Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12,228.50Accepted-AOC | ₹12,228.50 Quoted ₹13,486 | L1 | Accepted-AOC Work order placed |
| 2 | L2₹16,791.50+₹3,305.50 (24.5%)Rejected-Finance | ₹16,791.50+₹3,305.50 (24.5%) | L2 | Rejected-Finance QUOTED HIGHER |
| 3 | L3₹18,000+₹4,514 (33.5%)Rejected-Finance | ₹18,000+₹4,514 (33.5%) | L3 | Rejected-Finance QUOTED HIGHER |
| 4 | L4₹26,810+₹13,324 (98.8%)Rejected-Finance | ₹26,810+₹13,324 (98.8%) | L4 | Rejected-Finance QUOTED HIGHER |
| 5 | L5₹27,433+₹13,947 (103.4%)Rejected-Finance | ₹27,433+₹13,947 (103.4%) | L5 | Rejected-Finance QUOTED HIGHER |
Tender Value
₹14.0 L
EMD Value
₹21,000
Closing Date
4 Apr 2022, 5:00 pmClosed
Chief Engineer Distribution South
Chief Engineer Distribution South, Power House Building, Thiruvananthapuram
Repair of faulty Distribution Transformer of rating 100kVA at TMR Paallom
2022_KSEB_482024_1
KSEB/CEDS/TRF REPAIR/TMR PLM/09/21-22/10.03.2022
Open Tender
Repair and Maintenance Works
Item Rate
365 days
PALLOM
Refer Bid document and GCC
6 documents required · 6 mandatory
₹5,900
Yes
₹21,000
Yes
6 Jul 2022
15 Mar 2022
8 Apr 2022
15 Mar 2022
4 Apr 2022
16 Mar 2022
Amount
Opening and examination of faulty tranformers at TMR Store-Dismantling of the core assembly,assessing the quantum of work for repairs,returning the scrap items tostore, loading useful parts to lorry,transporting it to the works of contractor and repairing of the transformer,dryingout core and winding,soldering,braicing of winding connections,cleaning tank,tube conservator,tank etc. including repairing tank refilling transformer with reclaimed transformer oil,circulating the oil,conducting testing as per releventIS,recondition of breather including refilling with new sylica gel,cleaning,scraping,painting,repairing tap switch,changing gsket,bolt,nut, washersetc.. complete testing of transformer and return the repaired transformer to TMR, including loading and unloading etc. complete 100kVA.
Reclamation of transformer oil in the faulty transformer oil in the fauly transformer up to the required BDV level and testing.Wastage allowance up to 10% of the quality indicated in the name plate of transformer will be allowed.
Cost of spares supplied and replced as below:.
HV Coil(Super Enamelled Copper)
HV Coil(Super Enamelled Aluminium)
HV DPC(Copper)
HV DPC(Aluminium)
LV Coil(Super enamelled Copper)
LV Coil(Super enamelled Aluminium)
LVDPC(Copper)
LVDPC(Aluminium)
HV Bushing alone
LV bushing alone
HT bushing rod copper
HT bushing rod brass
LT Bushing rod Copper
LT Bushing rod Brass
HT bushing nut -brass
LT bushing nut-brass
Aluminium Silicagel Breather filled with new gel.
Wheel valvess-bronze
Plug for wheel valves
Conservator plug
Oil guage glass
Arcing horn for HV Bushing
Tap changing switch
Top cover
Conservator tank
Radiator
KERAL TRANSFORMERS
Unipower Systems
Kerala Electrical and Allied Engineering Co. Ltd
UNITECH ELECTRICAL INDUSTRIES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .