| 1 | 1₹9.9 LAccepted-AOC H NO 159 VILL AND P O BHAUWALA NEAR S N PUBLIC SCHOOL RAJAWALA ROAD DEHRADUN UTTARAKHAND 248007 | DEHRADUN | UTTARAKHAND | 248007 | 1 | Accepted-AOC ACCEPT | |
| 2 | 2₹10.0 L+₹9,818.54 (0.99%)Rejected-Finance 60 HILL VIEW COLONY INDIRA NAGAR DEHRADUN 248001 | DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | 2 | Rejected-Finance L2 | |
| 3 | 3₹12.1 L+₹2.2 L (22.2%)Rejected-Finance B 43 CIVIL LINES 1ST FLOOR NAYAPURA KOTA RAJASTHAN 324001 UDYAM RJ 24 0019224 08ABKPA3675N1Z9 R M | KOTA | RAJASTHAN | 324001 | 3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
17 Dec 2022, 5:00 pmClosed
SE O AND M CIRCLE DDUN
SE O AND M CIRCLE DDUN
Work of Providing and Fixing of 33KV Lightning Arresters at all 33KV Feeders Fed from 220KV Substation Jhajhra Dehradun
2022_PTCUX_51863_1
T 14 SE O and M CR DDun 2022 23
Open Tender
Repair and Maintenance Works
Item Rate
60 days
WORK
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
EE O AND M DIVISION PTCUL YAMUNA COLONY DDUN
₹30,000
Yes
15 Sept 2023
23 Nov 2022
21 Dec 2022
23 Nov 2022
17 Dec 2022
23 Nov 2022
Amount
Supply
Complete galvanised structure as per IS 1573-1986 with 150NB Pipe Structure as per IS 1161-1988 (YST22) with 10mm. & 6mm. Thick plate for installation of 33 KV Lighting Arrester at all 3 Phases of each 33kV outgoing Bays - 06 Nos
Procurement of 30KV, 10KA, Class-III Gapless Type Lighting Arrested as per IEC 60099-4 & IS:3070 -1993(Part-3) with panther connectors, Cu leads and lugs including No- reset, type, cyclometric counter surge monitor suitable for 33kV Lighting Arrester wifii safe leakage currrent indication of 0 - 0.2mA suitable for 33kV as per PTCUL technical specificafions and approved drawing
G.I. Earth Strip of size 50 X 6 mm. as per PTCUL technical specifications
MS Steel Bar of various sizes as per drawing (0.05125 per LA Structure)
Anchor Nut Bolt with Double plain and spring washer of size 350mm. X 20ɸ as per drawing
Erection
Erection and Fabrication work for column (CCR), Beam (CGR) and 33kV Lightning Arrester along with surge counter complete in all respect with complete cost of all labour and T&P.
Earth Excavation for LA foundation as per drawing and throwing wastage outside Sub- Station premises complete in all respect with complete cost of all labour and T&P.
Work of shuttering and fixing MS Round Bar in foundation excluding cost of concretting and extavation as per directions of site engineer in- charge as per ing complete in all respect with complete cost of all material, labour and T&P.
Word of laying PCC for the Construction of foundation for LA structure by laying lean pad in 1:4:8 ratio upto 100 mm thickness as per drawing including material labour and T&P.
Laying C.C for Constniction the foundation for LA structure in 1:2:4 cement ,sand concrètes(Blast) 10 mm using 8 SWG steel wire mesh as per drawing including maierial labour and T&P.
12mm. Cement Plaster of mix 1:4 (1 Cement : 4 fine sand) complète in all respect with complete cost of alÎ labour, materiai and TQP.
Back filling of excavated land at plinth site edge o1 foundation by ramming and watering properly complète in all respect with complete cost of all labour and T&P.
Proper Earth riser of all the outdoor/indoor equipment and main / auniliary stnictures by togging from earth mat with GI earthing strips as per standard dcument including cutting, bending, marking appropriate joints with welding, fixing of nuts-bolts and painting work etc complete in all respect with complete cost of all labour and T&P.
Worh of connecting Lightning Arresters of all 3 phase by ensuring all safety parameters and connect the LA parallely with respective 33kV Feeder Line with complete cost of ail labour and T&P.
Work of complete earth Testing of all new connected earthing points of all 3 Phases with Calibrated testing instniments and then submit duly signed test results in 3 copies with complete cost of all labour and T&P required for proper completion of work.
Work of complete mandatory site testing of all new connected 33kV Lightning arresters with Calibrated testing instruments and then submit duly signed test results in 3 copies with complete cost of all labour and T&P required for proper completion of work
Shiv Shakti Construction
M/s Singhal and Co
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .