Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.6 CrAdmitted-Finance | ₹11.6 Cr | L1 | Admitted-Finance |
| 2 | L2₹11.7 Cr+₹8.5 L (0.73%)Admitted-Finance | ₹11.7 Cr+₹8.5 L (0.73%) | L2 | Admitted-Finance |
| 3 | L3₹12.0 Cr+₹35.0 L (3.00%)Admitted-Finance | ₹12.0 Cr+₹35.0 L (3.00%) | L3 | Admitted-Finance |
| 4 | L4₹12.5 Cr+₹83.9 L (7.20%)Admitted-Finance | ₹12.5 Cr+₹83.9 L (7.20%) | L4 | Admitted-Finance |
| 5 | L5₹14.6 Cr+₹3.0 Cr (25.5%)Admitted-Finance NO 91 GROUND FLOOR 3RD CROSS ROAD OPPOSITE VASAVI KANNIKA PARAMESHWARI TEMPLE BENGALURU BENGALURU 560021 KARNATAKA INDIA | BENGALURU | BENGALURU | KARNATAKA | 560021 | ₹14.6 Cr+₹3.0 Cr (25.5%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | GVS Projects Pvt Ltd L4 | Shree Riddhi Siddhi Buildwell Limited L2 | VSR Constructions L3 | SAKTHI ASSOCIATESS L1 | KVR Construction Heights Pvt Ltd L5 |
|---|---|---|---|---|---|---|---|---|
| 1.00General Notes: 1) The Tentative/Suggested makes have been specified in the tender document based on requirements of BARC, desired performance, detailed study of the technical parameters, manufacturing process, quality assurance/control & testing. The list is merely for guidance purpose. However, the bidder(s) can prefer any other make(s) which is/are meeting technical specifications given under Section-V, this schedule of Quantities (Schedule 'B') and shall conform to the technical Parameters/performance of the tentative/suggested makes and / or shall conform to the relevant BIS codes or other relevant codes. In case of non-approved makes(s), the bidders(s) shall suggest such equivalent/alternate make/brand, meeting above -mentioned technical parameters, during pre-bid stage and before submission of bid(s) 2) Rates to be quoted by the bidders should be exclusive of GST for all the items but inclusive of all other taxes, duties, CESS, fee, royalty charges etc. levied under any statue for all the items. | ||||||||
| 2.003) Only sieved river sand/crushed stone sand from Godavari river or Varaha river or Vamsadhara river or Sarada river or Nagavali river / Crushed stone manufactured sand shall be used as fine aggregate and Graded hard broken granite metal of 3 stage (VSI) material shall be used as coarse aggregate in relevant items. Specification for fine and coarse aggregate shall confirm to IS:383 (latest revision) 4) In view of limit on water-cement ratio for durability requirements in design mix concrete, concrete admixtures (Carboxylate based superplasticizers) can be used after taking prior approval of Engineer-in-Charge and the rates quoted for concrete items shall be inclusive of the cost of admixtures, Design mix, trial mixes, testing (at site & at approved labs), etc. complete. 5) The contractor shall set up sufficient number of self loading mobile concrete mixers inside the project area for the production of concrete. 6) Contractor may also be allowed to procure concrete from prior approved RMC plants on prior approval of the BARC subject to maintain required slump at site during pouring.To that extent suitable Mix Design should be carried out with required retention period. No extra payment will be made if concrete is brought from RMC plants outside the project area. 7) Manufacturer's Test certificate of cement which is procured from dealer/company is to be submitted for all cement related works by the contractor. | ||||||||
| 3.008) The Scope of works which are not included in any specific items but indicated in the document "General Scope of all works" shall be within the scope of overall contract works. The cost of work/item/material indicated in this document shall be deemed to be included in the quoted rates of all individual items. 9) For all standards and code of practices, specifications, like Indian Standard, MORT&H, ASTM, etc. refer only latest revisions including all applicable amendments, revisions and additional publications (during contract period) and these have to be followed. 10)Prior approval for source of all construction materials by submission of relavent test certificates, documents, invoices etc. have to be taken from BARC. 11) All the tests mentioned in Quality Assurance Plan(QAP) should be carried out without any extra cost to BARC. 12) The contractor has to submit all royalty /seigneiorage slips,etc for gravel/murrum and for all the other naturally available construction materials along with all RA and final bills failing which payment will not be made to the contrcator. | ||||||||
| 4.00Notes applicable to EARTHWORK EXCAVATION & FILLING WORKS : The rate quoted is deemed to have included the following: a) Removal and cutting of all kinds of vegetation, shrubs, bushes, stumps , roots, grass, weeds, light/heavy jungle etc., trees upto girth of 30 cm when measured 1 metre above ground level alongwith roots, including disposal/stack in the identified location. b) shoring, strutting, stepping, dressing, grading required for keeping the earth in position on sides of trenches with approved timber/steel accessories wherever necessary to prevent sides from falling including bailing or pumping out of water if necessary including removal of debris/unserviceable materials and excavated excess soil, if any. c) dewatering of both ground and surface water, including removal of slurry generated while excavation and keeping the area free from water, to be let out of the building area through proper pipes & channels if required by suitable pumps, d) watering, ramming and thoroughly consolidate the bottom of all excavations & ground before the construction of foundation/footing/plinth beam, filling in basement or other work is commenced. e) the loose pockets shall be excavated and compacted after back filling as directed by Engineer-in-charge, as per detailed specification and conforming to safety rules during progress of the work. f) Contour levels to be taken jointly with the Engineer-in-charge and prior written approval be taken before starting any excavation/ filling at every 3 m grids for arriving at the actual quantity | ||||||||
| 5.00g) Backfilling will be done in layers of thickness as specified below. h) Cost inclusive of necessary royalties, seigneiorage charges and other charges to supply all the required construction materials, i) cost of items shall include all labour charges, hire charges of machinery, lubricants, fuels and tests etc. j) Measurement/Payment will be reststicted to PCC/drawing dimensions only. k) Clearing & grubbing and removal of top 150 mm soil and compaction of the original ground with vibratory power roller to achieve hard and level surface including the disposal of removed top soil within a lead of 200 m from site boundary. l) It shall include necessary excavation, backfilling of pits resulting from uprooting of trees and stumps to required compaction, handling, salvaging, and disposal of cleared materials. | ||||||||
| 6.00 | Earth work excavation in following depths by mechanical means (Hydraulic excavator) / manual means in foundation, in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom of foundations etc. including shoring, strutting and dewatering and refilling around foundations and plinth with selected excavated earth in layers as specified below, well rammed and consolidated, including disposing the surplus earth within a distance of 200 m all complete all as per drawing, Technical specifications and as directed by Engineer-in-charge.
From 0.00m to 1.50m below average GL with refilling of excavated earth in layers of not more than 250mm each layer | 1,300 | CuM | 157.5 ₹2,04,750 | 190 ₹2,47,000 | 156.66 ₹2,03,658 Lowest | 236 ₹3,06,800 | 180 ₹2,34,000 |
| 7.00 | Filling of areas with available excavated soil/soft rock in and around foundations, under basement floors, in plinths and around building etc., including loading, transporting with a lead upto 1000m, unloading, removal of organic matter/roots/plastic/ all kinds of vegetation/small shrubs, etc., braking of lumps and spreading in layers maximum compacted thickness of 250mm thick with suitable Earth rammers/vibro roller to achieve a minimum of 90% proctor density at optimum moisture content with all lifts, bailing/ pumping out of water to keep the site dry while backfilling, etc. complete all as per drawings and Technical specifications and as directed by the Engineer-in-Charge.
Note: All necessary tests shall be conducted as per QAP, cost including all tests. | 1,300 | CuM | 105 ₹1,36,500 | 185 ₹2,40,500 | 78.33 ₹1,01,829 Lowest | 193 ₹2,50,900 | 117 ₹1,52,100 |
| 8.00 | Filling of areas and construction of Embankment/subgrade/ earthen shoulders with approved quality murrum/gravel brought from outside sources including Supply of all materials, in road works and the area wherever specified including breaking clods, storing, transportation, watering, with compacted thickness of each layer not exceeding 250 mm with suitable vibratory roller/ 200 mm thick with 8 to 10 ton capacity power roller to achieve 95% proctor density for embankment & 97% proctor density for Subgrade and Shoulders at optimum moisture content, all leads and lifts, bailing/ pumping out of water to keep site dry while backfilling. Cost shall include conveyance of all materials, labour, machinery, seigniorage charges etc. complete. The rate quoted shall include loading, unloading, hire and fuel charges for tools and plants and other incidental charges etc. The rate quoted shall also include compaction of original ground by vibratory power road roller, complete all as per drawings, specifications and as directed by the Engineer-In-charge. | 9,000 | CuM | 787.5 ₹70,87,500 | 398 ₹35,82,000 Lowest | 414.68 ₹37,32,120 | 910 ₹81,90,000 | 729 ₹65,61,000 |
| 9.00 | Supplying and injecting with approved quality chemical emulsion (Imidacloprid) at the rates and concentrations as per IS 6313 Part II for preconstructional anti termite treatment and creating a chemical barrier under and around the foundations, masonry pits, masonry foundations, wall trenches, plinth filling, junctions of wall and floor, expansion joints, surfaces of RCC works for a depth of min. 500mm from the finished ground level, surrounding pipes, conduits etc., walls retaining soil above floor level, apron and drain along the perimeter of the building including all associated works complete as per specification / IS 6313 and as directed by Engineer-in-charge. (only ground floor plinth area of the building will be measured for the payment in the following three stages).
a) 20% after completion of the foundations/plinth beam.
b) 50% after completion of the ground floor flooring.
c) 30% after completion of all treatment works including ground floor doors & windows and around the building. Work to be executed by approved agency and specified guarantee for 10 (Ten) years shall be furnished by the tenderer. Payment will be cleared only after submission of Guarantee. | 800 | SqM | 183.77 ₹1,47,016 | 85 ₹68,000 Lowest | 1,105.8 ₹8,84,640 | 127 ₹1,01,600 | 118 ₹94,400 |
| 10.00PCC, RCC & FORM WORK Note: 1) Rates quoted for PCC & RCC items shall include cost of sieved river sand/ crushed stone sand as fine aggregate and graded hard broken granite metal of 3 stage (VSI) material as a coarse aggregate. 2) The mix shall be desiged to maintain the desired slump (as required at site/specified in IS code). In view of limit on water-cement ratio for durability requirements in design mix concrete, admixtures (corboxalite based superplasticizers) can be used after taking prior approval of Engineer-in-Charge and the rates quoted for the items shall be inclusive of the cost of admixtures, trial mixes, testing (at site & at approved labs), etc. complete. 3) The contractor shall set up sufficient number of Self loading mobile concrete mixers inside the project area for the manufacture of concrete. 4) Contractor may also be allowed to procure concrete from prior approved RMC plants on prior approval of the BARC subject to maintain required slump at site during pouring. To that extent suitable Mix Design should be carried out with required retention period. No, extra payment will be made if concrete is brought from RMC plants outside the project area. 5) The rate of concrete shall include all labour, equipment, charges for mixing & cost of admixtures. 6) Test certificate of cement, procured from dealer/company has to be submitted for all concrete works by the contractor. 7) Rate quoted for RCC items shall include cost of relevant design mix and testings. | ||||||||
Tender Value
₹12.2 Cr
EMD Value
₹24.4 L
Closing Date
2 Jun 2026, 3:00 pmClosed
Chief Engineer, BARC, Visakhapatnam
BARC(V) main campus, Gajuwaka -Yellamanchili Road, Maduturu Sub Post Office, Visakhapatnam-531 011
Construction of General Office Building and other miscellaneous works at BARC Main campus, Atchutapuram, Near Visakhapatnam, A.P
2026_BARC_906657_1
BARC(V)/CES/GOB/215 Dated 24.04.2026
Open Tender
Civil Works - Buildings
Item Rate
450 days
Atchutapuram, Visakhapatnam
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹24.4 L
Atchutapuram,Visakhapatnam
20 Jul 2026
27 Apr 2026
12 Jun 2026
27 Apr 2026
2 Jun 2026
22 May 2026
27 Apr 2026 - 11 May 2026
11 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1General Notes: 1) The Tentative/Suggested makes have been specified in the tender document based on requirements of BARC, desired performance, detailed study of the technical parameters, manufacturing process, quality assurance/control & testing. The list is merely for guidance purpose. However, the bidder(s) can prefer any other make(s) which is/are meeting technical specifications given under Section-V, this schedule of Quantities (Schedule 'B') and shall conform to the technical Parameters/performance of the tentative/suggested makes and / or shall conform to the relevant BIS codes or other relevant codes. In case of non-approved makes(s), the bidders(s) shall suggest such equivalent/alternate make/brand, meeting above -mentioned technical parameters, during pre-bid stage and before submission of bid(s) 2) Rates to be quoted by the bidders should be exclusive of GST for all the items but inclusive of all other taxes, duties, CESS, fee, royalty charges etc. levied under any statue for all the items. | |||||
| 23) Only sieved river sand/crushed stone sand from Godavari river or Varaha river or Vamsadhara river or Sarada river or Nagavali river / Crushed stone manufactured sand shall be used as fine aggregate and Graded hard broken granite metal of 3 stage (VSI) material shall be used as coarse aggregate in relevant items. Specification for fine and coarse aggregate shall confirm to IS:383 (latest revision) 4) In view of limit on water-cement ratio for durability requirements in design mix concrete, concrete admixtures (Carboxylate based superplasticizers) can be used after taking prior approval of Engineer-in-Charge and the rates quoted for concrete items shall be inclusive of the cost of admixtures, Design mix, trial mixes, testing (at site & at approved labs), etc. complete. 5) The contractor shall set up sufficient number of self loading mobile concrete mixers inside the project area for the production of concrete. 6) Contractor may also be allowed to procure concrete from prior approved RMC plants on prior approval of the BARC subject to maintain required slump at site during pouring.To that extent suitable Mix Design should be carried out with required retention period. No extra payment will be made if concrete is brought from RMC plants outside the project area. 7) Manufacturer's Test certificate of cement which is procured from dealer/company is to be submitted for all cement related works by the contractor. | |||||
| 38) The Scope of works which are not included in any specific items but indicated in the document "General Scope of all works" shall be within the scope of overall contract works. The cost of work/item/material indicated in this document shall be deemed to be included in the quoted rates of all individual items. 9) For all standards and code of practices, specifications, like Indian Standard, MORT&H, ASTM, etc. refer only latest revisions including all applicable amendments, revisions and additional publications (during contract period) and these have to be followed. 10)Prior approval for source of all construction materials by submission of relavent test certificates, documents, invoices etc. have to be taken from BARC. 11) All the tests mentioned in Quality Assurance Plan(QAP) should be carried out without any extra cost to BARC. 12) The contractor has to submit all royalty /seigneiorage slips,etc for gravel/murrum and for all the other naturally available construction materials along with all RA and final bills failing which payment will not be made to the contrcator. | |||||
| 5g) Backfilling will be done in layers of thickness as specified below. h) Cost inclusive of necessary royalties, seigneiorage charges and other charges to supply all the required construction materials, i) cost of items shall include all labour charges, hire charges of machinery, lubricants, fuels and tests etc. j) Measurement/Payment will be reststicted to PCC/drawing dimensions only. k) Clearing & grubbing and removal of top 150 mm soil and compaction of the original ground with vibratory power roller to achieve hard and level surface including the disposal of removed top soil within a lead of 200 m from site boundary. l) It shall include necessary excavation, backfilling of pits resulting from uprooting of trees and stumps to required compaction, handling, salvaging, and disposal of cleared materials. | |||||
| 6 | Earth work excavation in following depths by mechanical means (Hydraulic excavator) / manual means in foundation, in all types of soil other than soft and hard rock, dressing the sides of foundation, ramming of bottom of foundations etc. including shoring, strutting and dewatering and refilling around foundations and plinth with selected excavated earth in layers as specified below, well rammed and consolidated, including disposing the surplus earth within a distance of 200 m all complete all as per drawing, Technical specifications and as directed by Engineer-in-charge.
From 0.00m to 1.50m below average GL with refilling of excavated earth in layers of not more than 250mm each layer | 1,300 | CuM | - | - |
| 7 | Filling of areas with available excavated soil/soft rock in and around foundations, under basement floors, in plinths and around building etc., including loading, transporting with a lead upto 1000m, unloading, removal of organic matter/roots/plastic/ all kinds of vegetation/small shrubs, etc., braking of lumps and spreading in layers maximum compacted thickness of 250mm thick with suitable Earth rammers/vibro roller to achieve a minimum of 90% proctor density at optimum moisture content with all lifts, bailing/ pumping out of water to keep the site dry while backfilling, etc. complete all as per drawings and Technical specifications and as directed by the Engineer-in-Charge.
Note: All necessary tests shall be conducted as per QAP, cost including all tests. | 1,300 | CuM | - | - |
| 8 | Filling of areas and construction of Embankment/subgrade/ earthen shoulders with approved quality murrum/gravel brought from outside sources including Supply of all materials, in road works and the area wherever specified including breaking clods, storing, transportation, watering, with compacted thickness of each layer not exceeding 250 mm with suitable vibratory roller/ 200 mm thick with 8 to 10 ton capacity power roller to achieve 95% proctor density for embankment & 97% proctor density for Subgrade and Shoulders at optimum moisture content, all leads and lifts, bailing/ pumping out of water to keep site dry while backfilling. Cost shall include conveyance of all materials, labour, machinery, seigniorage charges etc. complete. The rate quoted shall include loading, unloading, hire and fuel charges for tools and plants and other incidental charges etc. The rate quoted shall also include compaction of original ground by vibratory power road roller, complete all as per drawings, specifications and as directed by the Engineer-In-charge. | 9,000 | CuM | - | - |
| 9 | Supplying and injecting with approved quality chemical emulsion (Imidacloprid) at the rates and concentrations as per IS 6313 Part II for preconstructional anti termite treatment and creating a chemical barrier under and around the foundations, masonry pits, masonry foundations, wall trenches, plinth filling, junctions of wall and floor, expansion joints, surfaces of RCC works for a depth of min. 500mm from the finished ground level, surrounding pipes, conduits etc., walls retaining soil above floor level, apron and drain along the perimeter of the building including all associated works complete as per specification / IS 6313 and as directed by Engineer-in-charge. (only ground floor plinth area of the building will be measured for the payment in the following three stages).
a) 20% after completion of the foundations/plinth beam.
b) 50% after completion of the ground floor flooring.
c) 30% after completion of all treatment works including ground floor doors & windows and around the building. Work to be executed by approved agency and specified guarantee for 10 (Ten) years shall be furnished by the tenderer. Payment will be cleared only after submission of Guarantee. | 800 | SqM | - | - |
| 10PCC, RCC & FORM WORK Note: 1) Rates quoted for PCC & RCC items shall include cost of sieved river sand/ crushed stone sand as fine aggregate and graded hard broken granite metal of 3 stage (VSI) material as a coarse aggregate. 2) The mix shall be desiged to maintain the desired slump (as required at site/specified in IS code). In view of limit on water-cement ratio for durability requirements in design mix concrete, admixtures (corboxalite based superplasticizers) can be used after taking prior approval of Engineer-in-Charge and the rates quoted for the items shall be inclusive of the cost of admixtures, trial mixes, testing (at site & at approved labs), etc. complete. 3) The contractor shall set up sufficient number of Self loading mobile concrete mixers inside the project area for the manufacture of concrete. 4) Contractor may also be allowed to procure concrete from prior approved RMC plants on prior approval of the BARC subject to maintain required slump at site during pouring. To that extent suitable Mix Design should be carried out with required retention period. No, extra payment will be made if concrete is brought from RMC plants outside the project area. 5) The rate of concrete shall include all labour, equipment, charges for mixing & cost of admixtures. 6) Test certificate of cement, procured from dealer/company has to be submitted for all concrete works by the contractor. 7) Rate quoted for RCC items shall include cost of relevant design mix and testings. | |||||
| 11 | Providing and laying in position cement concrete of 1:3:6 (1 cement, 3 river Coarse river sand/ crushed stone sand, 6 graded stone aggregate of maximum size 20 mm) at all elevations including consolidation, finishing curing etc. complete all as per drawings and technical specifications and as directed by the Engineer-in-Charge but excluding the cost of form work shuttering, centering all as directed by Engineer-in-charge. | 700 | CuM | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.07 MB
TenderDocument.pdf
Tender Documents • 8.70 MB
BOQ_952979.xls
BOQ • 0.54 MB
FORMSATOH.xls
Tender Documents • 0.11 MB
corr_2_215.pdf
PDF • 0.52 MB
corr_1_215.pdf
PDF • 1.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .