
2 Jun 2026
11 Mar 2026
27 Mar 2026
11 Mar 2026
25 Mar 2026
11 Mar 2026
Supplying Eucalyptus-bullah piles at work site, including dressing and making one end pointed. (v) 200mm diameter
(ii) 125mm diameter
Coal tarring on wooden surfaces including cost of materials (a) Double coat.
Labour for driving Sal-bullah / Eucalyptus bullah piles by monkey in sorts of soil including hoisting and placing piles in position, protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving appliances and all tackles. (v) 200mm diameter
(ii) 125mm diameter
Walling or roofing fitted and fixed complete with cut drum sheets including the cost of drums, cost of cutting drums and flattening the sheets and cost of necessary nails and screws.
Supplying empty Cement bags in good condition.
Filling empty Cement bags with dry earth or sand, stitching the bag (cost of thread included) and carrying and placing them in position and all incidental charges complete but excluding cost of sand and gunny bags
Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work (ii) With carried earth arranged by the contractor within a radius of 3 km. including cost of carried earth.
Removal of rubbish,earth etc. from the working site and disposal of the same beyond the compound, in conformity with the Municipal / Corporation Rules for such disposal, loading into truck and cleaning the site in all respect as per direction of Engineer in charge
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.92 MB
BOQ_2509849.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .