Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.3 LAccepted-AOC | L1 | Accepted-AOC Valid | |
| 2 | L2₹11.1 L+₹77,859.83 (7.53%)Rejected-AOC | L2 | Rejected-AOC Valid | |
| 3 | L3₹11.3 L+₹93,796.38 (9.07%)Rejected-AOC | L3 | Rejected-AOC Valid |
| Sl No | Description | Qty | Unit | MUSTHAFA T K L1 | MURUKESAN M L3 | N CHANDRAN L2 |
|---|---|---|---|---|---|---|
| 1.00BUILDING | ||||||
| 1.00 | 10.6.3:Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters.80x0.90 mm M.S. laths with 0.90 mm thick to cover | 21.96 | sqm | 3,170.87 ₹69,632.31 Lowest | 3,420 ₹75,103.2 | 3,409.54 ₹74,873.5 |
| 1.00 | 10.25.2:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works | 250.5 | kg | 165.93 ₹41,565.47 Lowest | 180 ₹45,090 | 178.42 ₹44,694.21 |
| 1.00 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 67.09 | sqm | 153.31 ₹10,286.33 Lowest | 170 ₹11,406.15 | 164.86 ₹11,061.28 |
| 1.00 | 14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand) | 29.13 | sqm | 539.15 ₹15,705.44 Lowest | 585 ₹17,041.05 | 579.74 ₹16,887.83 |
| 1.00 | 50.12.4.2:Providing and fixing false ceiling with 7.5 mm thick PVC wooden grains panel board ceiling of approved quality in aluminium frame work with necessary screws etc complete ( aluminium frame work shall be paid separately) | 156.87 | sqm | 946.36 ₹1,48,455.49 Lowest | 1,025 ₹1,60,791.75 | 1,017.6 ₹1,59,630.91 |
| 1.01 | 21.5:Providing and fixing powder coated aluminium work ( minimum thickness of powder coating 50 micron) consisting of tee /angle sections, of approved make conforming to IS : 733 in frames of false ceiling including aluminium angle cleats with necessary C.P brass/ stainless steel sunk screws, aluminium perimeter angles fixed to wall with stainless steel rawl plugs @ 450 mm centre to centre and fixing the frame work to G.I level adjusting hangers 6 mm dia. with necessary cadmium plated machine screws all complete as per approved architectural drawings and direction of the Engineer-in-Charge ( level adjusting hangers, ceiling cleats and expansion hold fasteners to be paid for separately ). | 47.7 | kg | 786.72 ₹37,526.54 Lowest | 855 ₹40,783.5 | 845.94 ₹40,351.34 |
| 1.01 | 22.6:Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. laying second layer of fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. d) fourth and final layer of brick tilling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured) | 152.52 | sqm | 682.87 ₹1,04,151.33 Lowest | 745 ₹1,13,627.4 | 734.27 ₹1,11,990.86 |
| 1.01 | OD426486/2024-2025:Engaging man coolie | 9 | Day | 1,006.42 ₹9,057.78 Lowest | 1,095 ₹9,855 | 1,082.18 ₹9,739.62 |
| 1.01 | 11.41.2:Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 600 x 600 mm. | 38.44 | sqm | 1,652.13 ₹63,507.88 Lowest | 1,785 ₹68,615.4 | 1,776.49 ₹68,288.28 |
Tender Value
₹11.1 L
EMD Value
₹27,803
Closing Date
16 Jul 2025, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Anil T V
Office of the Assistant Engineer, LID and EW Section, Agali Grama Panchayat
Building Maintenance
2025_LSGD_774824_24
ET-03/AE/LIDEW/AGP/2025-26
Open Tender
Civil Works - Buildings
Item Rate
180 days
Agali
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
Yes
₹27,803
Yes
14 Aug 2025
7 Jul 2025
18 Jul 2025
7 Jul 2025
16 Jul 2025
7 Jul 2025
Amount
BUILDING
10.6.3:Supplying and fixing rolling shutters of approved make, made of required size M.S. laths, interlocked together through their entire length and jointed together at the end by end locks, mounted on specially designed pipe shaft with brackets, side guides and arrangements for inside and outside locking with push and pull operation complete, including the cost of providing and fixing necessary 27.5 cm long wire springs manufactured from high tensile steel wire of adequate strength conforming to IS: 4454 - part 1 and M.S. top cover of required thickness for rolling shutters.80x0.90 mm M.S. laths with 0.90 mm thick to cover
10.25.2:Item Shifted to Sub head 14 as item 14.73 Item Shifted to head 14 as item 14.74 Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work
14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand)
50.12.4.2:Providing and fixing false ceiling with 7.5 mm thick PVC wooden grains panel board ceiling of approved quality in aluminium frame work with necessary screws etc complete ( aluminium frame work shall be paid separately)
21.5:Providing and fixing powder coated aluminium work ( minimum thickness of powder coating 50 micron) consisting of tee /angle sections, of approved make conforming to IS : 733 in frames of false ceiling including aluminium angle cleats with necessary C.P brass/ stainless steel sunk screws, aluminium perimeter angles fixed to wall with stainless steel rawl plugs @ 450 mm centre to centre and fixing the frame work to G.I level adjusting hangers 6 mm dia. with necessary cadmium plated machine screws all complete as per approved architectural drawings and direction of the Engineer-in-Charge ( level adjusting hangers, ceiling cleats and expansion hold fasteners to be paid for separately ).
22.6:Providing and laying water proofing treatment on roofs of slabs by applying cement slurry mixed with water proofing cement compound consisting of applying : a) after surface preparation, first layer of slurry of cement @ 0.488 kg/ sqm mixed with water proofing cement compound @ 0.253 kg/ sqm. laying second layer of fibre glass cloth when the first layer is still green. Overlaps of joints of fibre cloth should not be less than 10 cm. c) third layer of 1.5 mm thickness consisting of slurry of cement @ 1.289 kg/ sqm mixed with water proofing cement compound @ 0.670 kg/sqm and coarse sand @ 1.289 kg/sqm. This will be allowed to air cure for 4 hours followed by water curing for 48 hours. The entire treatment will be taken upto 30 cm on parapet wall and tucked into groove in parapet all around. d) fourth and final layer of brick tilling with cement mortar (which will be paid for separately. For the purpose of measurement the entire treated surface will be measured)
OD426486/2024-2025:Engaging man coolie
11.41.2:Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS : 15622, of approved make, in all colours and shades, laid on 20 mm thick cement mortar 1:4(1 cement : 4 coarse sand), including grouting the joints with white cement and matching pigments etc., complete.Size of Tile 600 x 600 mm.
50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
OD56917/2025-2026:PVC WEEP HOLES - Providing weep holes using 75mm dia. PVC pipes working pressure 4kg/sq.cm including cost of materials, conveyance, labour charges etc. complete.
13.82.2:Wall painting with acrylic emulsion paint, having VOC (Volatile Organic Compound) content less than 50 grams/ litre, of approved brand and manufacture including applying additional coats wherever required, to achieve even shade and colour.Two coats
N CHANDRAN (BID ID -2251297)
MURUKESAN M (BID ID -2251576)
Bidder Name
MUSTHAFA T K
MURUKESAN M
N CHANDRAN
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .