Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC 00 BHADAR TIKARMAFI BAZAR SULTANPUR UTTAR PRADESH 227413 | AMETHI | UTTAR PRADESH | 227413 | L1 | Accepted-AOC First Lowest | |
| 2 | L2₹3.9 L+₹736.36 (0.19%)Rejected-AOC 494A RAILWAY COLONY 829104 KARGALI BERMO BOKARO JHARKHAND 829104 INDIA | BOKARO | JHARKHAND | 829104 | L2 | Rejected-AOC Second Lowest |
Tender Value
Refer Docs
EMD Value
₹39,000
Closing Date
26 Nov 2020, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Moosa Khand Dam Div Varanasi
Executive Engineer Moosa Khand Dam Division Sigra Varanasi
Construction of VRB at Km 0.900 of Piparaul Minor
2020_UPIDC_531704_6
03 / EE / 2020-21
Open Tender
Civil Works
Item Rate
30 days
Village-Nauli, Post-Dhanapur Chandauli
Please refer Tender documents.
2 documents required · 2 mandatory
₹266
₹39,000
18 Jan 2021
21 Nov 2020
27 Nov 2020
21 Nov 2020
26 Nov 2020
21 Nov 2020
90 days
Amount
Earth work in embankment in all type of soil with manual compaction including cost of all material, labour, T&P etc.
Earth work excavation in foundation without water including cost of all material, labour, T&P etc.
P/L P.C.C. 1:4:8 with stone ballast 20 to 40 mm size coarse sand in foundation including cost of all material, labour, T&P etc. required for proper completion of work.
First class Brick work in 1:4 C.M. with coarse sand including cost of all material, labour, T&P etc required for proper completion of work.
Centering & Shuttering for R.C.C. work in slab including cost of all material, labour, T&P etc. required for proper completion of work.
Cutting, bending, binding of steel for reinforcement in position of T.M.T. bar including cost of all material, labour etc. complete.
P/L R.C.C. 1:1.5:3 in slab and wearing coat including cost of all material, labour, T&P etc.complete.
Cement pointing in 1:2 C.M. including cost of all material, labour, T&P etc. complete required for proper completion of work.
Providing & laying Brick on edge in bed including cost of all material, labour, T&P etc.
ANIL KUMAR SINGH
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .