Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.7 CrAccepted-AOC | ₹10.7 Cr | L1 | Accepted-AOC Contract Awarded of M/s BKKS Enterprise Vide HQ Letter No.80315/Abut of Modu Br Nacho-TCC/23TF/39/E8 dated 04 Dec 2023 |
| 2 | L2₹11 Cr+₹34.0 L (3.19%)Rejected-Finance ITANAGAR LOWER NITI VIHAR ITANAGAR PAPUMPARE ARUNACHAL PRADESH 791111 | PAPUM PARE | ARUNACHAL PRADESH | 791111 | ₹11 Cr+₹34.0 L (3.19%) | L2 | Rejected-Finance Not Found L1 Bidder |
| 3 | L2₹11 Cr+₹34.0 L (3.19%)Rejected-Finance | ₹11 Cr+₹34.0 L (3.19%) | L2 | Rejected-Finance Not Found L1 Bidder |
| 4 | L3₹11.8 Cr+₹1.2 Cr (10.8%)Rejected-Finance | ₹11.8 Cr+₹1.2 Cr (10.8%) | L3 | Rejected-Finance Not Found L1 Bidder |
| 5 | L4₹12.1 Cr+₹1.4 Cr (13.0%)Rejected-Finance | ₹12.1 Cr+₹1.4 Cr (13.0%) | L4 | Rejected-Finance Not Found L1 Bidder |
Tender Value
₹11.0 Cr
EMD Value
₹8.8 L
Closing Date
27 Oct 2023, 12:00 pmClosed
HQ CE (P) Arunank (GREF),
HQ CE (P) Arunank (GREF), Dam site, Naharlagun, AP
CONSTUCTION OF ABUTS BASED ON APPRD DRGS,R/WALLS, W/WALLS, RETURN WALL, DIRT WALL T/WALL AS PER GROUND REQT OF MODUL BRS AT KM 1.15 (120FT), KM 1.30(110FT),KM 6.60(120FT), KM 8.60(130FT),KM 10.60(100FT),KM 42.630 (100FT) ON NACHO-TCC RD 128 RCC
2023_BRO_620359_1
ANK/NIT-15/2023-24
Open Tender
Civil Works
Works
180 days
ON NACHO- TAMA CHUNG CHUNG ROAD
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹8.8 L
Yes
HQ CE (P) Arunank (GREF),
13 Dec 2023
23 Sept 2023
28 Oct 2023
23 Sept 2023
27 Oct 2023
9 Oct 2023
25 Sept 2023 - 3 Oct 2023
4 Oct 2023
Amount
CONSTRUCTION OF ABUTMENTS (VARIOUS SIZES I.E. HEIGHTS, WIDTHS & SPANS) BASED ON APPROVED DRAWINGS, RETAINING WALL, WING WALLS, RETURN WALL, DIRT WALL & TOE WALL AS PER GROUND REQUIREMENT OF MODULAR BRIDGES AT KM 1.015 (120FT), KM 1.300 (110 FT) , KM 6.600 (120 FT), KM 8.060 (130 FT), KM 10.060 (100 FT) AND KM 42.630 (100FT) ON NACHO- TAMA CHUNG CHUNG ROAD UNDER 128 RCC/ 23 BRTF/PROJECT ARUNANK IN UPPER SUBANSIRI DISTRICT IN THE STATE OF ARUNACHAL PRADESH Construction of Abutments (various heights, widths , spans and locations) as per approved drawings, Retaining walls, Wing walls, Return walls, Dirt wall & Toe wall as per ground requirement/ground data at Km 1.015 (120ft), Km 1.300 (110 Ft) ,Km 6.600 (120 Ft), Km 8.060 (130 Ft), Km 10.060 (100 Ft) and Km 42.630 (100 Ft) on Nacho- Tama Chung Chung Road, Special conditions, Particular specifications of the tender documents as directed by Department, construction of work includes erection of staging / shuttering, temporary river training works / diversions, wing walls, return wall, dirt wall, Retaining Wall and all other items of works required and necessary for the complete construction of abutments of modular bridges.
M/S ARUNACHAL TRADE & COMMERCIAL AGENCY
M/S UNIVERSE AGENCY
M/S T D ENTERPRISE
M/S A L TRADING AGRNCY
Messrs Tama Fabrication Works
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
TenderAbutment_variousModularBrsNacho_TCCNIT15.pdf
Tender Notice • 2.01 MB
BOQ_694552.xls
BOQ Document • 0.25 MB
129992469.pdf
Tender Document • 1.77 MB
129992476.html
Tender Document • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .